IP survey completed and infill sampling programs commence
Released
Released
Announcement PDF
ASX RELEASE | 22nd January 2024
IP SURVEY COMPLETED AND INFILL SOIL
SAMPLING PROGRAMS COMMENCE AT MT
SHOLL PROJECT
Highlights
•
•
ASX CODE: RDN
Infill soil sampling program has commenced at Mt Sholl Lithium
Project (E47/3181)
Previous soil sampling program defined several distinct lithiumin-soil trends at Mt Sholl Lithium Project1
o Soil geochemistry delineated a Lithium-in-soil trend with
3.5km strike length, with peak value of 298ppm Li2O,
extending across the north-central part of the tenement,
and
o A Lithium-in-soil trend with 2.5km strike length, with
peak value of 404ppm Li2O, defined in the south-eastern
part of the permit
•
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Warrick Clent
Infill soil sampling will also follow up on Ni-Cu soil anomalies on
Mt Sholl (E47/3181) on behalf of First Quantum Minerals Ltd2
o Two separate Nickel-in-soil trends, both with coherent
1.2km strike lengths defined, with peak value of
1,770ppm Ni in the west-central part of the tenement
ASSET PORTFOLIO
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
•
First Quantum IP survey completed over the B2 Ni-Cu-PGE
deposit as part of their due diligence program, results still
pending, with next planning steps underway
•
Raiden has recently secured 100% of LCT & Ni-Cu-PGE Mineral
Rights at Mt Sholl3
•
Raiden working closely with the Traditional Owners, through the Ngarluma Aboriginal
Corporation, to schedule heritage surveys across the Andover South and North project
areas
Page 1 of 15
AUSTRALIA
Li, Au, Cu, Ni & PGE
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 22nd January 2024
Raiden Resources Limited (ASX: RDN DAX: YM4) (“Raiden” or “the Company”) is
pleased to update shareholders on the current work programs underway on the Company’s
Mt Sholl and Andover Projects.
Based on the positive results from the recently completed lithium-caesium-tantalum (“LCT”)
soil sampling program over the Mt Sholl North (E47/3181) tenement, reported in December
20231, the Company has now commenced an infill soil sampling program to define the
potential lithium mineralisation more closely in this area.
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “Management is pleased
that we have maintained our operational momentum throughout the December period, with
ongoing work by First Quantum on the Ni-Cu project, which itself has defined new prospects
for follow up. In parallel the Company has implemented a new infill program to further refine
the lithium anomalies on the Mt Sholl lithium trend. While this work is ongoing, our key
objective remains the completion of the heritage surveys across the Andover project area as
soon as possible. Management have continuously engaged with all stakeholders on an ongoing
basis and we hope with the completion of the holiday period that the surveys will be achieved
in the near term.”
As with the maiden program the objective of this program is to assist in defining the most
prospective areas of the project for potential drill testing, as well as provide insight into the
potential zoning of the mineralised system. While a significant part of Mt Sholl project
geology is outcropping, certain parts of the project area are obscured by transported cover
making soil sampling an integral exploration tool for the area.
Page 2 of 15
ASX RELEASE | 22nd January 2024
Figure 1: Mt Sholl Project with the proposed infill soil sampling overlain by the lithium results of
Raiden’s 2023 soil sampling program1
A total of 823 samples are planned to be collected during the current program, which will
bring the sampling density to 100m x 50m in the areas of interest, as defined in the 2023
soil sampling program (see Figure 1).
As part of the current program, the sampling crew will also be collecting samples on behalf
of First Quantum across zones of Ni-Cu soil anomalism on E47/3181.
The zones identified for further sampling are separated from the lithium-in-soil anomalies,
and the current extent of the main anomaly is 1.2km x 0.4km, in an east-west trend, within
the central northern part of the tenement. Further zones of interest are located along the
western part of the tenement within a coherent zone trending northwest-southeast
extending for 1.2km, and with a maximum width of 0.3km. These zones can be seen in
further detail in Figure 2 below.
Page 3 of 15
ASX RELEASE | 22nd January 2024
Figure 2: Mt Sholl Project with the nickel results of Raiden’s 2023 soil sampling program
As previously announced, the initial 2023 soil sampling program defined several distinct
geochemical trends. A +30ppm lithium soil trend in the central western part of the permit
area extends along a 3.5km east-west trending corridor, with peak values of 138.5ppm
lithium (298ppm Li2O). The strike of the trend aligns with GreenTech Metals Ltd4 (ASX:GRE)
released lithium-in-soil anomalies, positive rock sampling, and their recently announced
intersection of pegmatites in drilling (Figure 3). The highest values are in the western part of
the project area.
A >50ppm lithium soil anomaly in the southern part of the license extends over a 2.5km
strike extent, with a peak value of 187.5ppm lithium (404ppm Li2O). This trend does not seem
to be associated with any of the known anomalies/trends in the district and is a new target
area which the Company will evaluate through the upcoming programs.
Page 4 of 15
ASX RELEASE | 22nd January 2024
Figure 3: Mt Sholl Project with the results of Raiden’s lithium soil sampling program1, in relation to
GreenTech Metals Ltd’s Osbourne JV results4
Induced Polarisation (IP) survey
During December 2023 First Quantum completed an IP survey over the northern extent of
the Mt Sholl B2 Ni-Cu-PGE deposit. The aim of this IP survey was to trial the method over
the known mineralisation to define the potential response within the disseminated style of
mineralisation. If the orientation survey produces sufficiently strong/coherent anomalies,
further use the IP survey method may be utilised to evaluate a greater area across the entire
intrusion. Results of the survey have not yet been finalised.
First Quantum are currently reviewing the results of the IP survey, and once the review has
been completed will be planning additional work over the Mt Sholl Ni-Cu-PGE deposits, and
which may include a ground electromagnetic (EM) survey.
Andover Project Update
The Company continues to engage proactively with the Traditional Owners, through the
Ngarluma Aboriginal Corporation, to schedule heritage surveys across the Andover South
Page 5 of 15
ASX RELEASE | 22nd January 2024
and North project areas, with the clear aim of ensuring the Traditional Owners knowledge
of the area is used to avoid areas of cultural significance.
Raiden remains committed to conducting these heritage surveys as soon as possible and
once the timing of these surveys has been finalised the Company will inform shareholders.
Figure 4: Raiden’s Mt Sholl lithium project in relation to Raiden’s Pilbara portfolio of projects,
infrastructure and key discoveries in the district
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
Page 6 of 15
ASX RELEASE | 22nd January 2024
ASX Announcements referenced to directly in this release
1
ASX:RDN 5 December 2023 Multiple lithium soil anomalies defined at Mt Sholl project
2
ASX:RDN 13 December 2023 Raiden enters strategic partnership with FQM at Mt Sholl
3
ASX:RDN 12 December 2023 Raiden secures 100% of LCT & Ni-Cu-PGE Mineral Rights
4
ASX:GRE 29 November 2023 Maiden diamond Hole completed Osborne Joint Venture
Competent Person's Statement and Previously Reported Information
The information in this announcement that relates to exploration results is based on and fairly represents
information and supporting documentation, and has been reviewed and approved by Mr Warrick Clent, a
competent person who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Warrick
Clent is employed by Raiden Resources Limited. Mr Warrick Clent has sufficient experience that is relevant to the
style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 edition of the JORC Code. Mr Warrick Clent has provided his prior
written consent as to the form and context in which the exploration results and the supporting information are
presented in this announcement.
The information in the referenced announcement 1, 2 and 3 footnoted above that relate to Exploration Results
has previously been released to the ASX. The Company confirms that it is not aware of any information or data
that materially affects the information included in the market announcements, and that all material assumptions
and technical parameters underpinning the announcements continue to apply. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
Page 7 of 15
ASX RELEASE | 22nd January 2024
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South, Mt Sholl and Arrow lithium projects. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region
of Western Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Appendix
Table 1: Tenement Schedule
Tenement
E47/3468
E47/4309
E47/3339
P47/1762
P47/1787
P47/1788
P47/1789
P47/1790
P47/1791
P47/1792
P47/1793
P47/1794
P47/1795
E47/3181
P47/2024
Page 8 of 15
Holder
Grant Date
Expiry
Area
RDN Equity
%
Pilbara
Gold
Corporation
Pty Ltd
(Raiden
Resources
Ltd.’s 100%
owned
subsidiary)
12/09/2017
24/07/2020
14/09/2016
01/09/2016
24/01/2017
24/01/2017
24/01/2017
30/11/2018
02/08/2018
02/08/2018
30/11/2018
30/11/2018
30/11/2018
13/08/2015
08/12/2023
11/09/2022
23/07/2025
13/09/2026
31/08/2024
23/01/2025
23/01/2025
23/01/2025
29/11/2022
01/08/2022
01/08/2022
29/11/2022
29/11/2022
29/11/2022
12/08/2025
07/12/2023
1Bl
2Bl
1Bl
139 Ha.
188 Ha.
200 Ha.
148 Ha.
197 Ha.
177 Ha.
193 Ha.
197 Ha.
157 Ha.
146 Ha.
5Bl
5 Ha.
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Comment
Covered
by NAC
Heritage
Agreement
ASX RELEASE | 22nd January 2024
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative nature
of the samples.
• Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
• Soil samples was collected at 50m intervals
along north-south lines spaced 400m apart
from a consistent depth of 15-20cm with
approximately 200g collected and placed into
individually labelled paper Geochem packets.
• Samples were dispatched to ALS Global
Laboratories in Perth for analysis.
Drilling
techniques
Drill sample
recovery
Logging
Page 9 of 15
• In relation to this announcement no drilling by
Raiden has been conducted as yet and no
assays are being reported
• In relation to this announcement no drill
sampling by Raiden has been conducted as yet
and no assays are being reported
• In relation to this announcement no drilling by
Raiden has been conducted as yet.
ASX RELEASE | 22nd January 2024
Criteria
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Page 10 of 15
JORC Code explanation
Commentary
mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core taken.
• ALS Global have followed standard
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
procedures for sample preparation to produce
sampled wet or dry.
sub-samples for analysis
• For all sample types, the nature, quality and appropriateness of the sample
• The laboratory reported the use of standards
preparation technique.
and blanks as part of the analyses for QA/QC
• Quality control procedures adopted for all sub-sampling stages to maximise
for determination of mineral content.
representivity of samples.
• No standards or blanks were submitted by the
• Measures taken to ensure that the sampling is representative of the in situ
company
material collected, including for instance results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• The nature, quality and appropriateness of the assaying and laboratory
• Laboratory procedures and assaying are
procedures used and whether the technique is considered partial or total.
considered appropriate by the CP for the type
of sample.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
• Assaying of the soil samples was conducted
model, reading times, calibrations factors applied and their derivation, etc.
by ALS Global Laboratories in Perth using
their ME_ICP89 & ME_MS61 analysis
• Nature of quality control procedures adopted (eg standards, blanks, duplicates,
technique.
external laboratory checks) and whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
• The laboratory reported the use of standards
and blanks as part of the analyses for QA/QC.
• No standards or blanks were submitted by the
company but it is noted that ALS Global
insert laboratory standards and blanks as part
of their analysis.
ASX RELEASE | 22nd January 2024
Criteria
JORC Code explanation
Verification
of sampling
and
assaying
• The verification of significant intersections by either independent or alternative • All significant assay results have been
verified against the results reported by ALS
company personnel.
Global Perth by two experienced company
• The use of twinned holes.
personnel.
• Documentation of primary data, data entry procedures, data verification, data
• All primary data has been uploaded into the
storage (physical and electronic) protocols.
company’s data storage with standard data
• Discuss any adjustment to assay data.
entry protocols checked and verified by two
experienced company personnel.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Sample points were determined by hand held
GPS which is considered appropriate for the
reconnaissance nature of the sampling.
• Co-ordinates are provided in the Geocentric
Datum of Australia (GDA94) Zone 50.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Not applicable due to the reconnaissance
nature of the sampling.
• No attempt has been made to demonstrate
geological or grade continuity between
sample points.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Not applicable as in relation to this
announcement no drilling by Raiden has been
conducted as yet.
Sample
security
• The measures taken to ensure sample security.
• For the current sampling program the sample
chain of custody is managed by Raiden. All
samples were collected in the field at the
project site in number-coded calico
bags/secure labelled polyweave sacks by
Raiden’s geological and field personnel. All
Page 11 of 15
Commentary
ASX RELEASE | 22nd January 2024
Criteria
JORC Code explanation
Commentary
samples were delivered directly to the
associated carrier, RGR Road Haulage, by
Raiden personnel before being transported to
the ALS laboratory in Perth WA for final
analysis.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
• No review of the sampling techniques has
been undertaken.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
• Raiden Resources Ltd tenements are located in the City of Karratha,
within the Pilbara region of Western Australia.
• The tenements are held by Raiden Resources Ltd 100%.
• Tenements are located on the Mt Welcome pastoral lease.
• Raiden is not aware of any existing impediments nor of any
potential impediments which may impact ongoing exploration and
development activities at the project site.
Exploration done by
other parties
• Acknowledgment and appraisal of exploration by
other parties.
• A full search and compilation of historic exploration has been
completed.
• Work included stream sediment, soil and rock sampling, geological
mapping, geophysical surveys, drilling, resource estimation and
mining studies.
Geology
• Deposit type, geological setting and style of
mineralisation.
• Potential for lithium-caesium-tantalum bearing pegmatite
mineralisation.
• The project area is underlain by the Archean Pilbara Craton,
Page 12 of 15
ASX RELEASE | 22nd January 2024
Criteria
JORC Code explanation
Commentary
specifically the West Pilbara Superterrane (WPST) of Hickman
(2016). The 3280-3070 Ma WPST comprises numerous
tectonostratigraphic packages (Sholl, Regal and Karratha Terranes
and the Whundo and Nickol River Basins) and igneous complexes
that have been variously affected by several tectonic events. The
easterly to east-north easterly trending Sholl Shear Zone (SSZ) is
a boundary for the regional rock packages. Metamorphic grade is
higher to the north of the SSZ, suggesting the present-day surface
shows a slightly deeper crustal level on the north side.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
• Not applicable as in relation to this announcement no drilling by
Raiden has been conducted as yet.
Data aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
• Not applicable as in relation to this announcement no drilling by
Raiden has been conducted as yet.
Page 13 of 15
ASX RELEASE | 22nd January 2024
Criteria
JORC Code explanation
Commentary
cut-off grades are usually Material and should be
stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
known’).
Diagrams
• Maps are included in the body of the announcement.
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Balanced reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
Page 14 of 15
• Not applicable as in relation to this announcement no drilling by
Raiden has been conducted as yet.
• All reported results from other companies are as they have been
released to the ASX and are referenced at the end of this
announcement.
• This announcement discusses the findings of recent reconnaissance
sampling and associated assays.
ASX RELEASE | 22nd January 2024
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
• Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
• All the meaningful exploration data has been included in the body
Further work
• The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
• Raiden are currently planning further field reconnaissance and
Page 15 of 15
of this announcement.
infill soil sampling programs to assess the potential for lithiumbearing pegmatites over its Mt Sholl North Project.
Share your feedback
Discover