Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX RELEASE | 30 January 2024
RAIDEN QUARTERLY ACTIVITIES REPORT
FOR PERIOD ENDED 31 DECEMBER 2023
Highlights of quarterly activities
•
ASX CODE: RDN
Andover South Project
•
•
DAX CODE: YM4
Significant results from Andover South (selected results >2% Li2O from
recent sampling) include1:
o 3.80% Li2O - sample R21843
o 3.64% Li2O - sample R21952
o 2.97% Li2O - sample R21923
o 2.87% Li2O - sample R21989
o 2.79% Li2O - sample R21949
o 2.77% Li2O - sample R21922
o 2.71% Li2O - sample R21918
X-Ray Diffraction analysis (“XRD”) analysis confirms spodumene as
dominant lithium mineral1
•
Independent technical analysis by CSA Global confirms five new
potential target zones at Andover South Project2
•
Native Title and Heritage Deed executed with the Ngarluma Aboriginal
Corporation across Raiden’s recently acquired Andover tenements4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Warrick Clent
• Mt Sholl Project
•
Raiden secured 100% of LCT & Ni-Cu-PGE Mineral Rights at Mt Sholl5
•
Raiden has entered into a memorandum of understanding (“MOU”) with
First Quantum Minerals Australia Ltd (“FQMA”) in relation to the Mt Sholl
Ni-Cu-PGE project6
•
Soil sampling program defined several clear lithium in soil trends at Mt
Sholl Lithium Project during the quarter7, along strike of GreenTech
Metals Ltd.’s (ASX: GRE) Osbourne JV pegmatite discovery8
• Arrow Project
•
Raiden secured 100% of LCT Mineral Rights at Arrow9
•
Reconnaissance work defined outcropping pegmatites and visually
confirmed spodumene* mineralisation on the Arrow project10
ASSET PORTFOLIO
SERBIA
Cu & Au (~150km2)
BULGARIA
Cu, Au & Ag (~409km2)
AUSTRALIA
Li, Au, Cu, Ni & PGE
(~840km2)
*In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of spodumene material
abundance should never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to
determine the type and grade of the visible mineralisation reported in geological field mapping described in this
announcement.
Page 1 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
provide its report on activities and progress made during the December 2023 Quarter:
Exploration Activities in Western Australia
Andover Project
Detailed structural mapping and outcrop sampling program was undertaken throughout
the reporting period on E47/4062, as the Company continued to gather data required for
effective planning of the upcoming drill program.
A total of 143 rock chip samples were collected from outcrops on the Andover South
Project during the sampling program, of which a total of 34 samples, or 24% of the total
samples, assayed >1% Li2O. These results continue to encourage the Company on the highgrade nature of outcropping pegmatites at Andover South, with multiple, high-grade
pegmatites assaying with significant Li2O values.
Figure 1: Raiden’s Andover South Project and adjacent Azure Minerals Ltd.’s Andover Lithium
project2
Page 2 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Figure 2: Significant rock chip Li2O results within E47/4062 (Andover South Project)1
Page 3 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Figure 3: Rock sample R21843 collected from intensely silicified pegmatite outcrop 1
During November the Company engaged CSA Global to assist in a re-evaluation exercise
of the Andover South pegmatite project in the Pilbara. The field program included remapping of the defined pegmatites and analysis of the outcrop.
The following are the key observations on the basis of the analysis;
• Majority of observed pegmatites are classified as “complex zoned” pegmatites. In
such pegmatites, mineralised zones are typically distributed around the quartz
core(s) and can be variable in nature along the strike and dip of the individual
pegmatite.
• In reference to a global dataset of K-feldspar K/Rb fractionation data (provided by
CSA Global), which indicates that pegmatites globally, with a K/Rb value of <30, have
the highest potential to host lithium mineralisation, it was determined that:
• The K-feldspar fractionation data from the Andover South pegmatites
specifically indicate that the high-grade lithium mineralisation is associated
with K/Rb values of <10. Multiple pegmatites / zones of pegmatites are
fractionated (K/Rb 10-20), but are not associated with positive samples.
Page 4 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Figure 4: Andover South Project – K-Feldspar K/Rb ratios showing fractionation trends 2
(where <10 corresponds with current highest Li2O grade pegmatites and <30 shows very highly
fractionated pegmatites, being most likely to host further LCT mineralisation)
The most fractionated pegmatites in the Project area have K/Rb values of <10 and have
coincident anomalous Cs and Ta. These very highly fractionated pegmatites correspond to
rock chip samples with significantly elevated Li2O (up to 3.80% Li2O2) and observed
spodumene mineralisation2.
Page 5 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Figure 5: Andover South Project – zones of interest based on fractionation analysis of pegmatites
Summary of target zones:
•
•
•
•
Target zone 1 – has been defined across an approximate 1.5km strike extent within
tenement E47/4062, with defined pegmatites which correlate to high-grade Li2O
mineralisation. The K/Rb ratio data also indicates that the pegmatites in this zone are
highly fractionated.
Target zone 2 – is defined on the northern extent, and subparallel, to Target area 1.
Multiple pegmatites have been mapped, but the initial sampling results did not indicate
economic mineralisation. The K/Rb data analysis of these pegmatites indicates that the
pegmatites are highly fractionated.
Target zone 3 – is located on the eastern strike extent of Target zone 1, within tenement
E47/4061 and is characterised by outcropping pegmatites, low lithium mineralisation
rock samples, but indicated as highly fractionated by the K/Rb ratio analysis.
Target zone 4 – is located adjacent to Target zone 3 on E47/4061 and is characterised
by outcropping pegmatites, low lithium mineralisation from samples collected to date,
Page 6 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
•
•
however it is defined a potentially permissive for LCT mineralisation, as per the K/Rb ratio
analysis.
Target zone 5 – is located on the southern extent of E47/4062 and characterised as
potentially permissive for LCT mineralisation, as per the K/Rb ratio analysis.
Target zone 6 – is located on the western extent of E47/4062, and is also characterised
by outcropping pegmatites, which are potentially permissive for LCT mineralisation, as
per the K/Rb ratio analysis.
The Company also undertook further semi-quantitative XRD analysis on whole rock chip
samples collected during late August 2023.
Samples selected for analysis had previously returned 2.14% (sample # R21533) and 2.11%
(sample #R21826) Li2O values with results outlined in Tables 1 & 2 below.
The XRD analysis further confirmed previously reported results3, that spodumene is likely
the dominant lithium bearing mineral, with a highest result of 29% Spodumene returned
in sample R21160 from the Andover South project (Table 3 below).
It should be noted that these XRD analysis results were undertaken on outcropping rock
samples and not from drill core and therefore may not be representative of the entire
mineralised system. On completion of the drilling program, management will submit larger,
representative samples for further analysis.
Table 1: XRD analysis results from rock sample R21533 1
(from the Duratec Australia report “Semi-Quantitative XRD Analysis of Lithium Pegmatite Samples” for Raiden
Resources Ltd)
Page 7 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Table 2: XRD analysis results from rock sample R21826 1
(from the Duratec Australia report “Semi-Quantitative XRD Analysis of Lithium Pegmatite Samples” for Raiden
Resources Ltd)
Mineral or mineral group
Li2O geochemistry analysis result
(previously reported)
Spodumene
Annite - biotite - phlogopite
Muscovite
Plagioclase
K-feldspar and/ or rutile
Quartz
Sample 1
R21160
Sample 2
R21163
Mass %
Sample 3
R21168
2.22
0.98
0.37
29
1
4
14
4
48
3
1
1
75
4
15
4
0
1
71
5
19
Table 3: Summary of XRD Results – presented as percentages3
Further observations from the analysis shown above in Table 3 indicate that the samples
contain low content of micas, which supports the theory that the Li2O mineralisation is
predominantly derived from Spodumene mineralisation and unlikely to be associated
with lithium bearing Micas, which were not defined by the XRD analysis from the samples
submitted to date.
Page 8 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Figure 6: Photographs of the sample R21160 processed for XRD analysis3
The Company was also very pleased to announce in October that it had executed a Deed
of Variation adding the five recently acquired Andover Lithium Project tenements to
the existing Native Title and Heritage Exploration Agreement (NTA) with the Ngarluma
Aboriginal Corporation (“NAC”).
Mt Sholl Project
The Company executed a soil sampling program over the northern tenement during
October. The samples were analysed for the full suite of LCT elements, as well as other
elements.
On the basis of the results to date, several distinct geochemical trends have been defined.
A +30ppm lithium soil trend in the central western part of the permit area extends along a
3.5km east-west trending corridor, with peak values of 138.5ppm lithium. The strike of the
trend aligns with GreenTech Metals Ltd8 (ASX: GRE) released lithium-in-soil anomalies,
positive rock sampling, and their recently announced intersection of pegmatites in drilling
(Figure 5). The highest values are in the western part of the project area.
A >50ppm lithium soil anomaly in the southern part of the license extends over a 2.5km
strike extent, with a peak value of 187.5ppm lithium. This trend does not seem to be
associated with any of the known anomalies/trends in the district and is a new target area
which the Company will evaluate through the upcoming programs.
Page 9 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Further work is being planned for follow-up programs in the early-2024.
Figure 7: Mt Sholl Project with the results of Raiden’s lithium soil sampling program, in relation to
GreenTech Metals Ltd’s (ASX: GRE) Osbourne JV results7
Arrow Project
The ongoing field reconnaissance, mapping and sampling program focussed on areas of
interest identified from satellite analysis by external consultants Terra Resources Ltd. The
teams also evaluated priority areas directly to the north of Morella Corporation Ltd’s (ASX:
1MC) pegmatite discovery11.
As a result, the teams visually identified spodumene crystals within several rock samples
collected from outcropping pegmatites located in the western area of Arrow North Project
(E47/3476), which is situated directly to the north of Morella Corp’s pegmatite discovery11.
Page 10 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Figure 8: Area of mapped pegmatites (dashed zone above) where visual spodumene crystals have
been identified in relation to adjoining projects and discoveries10
Further indication of potential spodumene mineralisation was provided by the fluorescence
test of samples under Ultraviolet (“UV”) light. Spodumene mineralisation may fluoresce
(usually pink), under UV light and is a commonly used field technique to evaluate for the
presence of spodumene mineralisation. The images in Figure 9 show several of the rock
samples, both under a UV light and natural light conditions for comparison indicating
potential spodumene mineralisation.
Page 11 of 22
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 30 January 2024
Figure 9: Selected rock chip samples collected from E47/3476 during the current program under UV
and natural light, indicating potential spodumene mineralisation* (NB: all graduations on the scales
above are 1cm)10
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of spodumene material
abundance should never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to
determine the type and grade of the visible mineralisation reported in geological field mapping described in this
announcement. The Company will update the market when laboratory analytical results become available.
*
Page 12 of 22
ASX RELEASE | 30 January 2024
Sample
ID
R22037
R22046
R22049
R22064
Easting
607613
607831
608086
608580
Northing
Mineral %
(Visual Estimate)
Host Lithology
7674672
Quartz (15%), Plagioclase (30%), Spodumene (5%) set
on a light greyish white coloured groundmass (45%) with
Mn stains (1%), FeO stains (3%) and dark coloured
mineral specks (1%)
Fine to very
coarsegrained
Pegmatite
within
Granodiorite
Quartz (20%), Plagioclase (20%), Spodumene (8%) set
on a light greyish white coloured groundmass (50%) with
Mn stains (1%) and FeO stains (1%)
Fine to very
coarsegrained
Pegmatite
within
Granodiorite
7674878
Quartz (5%), Plagioclase (10%), Spodumene (2%) set on
a white coloured slightly silicified groundmass (80%) with
Mn stains (1%), FeO stains (1%), Muscovite specks
(0.5%) and unknown green mineral (0.5%)
Fine to very
coarsegrained
Pegmatite
(slightly
silicified)
within
Granodiorite
7674883
Quartz (20%), Plagioclase (25%), Spodumene (10%), set
on a white coloured groundmass (40%) with Mn stains
(0.5%), FeO stains (0.5%) and greyish maroon mineral
(Spodumene/Feldspar? 4%)
Fine to very
coarsegrained
Pegmatite
within
Granodiorite
7674868
Table 4: Summary of Visual Mineralisation from selected rock chip samples #10
All coordinates are GDA94_Z50E
#Note: Descriptions of the amounts of spodumene seen in logged selected rock chips (above), are qualitative,
visual estimates (they are listed in order of abundance of estimated percentages of the listed minerals).
Quantitative assays will be completed by an ALS laboratory in Perth.
Other Australian Projects
Management continued to engage with potential partners regarding the divestment and
partnerships regarding non-core assets in Australia.
Page 13 of 22
ASX RELEASE | 30 January 2024
Other Acquisitions (Mt Sholl Project)
During the quarter the Company announced that it has secured a 100% interest of NiCu-PGE and LCT mineral rights over the Mt Sholl project when it acquired the remaining
20% interest held by Welcome Exploration Ltd. (“Welcome”) in the project5.
Under the terms of the agreement, Raiden acquired the remaining 20% of tenement
holding from Welcome and after the transaction completes, will have 100% of the mineral
rights in the 12 tenements subject to the agreement. For further details regarding the
transaction, refer to the Company’s announcement on the 12th of December 2023.
Additionally, the Company announced that it entered into an MOU over the Mt Sholl
Ni-Cu-PGE project rights with First Quantum Minerals Australia Ltd6 (“FQMA").
Under the terms of the non-binding Memorandum of Understanding (“MOU”), FQMA has
the option to earn into a 70% position in the Mt Sholl Ni-Cu-PGE project through staged
project investments, by achieving defined technical milestones, as well as making milestone
payments to Raiden. The parties will aim to execute a binding letter agreement in the
following months, which will be consistent with the terms of the MOU. For further details
regarding the transaction, refer to the Company’s announcement on the 13th of December
2023.
Page 14 of 22
ASX RELEASE | 30 January 2024
Figure 10: Mt Sholl Project and Ni-Cu-PGE resources and prospects in the district6
Page 15 of 22
ASX RELEASE | 30 January 2024
Exploration Activities in Bulgaria
Vuzel (Au/Ag)
During the reporting period no field activities were undertaken on the project. The
Company, through its 51% owned Bulgarian subsidiary, Vuzel Minerals Ltd, successfully
extended the project for a further 2-year exploration term. Management are planning for
a drill campaign on the project, to be undertaken in 2024, to follow up on the high grade
targets defined on the project to date.
Kalabak (Cu/Au)
Further target generation work was undertaken on the project by Velocity Minerals under
the option agreement, as announced by the Company on the 9th of August 2023 12 . Due
to lack of defined targets, Velocity Minerals have informed the Company that it will
terminate the Option Agreement over the project in 2024, which was received by the
Company subsequent to the reporting period. The Company does not intend to continue
with further exploration activities on the Kalabak project and will undertake the required
steps to relinquish the project to the Ministry of Energy in Bulgaria.
Zlatusha (Cu/Au)
Throughout the reporting period, target generation work has been undertaken on the
project by Velocity Minerals, as per the option/earn-in agreement, as announced by the
Company on the 24th of January 202313. Velocity Minerals are planning to execute the
maiden drill campaign on the project in 2024.
BG1 project (Cu/Au)
No activities were undertaken on the project during the reporting period.
Exploration Activities in Serbia
Donje Nevlje (Cu/Au)
No activities were undertaken on the project during the reporting period.
Page 16 of 22
ASX RELEASE | 30 January 2024
Corporate
During the reporting period the Company raised $2,479,248 on conversion of 165,283,180
options with exercise price of $0.015 expiry date of 30 November 2024 and $408,508 on
conversion of 10,212,690 options with exercise price of $0.04 and expiry date of 31
December 2023. The Company also raised $914,687 under the ATM Agreement with 8
Equity Pty Ltd.
Summary of Expenditure
Of the total expenditure of the Company during the Quarter, A$1,242,000 of the Company’s
expenditure was on activities related to the exploration of the current projects as detailed
in the Cashflow Report (5B) appended to this report. The Company did not incur any
expenditure related to mining, production and development activities during the Quarter.
In accordance with ASX Listing Rule 5.3.5 payments totalling approximately A$119k were
made to related parties of the Company, being Non-Executive, Managing Director fees and
accounting and company secretarial fees (section 6.1 of the accompanying 5B).
Page 17 of 22
ASX RELEASE | 30 January 2024
Tenement Table: ASX Listing Rule 5.3.3
Mining tenement interests held at the end of the quarter and their location:
Tenement reference
Location
Nature
Status
Interest
Donje Nevlje 310-02-1547/2015-02
Serbia
Direct
Granted
100%
Zapadni Majdanpek 310-021096/2016-02
Serbia
Direct
Granted
100%
Kalabak (Bulgaria) – Licence No. 405
Bulgaria
Direct
Granted
100%
Zlatusha (Bulgaria) – Licence No. 486
Bulgaria
Direct
Granted
100%
BG1 (Bulgaria) – Permit No. 527
Bulgaria
Direct
Pending
100%
Mt Sholl (E47/4309)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3468)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/2024)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3181)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3339)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1762)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1787)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1788)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1789)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1790)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1791)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1792)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1793)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1794)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1795)
Western Australia
Direct
Granted
100%
Yandicoogina (M45/115)
Western Australia
Direct
Granted
100%
Yandicoogina (M45/987)
Western Australia
Direct
Granted
100%
Arrow (E47/3476)
Western Australia
Direct
Granted
100%
Arrow (E47/3478)
Western Australia
Direct
Granted
100%
Pyramid (E47/4300)
Western Australia
Direct
Granted
100%
Welcome (E47/3849)
Western Australia
Direct
Granted
100%
Welcome (E47/4061)
Western Australia
Direct
Granted
80%
Welcome (E47/4062)
Western Australia
Direct
80%
Welcome (E47/4063)
Western Australia
Direct
Application pending
Granted
Welcome (P47/2028)
Western Australia
Direct
Application pending
80%
Page 18 of 22
80%
ASX RELEASE | 30 January 2024
Mining tenement interests relinquished during the quarter and their location:
Tenement reference and location
Location
Nature
Status
Interest
Yandicoogina (E45/3571)
Western Australia
Direct
Granted
100%
Yandicoogina (E45/3474)
Western Australia
Direct
100%
Tabba Tabba (E45/6182)
Western Australia
Direct
Granted
Application pending
100%
Mining tenement interests acquired during the quarter and their location:
Tenement reference
Location
Nature
Status
Interest
Mt Sholl (E47/3181)
Western Australia
Direct
Granted
20%
Mt Sholl (E47/3339)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1762)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1787)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1788)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1789)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1790)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1791)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1792)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1793)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1794)
Western Australia
Direct
Granted
20%
Mt Sholl (P47/1795)
Western Australia
Direct
Granted
20%
a The Company acquired the remaining 20% interest in the Mt Sholl tenements from Welcome Exploration Pty Ltd on
the 12th December 2023 bringing Raiden’s beneficial interest in the tenements to 100%.
Mining tenement interests under application during the quarter and their location:
Tenement reference
Majdanpek Pojas - 310-02-1999
/2020-02
Tabba Tabba (E45/6701)
Location
Nature
Status
Interest
Serbia
Direct
Application - pending
100%
Western Australia
Direct
Application - pending
100%
Pyramid (E47/4307)
Western Australia
Direct
Application - pending
100%
Andover (E47/4603)
Western Australia
Direct
Application - pending
100%
Andover (E47/5038)
Western Australia
Direct
Application - pending
100%
Beneficial percentage interests held in farm-in or farm-out agreements at the end
of the quarter:
Tenement reference
Vuzela (Bulgaria) – Licence No. 522
Location
Nature
Status
Interest
Bulgaria
Joint Venture
Granted
51%
a The Company has an agreement to earn-in up to 90% position within the project. At the end of the quarter the
Company held 51% interest in Vuzel Minerals EOOD, which holds the Vuzel licence.
Page 19 of 22
ASX RELEASE | 30 January 2024
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly, or in the commentary of, this quarterly activities release
ASX:RDN 09 November 2023 Exceptional lithium results & additional spodumene XRD confirmation at
Andover South Project
1
ASX:RDN 22 December 2023 Independent technical analysis by CSA Global confirms five new potential
target zones at Andover South Project
2
ASX:RDN 17 October 2023 XRD confirms high Spodumene content at Andover South Project
3
ASX:RDN 27 October 2023 Heritage Access Deed Executed & Survey Request for Drilling over Andover
Tenements
4
ASX:RDN 12 December 2023 Raiden Secures 100% of LCT & Ni-Cu-PGE Mineral Rights across Mt Sholl
Project
5
ASX:RDN 13 December 2023 Raiden enters into Memorandum of Understanding over Mt Sholl Ni-Cu-PGE
Project
6
ASX:RDN 5 December 2023 Multiple lithium soil anomalies defined at Mt Sholl Project
7
ASX:GRE 29 November 2023 Maiden diamond Hole completed Osborne Joint Venture
8
ASX:RDN 06 November 2023 Raiden acquires 100% of lithium rights at Arrow Project
9
ASX:RDN 30 October 2023 Pegmatites and Visual Spodumene Mineralisation mapped at Arrow Lithium
Project
10
ASX:1MC 09 September 2023 Drilling Commenced at Mallina Lithium Project
11
ASX:RDN 09 August 3023 Raiden options the Kalabak project in Bulgaria to Velocity Minerals
12
ASX:RDN 24 January 2023 Sale of up to 75% in Zlatusha Project through minimum earn-in requirements
& c$1m Cash/Script
13
Page 20 of 22
ASX RELEASE | 30 January 2024
Competent Person's and Compliance Statement
The information in the referenced announcement 1-7, 9-10 and 12-13 footnoted above that relate to
Exploration Results have previously been released to the ASX. The Company confirms that it is not aware of
any information or data that materially affects the information included in the market announcements, and
that all material assumptions and technical parameters underpinning the announcements continue to apply.
The Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original market announcements.
Mineral Resources
The Company confirms it is not aware of any new information or data that materially affects the information
included in the announcement released on 3 April 2023 and all material assumptions and technical
parameters underpinning the estimate continue to apply and have not materially changed when referring
to its resource announcement. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
Mineral Resources Estimate
The Mineral Resource statement as reported on the 3 April 2023 is as follows:
Mt Sholl Mineral Resource Estimate by classification reported above a 0.35% Ni_Eq cut-off for open pit
resources and at 0.5% Ni_Eq for underground resources
Tonnes
Mt
Ni
%
Cu
%
Co
ppm
3E1
g/t
Ni Metal
kt
Cu Metal
kt
3E
(Pd, Pt, Au)
oz
Indicated
10.5
0.39
0.45
134
0.32
41.0
47.3
108,031
Inferred
9.8
0.29
0.32
78
0.32
28.4
31.3
100,715
Total
20.3
0.34
0.39
107
0.32
69.34
78.6
208,745
3.1
0.48
0.47
57
0.25
14.9
14.6
24,898
Classification
Open Pit
Underground
Inferred
Notes:
•
•
•
•
•
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code –JORC 2012 Edition).
Data is reported to significant figures and differences may occur due to rounding.
Mineral Resources have been reported above a cut-off grade of 0.35 % Nickel equivalent for open pit resources and above
0.5% Nickel equivalent for underground resources.
Bulk densities in the Basal unit are 3.06 and in Zone2 are 2.91. These figures represent averages of the values collected in
the respective domains from the 2022 drill program.
The Ni_Eq calculation represents total metal value for each metal summed and expressed in equivalent nickel grade and
tonnes. Commodity prices assumed in the calculation are noted below as is the formula used to calculate Ni_Eq.
Page 21 of 22
ASX RELEASE | 30 January 2024
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or const
Share your feedback
Discover