Tabba Tabba Project Lithium Prospectivity review
Released
Released
Announcement PDF
ASX RELEASE | 2 October 2023
TABBA TABBA PROJECT LITHIUM
PROSPECTIVITY REVIEW
ASX CODE: RDN
Highlights
•
•
DAX CODE: YM4
Company undertook a review and compilation of historical
exploration and geophysical data, which defined potential for Libearing pegmatite host geology at the Tabba Tabba Project
(~80km2)
Relict mafic rocks indicated immediately adjacent to Split Rock
Supersuite granite, which is interpreted to be the source of
lithium-bearing pegmatite mineralisation in the district
•
Tabba Tabba is within a comparable geologic setting to the recent
Wildcat Resources Ltd (ASX:WC8) lithium discovery (85m @ 1.1%
Li2O from surface TARC086)1 30km south
•
Shallow transported material at Tabba Tabba Project obscures
underlying geology – Ultrafine soil sampling is planned to define
potential targets
•
Raiden planning to commence field reconnaissance work to
evaluate potential host geology within its Tabba Tabba project
area, in parallel with remainder of Lithium portfolio undertakings
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Warrick Clent
ASSET PORTFOLIO
SERBIA
Cu & Au (~150km2)
BULGARIA
Cu, Au & Ag (~409km2)
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the
Company”) is pleased to announce that it has completed its review of
historical exploration and geophysical data over its Tabba Tabba
Lithium Project (E45/6182), located in the Pilbara region of Western
Australia.
AUSTRALIA
Au, Cu, Ni & PGE
(~840km2)
Mr Dusko Ljubojevic, Managing Director of Raiden commented: ”The work on the Tabba
Tabba project is part of the portfolio wide undertaking to determine prospectivity and potential
for Lithium-Caesium-Tantalum (LCT) mineralisation. Our initial interpretations have
concluded that further evaluation of the Tabba Tabba project is warranted and management
Page 1 of 12
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 2 October 2023
are planning initial programs across this project. Evaluations of the remainder of the portfolio
are under way and we are hopeful that we will define further potential target areas and LCT
mineralisation across the portfolio. At the same time, the primary focus for the Company is on
advancing the Andover South project towards drill testing the defined pegmatite targets as
soon as possible.”
On the basis of interpretation of historical and more recent available datasets, management
postulate that the Tabba Tabba project may host permissive geological units, which are
prospective for Lithium-Caesium-Tantalum (“LCT”) pegmatite mineralisation.
A recent interpretation of the available geophysical data by Value Adding Resources (VAR),
concluded that the rocks underlying Raiden’s tenure and which are obscured by shallow
transported cover, exhibit a magnetic signature consistent with relic metamorphosed mafic
rock units. The interpreted strike length of the potential mafic unit is ~4km in strike length.
The interpreted mafic unit is also in close proximity to the Split Rock Supersuite granitic
rocks, interpreted to be the likely source of fractionated fluids which generate pegmatite
hosted LCT mineralisation (see Figures 1 & 2).
As recently announced by Wildcat Resources Ltd (ASX:WC8), drilling results at their Tabba
Tabba Lithium Project1, the Split Rock Supersuite granites are a suitable source of
fractionated fluids with potential for high-grade lithium-bearing pegmatites when hosted by
appropriate metamorphosed greenstone rocks.
Further encouragement is provided by the fact that the approximate 4km strike length of
interpreted mafic rocks is located within the LCT mineralisation ‘goldilocks zone’ of the Split
Rocks Supersuite granites (~3-5km distance from the granite intrusive), which is considered
to be the ideal setting for the formation of LCT pegmatites.
Management have commenced planning for the initial field reconnaissance exploration work
over this project and the results will be released to the market as they become available.
Page 2 of 12
ASX RELEASE | 2 October 2023
Figure 1: Tabba Tabba Project Location – in relation to prospective fractionated source rocks
Page 3 of 12
ASX RELEASE | 2 October 2023
Figure 2: Tabba Tabba Project Location showing interpreted mafic rocks in relation to granitic
intrusive units (1st vertical derivative gravity and RTP HGM TMI aeromagnetic data – see JORC
Table 1 for more information)
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
ASX:WC8 18 September 2023 Major Lithium Discovery at Tabba Tabba
1
Page 4 of 12
ASX RELEASE | 2 October 2023
Competent Person's Statement
The information in this announcement that relates to exploration results is based on and fairly represents
information and supporting documentation, and has been reviewed and approved by Mr Warrick Clent, a
competent person who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Warrick
Clent is employed by Raiden Resources Limited. Mr Warrick Clent has sufficient experience that is relevant to the
style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 edition of the JORC Code. Mr Warrick Clent has provided his prior
written consent as to the form and context in which the exploration results and the supporting information are
presented in this announcement.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited . (ASX:RDN / DAX:YM4) is a dual listed base metal—gold exploration Company
focused on the Mt Sholl nickel-copper-cobalt- PGE project in the Pilbara region of Western Australia project.
In addition, the company holds other highly prospective gold projects within the Pilbara region, as well as the
emerging and prolific Western Tethyan metallogenic belt in Eastern Europe, where it has established a
significant exploration footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 5 of 12
ASX RELEASE | 2 October 2023
Table 1: JORC Code, 2012 Edition. Section 1.
Criteria
JORC Code explanation
Sampling
techniques
Drilling
techniques
Drill sample
recovery
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of mineralisation that are Material to
the Public Report.
• In cases where ‘industry standard’ work has been done this would
be relatively simple (eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more explanation may
be required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (eg core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit
or other type, whether core is oriented and if so, by what method,
etc).
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Page 6 of 12
Commentary
• In relation to this announcement no sampling has been
conducted as yet and no assays are being reported
• In relation to this announcement no drilling has been
conducted as yet and no assays are being reported
• In relation to this announcement no sampling has been
conducted as yet and no assays are being reported
ASX RELEASE | 2 October 2023
Criteria
Logging
Sub-sampling
techniques
and sample
preparation
JORC Code explanation
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
• In relation to this announcement no drilling has been
geotechnically logged to a level of detail to support appropriate
conducted as yet.
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• If core, whether cut or sawn and whether quarter, half or all core • Not applicable
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
Quality of
• The nature, quality and appropriateness of the assaying and
assay data and
laboratory procedures used and whether the technique is
laboratory
considered partial or total.
tests
• For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
Page 7 of 12
Commentary
•
Not applicable
ASX RELEASE | 2 October 2023
Criteria
JORC Code explanation
Commentary
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have
been established.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Not applicable
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Co-ordinates are provided in the Geocentric Datum of
Australia (GDA94) Zone 50.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Not applicable
Orientation of
data in
relation to
• Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
• If the relationship between the drilling orientation and the
• Not applicable
Page 8 of 12
ASX RELEASE | 2 October 2023
Criteria
JORC Code explanation
Commentary
geological
structure
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
• The measures taken to ensure sample security.
• Not applicable.
Sample
security
Audits or
reviews
• The results of any audits or reviews of sampling techniques and
data.
• Not applicable
Table 2: JORC Code, 2012 Edition. Section 2. (Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties.
Geology
• Deposit type, geological setting and style of mineralisation.
Page 9 of 12
• Raiden Resources Ltd tenement is located in the Town of
Port Hedland, within the Pilbara region of Western
Australia.
• The tenement is held by Raiden Resources Ltd 100%
• Tenement E45/6182 is in the application stage
• Tenements are located on the Strelley and De Grey
pastoral leases.
• Raiden is not aware of any existing impediments nor of
any potential impediments which may impact ongoing
exploration and development activities at the project sites.
• A search and compilation of historic exploration has been
completed.
• Work included geophysical surveys.
• Potential for lithium-caesium-tantalum bearing pegmatite
mineralisation.
• As interpreted by Value Adding Resources, RDN’s
consultant geophysicist, the Tabba Tabba Project area is
ASX RELEASE | 2 October 2023
Criteria
Drill hole
Information
Data
aggregation
methods
Page 10 of 12
JORC Code explanation
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Commentary
underlain by relic metamorphosed mafic units in
proximity to leucogranitic bodies.
• It is further interpretated that a potential source of
mineralising fluids for the lithium pegmatites come from
nearby felsic intrusive bodies, these being the Myanna
Leucogranite for the Tabba Tabba Project area.
• Not applicable
• Not applicable
ASX RELEASE | 2 October 2023
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• Not applicable
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Page 11 of 12
• Maps are included in the body of the announcement.
• All historic results are reported as they have been released
to the ASX by the previous companies.
• In relation to this announcement no sampling has been
conducted as yet and no assays are being reported
• The underlying aeromagnetic data that forms the basis for
reinterpretation of the Tabba Tabba Project rocks, as
described in the body of the announcement, was sourced
from open file GSWA data available through the MAGIX
system at:
• https://geodownloads.dmp.wa.gov.au/downloads/geophys
ics/72204/WA_Magnetics_20m/, including the displayed
RTP HGM TMI (reduced-to-pole, horizontal gradient
magnitude, total magnetic intensity) image shown in
Figure 2 in the body of the announcement.
• National Unfiltered Radiometric Grids v4 2019
• National Complete Bouger Anomaly Grid – B Series,
2019
• DTM – SRTM1
ASX RELEASE | 2 October 2023
Criteria
JORC Code explanation
Commentary
Further work
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
• Raiden are currently planning a field reconnaissance
program to further assess the potential for lithium-bearing
pegmatites over its Tabba Tabba Project.
Page 12 of 12
Share your feedback
Discover