Arrow Gold Project Aircore Drilling Results
Released
Released
Announcement PDF
ASX RELEASE | 17 February 2025
ARROW GOLD PROJECT AIRCORE DRILLING
RESULTS
Highlights
•
•
The Aircore (“AC”) drilling program over the Arrow gold project
was completed in November 2024 for a total of 79 holes for
3,007m1
Objective of the program was to confirm geochemical anomalies
in bedrock and define gold bearing structures
•
A number of gold in soil trends correlate with elevated gold
anomalism from the aircore drilling program
•
Highest value recorded was 26.5ppb gold and 196.7ppm arsenic
in hole 24MALAC079
•
Follow-up work is being planned by JV partner
•
All activities for gold exploration on the project are financed by
the JV partner, Mallina Co Pty Ltd (“Mallina”), with Raiden
retaining a free caried position and retaining 100% of the LithiumCaesium-Tantalum (LCT) rights2
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
Raiden Resources Limited (ASX: RDN DAX: YM4) (“Raiden” or “the
Company”) is pleased to provide an update on the Aircore drilling
program on the Arrow Project.
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
SERBIA
Cu & Au
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“As per the Company’s strategy, we are pleased that the majority of the
portfolio is undergoing active exploration activities, and whereby a
number of projects, like the Arrow project is being financed through third
party joint ventures and partnerships. These initial aircore drill results
have provided encouragement that gold bearing structures transact the Arrow North project.
The aircore drill collars were drilled on a relatively wide spacing. Further work will be required
to narrow into potential drill targets. Mallina’s team is undertaking further analysis of drill
samples and will plan activities on the basis of these results.”
Page 1 of 18
ASX RELEASE | 17 February 2025
Figure 1: Arrow Gold Project location in relation to associated infrastructure and portfolio projects
Arrow Gold Project November 2024 Aircore Drilling Program
The Aircore drilling program, which was designed to evaluate Hemi-style orogenic gold
targets previously identified by Raiden on tenement E47/3476 was completed in November
20241. Drilling focused on targets associated with magnetic intrusive bodies, shear zones
and hydrothermal alteration3. Mallina’s program comprised of 79 drill holes (3,007m),
targeting six areas considered prospective for this style of mineralisation. These same areas
were previously based on soil sampling programs and magnetic data evaluations. Holes were
drilled on a series of traverses nominally 640m apart with holes spaced at 160m along
traverses. All holes were drilled to bedrock refusal and wherever possible included minimum
of one meter of fresh rock. Hole depths ranged from 3m to 107m with an average depth of
38m. Drill samples were composited over 4m with the last sample adjusted to include a final
1m sample to provide a discrete fresh bedrock sample to assist with litho-geochemical
analysis.
Page 2 of 18
ASX RELEASE | 17 February 2025
The drilling intersected varied lithologies dominated by greywacke, sandstone and siltstone,
together with lesser mafic, ultramafic, intermediate and felsic intrusives, particularly in the
southern part of the area covered by the drilling program, where pyrite was also noted in a
number of holes (24MALAC049-079). Shearing was also noted in holes 24MALAC049 and
050, coincident with a northwest trending structure interpreted from the aeromagnetics that
runs parallel to the Wohler Shear, a splay off the Mallina Shear, a major regional structure
that is considered to be critical to the emplacement of gold mineralised intrusives at Hemi4.
Assay results have now been received and assessed for all holes completed in the aircore
drilling program. These results have identified slightly elevated gold and arsenic values in
the southern part of the area drilled, centred around hole 24MALAC079 (26.5ppb Au and
196.7ppm As) and associated with felsic intrusives and ultramafic rocks. Low gold and arsenic
values were recorded in the central and northern parts of the tenement covered by the
drilling program (ref. Fig 2 below).
Based on the assay results from the drilling program, Mallina plan to undertake lithogeochemical and petrographic studies on samples collected from the drilling program with
the aim of determining next steps.
Page 3 of 18
ASX RELEASE | 17 February 2025
Figure 2: Arrow Gold Project aircore hole locations showing maximum down-hole Au (ppb) over
interpreted geology
Page 4 of 18
ASX RELEASE | 17 February 2025
About Arrow Gold Project
Geological mapping, soil sampling, detailed magnetic surveys and RC drilling executed over
the Arrow Project in the Pilbara region of Western Australia has defined a number of gold
exploration targets through the project area3. The project is centred 110 kilometres
southwest of Port Hedland and overlies part of the highly prospective Mallina Basin. Given
its location is only ~32 kilometres from De Grey Mining's (ASX: DEG) Hemi gold deposit4,
along the same structural trend, management believe that the area has substantial potential
to host significant orogenic gold mineralisation. Raiden's Arrow licences cover Mesoarchean
Mallina Basin rocks and later intrusions. Mallina Basin rocks exposed in the area are primarily
De Grey Group siliciclastic turbidites. Layered mafic-ultramafic sills, part of the regionally
extensive Millindinna intrusion, intruded the turbidites. Later granitic intrusions comprise
~2.95 Ga high Mg diorite (the Peawah Granodiorite of the Sisters Supersuite) and 2.94-2.93
Ga monzogranite (the Satirist Granite). The district scale Wohler Shear, which hosts gold
mineralisation along strike to the northeast, transects the project area.
Figure 3: Arrow Gold Project Location in relation to nearby gold prospects4
Page 5 of 18
ASX RELEASE | 17 February 2025
About Mallina Co Pty Ltd
Mallina Co Pty Ltd is a wholly owned subsidiary of Discover Co Pty Ltd, a private unlisted
company which invests in high potential copper and gold discovery opportunities in
Australia.
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
1
ASX:RDN 18 November 2024 Arrow Gold Project Drilling Update
2
ASX:RDN 09 May 2024 Raiden enters into option agreement over Arrow Gold Project
3
ASX:RDN 16 March 2022 Drilling results from Arrow Project and Company Update
4
ASX:DEG 21 November 2023 Hemi Gold Project Resource Update – November 2023
Competent Person's Statement and Compliance Statement
The information in this document related to Exploration Results, is based on information reviewed or
compiled by Mr Tim Kennedy, a Competent Person who is a Member of The Australasian Institute
Geoscientists. Mr Kennedy is the General Manager – Western Australia and a part-time contract employee of
Mallina Co Pty Ltd. Mr Kennedy has sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Kennedy consents to the inclusion in this announcement of the matters
based on this information in the form and context in which it appears.
The information referenced in announcements footnoted as 3 above that relates to Exploration Results has
previously been released to the ASX. The Company confirms that it is not aware of any information or data
that materially affects the information included in the market announcements, and that all material
assumptions and technical parameters underpinning the announcements continue to apply. The Company
Page 6 of 18
ASX RELEASE | 17 February 2025
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Table 1: Reported Drill Assay InterceptsA
Hole ID
GDA2020
Z50 E
GDA202
Z50 N
Dip
Azimuth
Total
Depth
(m)
Tenement
End of Hole
Lithology
24MALAC001
614748
7682874
60
330
10.00
E47/3476
Basalt
24MALAC002
614831
7682735
60
330
12.00
E47/3476
Dolerite
24MALAC003
614916
7682594
60
330
16.00
E47/3476
Basalt
24MALAC004
614984
7682458
60
330
5.00
E47/3476
Diorite
24MALAC005
615062
7682312
60
330
6.00
E47/3476
Diorite
24MALAC006
615113
7682215
60
330
5.00
E47/3476
Dolerite
24MALAC007
614802
7676984
60
330
51.00
E47/3476
Greywacke
24MALAC008
614881
7676850
60
330
78.00
E47/3476
Greywacke
24MALAC009
614958
7676714
60
330
79.00
E47/3476
Diorite
24MALAC010
615031
7676580
60
330
54.00
E47/3476
Greywacke
24MALAC011
614319.000
7676548
60
330
37.00
E47/3476
Sandstone
24MALAC012
614389
7676410
60
330
52.00
E47/3476
Greywacke
24MALAC013
614469
7676270
60
330
21.00
E47/3476
Sandstone
24MALAC014
615748
7676596
60
330
33.00
E47/3476
Gabbro
24MALAC015
615827
7676448
60
330
57.00
E47/3476
Greywacke
24MALAC016
615905
7676315
60
330
52.00
E47/3476
Greywacke
24MALAC017
615980
7676182
60
330
57.00
E47/3476
Siltstone
24MALAC018
616054
7676038
60
330
33.00
E47/3476
Sandstone
24MALAC019
616128
7675904
60
330
15.00
E47/3476
Greywacke
24MALAC020
615189
7676290
60
330
11.00
E47/3476
Sandstone
24MALAC021
615265
7676157
60
330
42.00
E47/3476
Sandstone
24MALAC022
615344
7676013
60
330
23.00
E47/3476
Sandstone
24MALAC023
615417
7675870
60
330
22.00
E47/3476
Sandstone
Page 7 of 18
Au ppb
Intercepts
No Significant
Intercept
No Significant
Intercept
4m@ 14.6 ppb Au
3m@14 ppb Au
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
ASX RELEASE | 17 February 2025
Hole ID
GDA2020
Z50 E
GDA202
Z50 N
Dip
Azimuth
Total
Depth
(m)
Tenement
End of Hole
Lithology
24MALAC024
615496
7675730
60
330
70.00
E47/3476
Sandstone
24MALAC025
615574
7675590
60
330
13.00
E47/3476
Gabbro
24MALAC026
614701
7675850
60
330
15.00
E47/3476
Gabbro
24MALAC027
614778
7675711
60
330
61.00
E47/3476
Greywacke
24MALAC028
614852
7675568
60
330
82.00
E47/3476
Greywacke
24MALAC029
614932
7675427
60
330
61.00
E47/3476
Greywacke
24MALAC030
614291
7675261
60
330
34.00
E47/3476
Greywacke
24MALAC031
614371
7675111
60
330
76.00
E47/3476
Greywacke
24MALAC032
614433
7675036
60
330
57.00
E47/3476
Sandstone
24MALAC033
613934
7674578
60
330
39.00
E47/3476
Greywacke
24MALAC034
614269
7673968
60
330
12.00
E47/3476
Greywacke
24MALAC035
614346
7673831
60
330
6.00
E47/3476
Greywacke
24MALAC036
613785
7673516
60
330
37.00
E47/3476
Shale
24MALAC037
613865
7673372
60
330
10.00
E47/3476
Sandstone
24MALAC038
613937
7673231
60
330
4.00
E47/3476
Greywacke
24MALAC039
613976
7673095
60
330
5.00
E47/3476
Greywacke
24MALAC040
613223
7673209
60
330
22.00
E47/3476
Sandstone
24MALAC041
613300
7673074
60
330
6.00
E47/3476
Greywacke
24MALAC042
613380
7672934
60
330
14.00
E47/3476
Greywacke
24MALAC043
613453
7672792
60
330
5.00
E47/3476
Greywacke
24MALAC044
613504
7672700
60
330
6.00
E47/3476
Greywacke
24MALAC045
613554
7672608
60
330
5.00
E47/3476
Greywacke
24MALAC046
613612
7672507
60
330
7.00
E47/3476
Greywacke
24MALAC047
613690
7672368
60
330
31.00
E47/3476
Sandstone
24MALAC048
613767
7672226
60
330
63.00
E47/3476
Sandstone
24MALAC049
613843
7672080
60
330
80.00
E47/3476
Siltstone
24MALAC050
613914
7671957
60
330
100.00
E47/3476
Quartz Vein
Page 8 of 18
Au ppb
Intercepts
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
4m @ 13.4 ppb Au
4m @ 11 ppb Au
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
4m @ 10.2 ppb Au
ASX RELEASE | 17 February 2025
Hole ID
GDA2020
Z50 E
GDA202
Z50 N
Dip
Azimuth
Total
Depth
(m)
Tenement
End of Hole
Lithology
Au ppb
Intercepts
24MALAC051
613359
7671642
60
330
42.00
E47/3476
Felsic Intrusive Undifferentiated
24MALAC052
613436
7671503
60
330
88.00
E47/3476
Sandstone
24MALAC053
613507
7671363
60
330
93.00
E47/3476
Felsic Intrusive Undifferentiated
24MALAC054
613582
7671224
60
330
57.00
E47/3476
Siltstone
24MALAC055
613660
7671082
60
330
42.00
E47/3476
Sandstone
24MALAC056
613712
7670995
60
330
26.00
E47/3476
Felsic Intrusive Undifferentiated
24MALAC057
612795
7671332
60
330
18.00
E47/3476
Basalt
24MALAC058
612867
7671199
60
330
29.00
E47/3476
Sandstone
24MALAC059
612947
7671055
60
330
46.00
E47/3476
Sandstone
24MALAC060
613026
7670916
60
330
60.00
E47/3476
Sandstone
24MALAC061
613100
7670779
60
330
26.00
E47/3476
Sandstone
24MALAC062
613176
7670640
60
330
38.00
E47/3476
Sandstone
24MALAC063
613969
7671864
60
330
76.00
E47/3476
Basalt
24MALAC064
612192
7674424
60
320
39.00
E47/3476
Felsic Intrusive Undifferentiated
24MALAC065
612304
7674307
60
320
6.00
E47/3476
Sandstone
24MALAC066
612412
7674190
60
320
12.00
E47/3476
Sandstone
24MALAC067
612518
7674071
60
320
7.00
E47/3476
Sandstone
24MALAC068
612614
7673949
60
320
4.00
E47/3476
Basalt
24MALAC069
612709
7673821
60
320
12.00
E47/3476
Siltstone
24MALAC070
612822
7673700
60
320
17.00
E47/3476
Sandstone
24MALAC071
612915
7673576
60
320
60.00
E47/3476
Felsic Intrusive Undifferentiated
24MALAC072
613030
7673461
60
320
55.00
E47/3476
Greywacke
24MALAC073
613966
7671863
60
320
27.00
E47/3476
Greywacke
24MALAC074
614917
7676792
60
330
61.00
E47/3476
Sandstone
24MALAC075
614993
7676646
60
330
69.00
E47/3476
Siltstone
No Significant
Intercept
No Significant
Intercept
4m @ 16 ppb Au
4m @ 13 ppb Au
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
No Significant
Intercept
24MALAC076
614839
7676910
60
330
87.00
E47/3476
Greywacke
4 m@ 11.2 ppb Au
24MALAC077
613394
7671578
60
330
85.00
E47/3476
Greywacke
No Significant
Intercept
Page 9 of 18
ASX RELEASE | 17 February 2025
Hole ID
GDA2020
Z50 E
GDA202
Z50 N
Dip
Azimuth
Total
Depth
(m)
Tenement
24MALAC078
613472
7671438
60
330
79.00
E47/3476
24MALAC079
613538
7671296
60
330
54.00
E47/3476
End of Hole
Lithology
Au ppb
Intercepts
Felsic Intrusive Undifferentiated
Ultramafic
Intrusive
Undifferentiated
No Significant
Intercept
4m @ 26.5 ppb Au
Table 2: Tenement Schedule
Tenement
E47/3476
E47/3478*
Holder
Pilbara Gold Corporation
Pty Ltd
Pilbara Gold Corporation
Pty Ltd
*Subject to Forfeiture
Page 10 of 18
Grant Date
Expiry
17/11/2016
16/11/2026
17/11/2016
16/11/2026
Area
29
blocks
42
blocks
RDN
%
100%
100%
ASX RELEASE | 17 February 2025
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South, Mt Sholl and Arrow lithium projects. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region
of Western Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 11 of 18
ASX RELEASE | 17 February 2025
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may
be required, such as where there is coarse
gold that has inherent sampling problems.
Unusual commodities or mineralisation
types (eg submarine nodules) may warrant
disclosure of detailed information.
• Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• 79 Air Core (AC) holes for 3007 m are
reported.
• The AC drill cuttings were collected from the
drill rig cyclone in 1 m intervals and
arranged in rows on site for sampling and
logging.
• Composite samples representing 4 m
intervals were collected by scoop sampling
from the 1 m sample piles for analysis.
• 1 m samples were collected by scoop
sampling from the 1 m sample piles for
storage and future 1m re-assaying.
• Samples were submitted to the Intertek
Group, Port Hedland for preparation and to
the Intertek Minerals Perth laboratories for
analysis.
Drilling
techniques
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
Page 12 of 18
• The 79 holes were drilled with a Bostech
Drilling Australia modified AC rig on Isuzu
700FTS 4x4 base. The air compressor of the
rig produces 250 psi @ 600cfm and is
operated by Bostech Drilling Australia. Hole
sizes were generally 85 mm - 87 mm. A
diamond bit was used to obtain end of hole
samples when the blade did not cut deep
enough into fresh rock (less than 10 holes).
A booster air compressor was not required.
• The bulk AC samples were visually assessed
and considered to be representative with
good recovery.
• Very few of the holes encountered water,
with limited impact on sample recovery.
Shroud tolerance was managed to optimise
ASX RELEASE | 17 February 2025
Criteria
JORC Code explanation
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Page 13 of 18
Commentary
recovery.
• Sample return was generally very good with
no significant variance in sample size
observed. Sample size is not considered to
have had a material impact on grade.
• All holes were qualitatively geologically
logged by suitably qualified geologists.
• The detail of geological logging is considered
sufficient for exploration drilling.
• All intersections were logged.
• Drill composites of 4 m length were
collected by scoop sampling from the
sample piles.
• Weights of samples submitted for assay
averaged 1.3 kg and ranged between 0.7 to
2.8 kg. Sample size is considered
appropriate for the material sampled.
• Commercial certified reference material of
known copper grades and of suitable matrix
were included in the laboratory assay
sequence at a rate of c. 1 per 50 samples.
• Duplicate samples were collected at a rate
of 1 per 50 samples.
• A coarse blank sample was inserted 1 in
every 100 samples.
• The Competent Person considers that the
sample size is appropriate to the grain size
of the material being sampled
• All samples were submitted to the Intertek
Group, Port Hedland, where they were oven
dried, crushed and then pulverised to P85 75 microns (method SP64).
• Assaying of samples was conducted at
Intertek Minerals, Perth using a Triple Quad
53 element aqua regia ICP-MS package
(code AR005/MSQ53).
• Intertek Minerals internal reference
materials and Discover Co (DISC) certified
reference materials were constantly
assessed for the presence of special-cause
variation and the Competent Person
considers the data to show the laboratory
was delivering consistent results.
ASX RELEASE | 17 February 2025
Criteria
JORC Code explanation
Commentary
Verification
of sampling
and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• No twinned holes were drilled.
• Primary data are stored and documented in
industry standard ways (MX Deposit)
considered appropriate by the Competent
Person.
• Assay data are as reported by Intertek
Minerals and the Competent Person has
verified these data and confirms that the
data have not been adjusted in any way.
• Remnant assay pulps are stored by Intertek
Minerals for 2 months or until authorised
for disposal.
• Drill hole locations were determined by
handheld GPS with a nominal accuracy of
+/- 5 metres.
• All coordinates and maps presented here
are in the GDA94 /MGA zone 50 system.
• The Competent Person considers that
topographic control is of sufficient quality.
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Sample
security
• The measures taken to ensure sample
security.
Page 14 of 18
• The reported drilling was conducted as a
reconnaissance program, with holes spaced
nominally 160 m apart along pre-cleared
lines constructed over heritage cleared
traverses over modelled target zones.
• Holes were not completed to a sufficient
standard to potentially be used in a future
resource estimation.
• 4m meter composite sampling was
undertaken from initial 1m sample piles.
Additionally, a final 1m sample was taken
from the EOH sample.
• The AC holes were drilled with a dip of 60°
towards the northwest (Azimuth ~320 330°) along heritage cleared tracks or
adjacent to heritage cleared pastoral tracks.
This orientation is approximately orthogonal
to the broad interpreted strike of
stratigraphy.
• Geological units within the target areas are
interpreted as generally sub-vertical to
steeply dipping towards the southeast.
Widths are reported as down-hole width
and there is insufficient information to make
an approximation of true width
• The chain of custody for all Mallina samples
from collection to dispatch to assay
laboratory was managed by Discover Co
personnel and their contractors.
• Sample numbers are unique and do not
ASX RELEASE | 17 February 2025
Criteria
Audits or
reviews
JORC Code explanation
• The results of any audits or reviews of
sampling techniques and data.
Commentary
include any locational or interval
information useful to non-Discover Co
personnel. The Competent Person considers
that the level of security is appropriate for
exploration drilling.
• Other than the work reported here, no
third-party audits or reviews of sampling
techniques and data have taken place.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location
and ownership includ
Share your feedback
Discover