Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX RELEASE | 24 October 2024
RAIDEN QUARTERLY ACTIVITIES REPORT
FOR PERIOD ENDED 30 SEPTEMBER 2024
Highlights
ASX CODE: RDN
Andover South Project
•
State Deed for the Andover South Lithium Project (E47/4062)
executed by the Ngarluma Aboriginal Corporation (“NAC”) and
the tenement vendor1
1
•
E47/4061 renewed for a further five-year term
•
Regulatory conditions for drilling approved and initial 5,000m
diamond drilling program commenced during the quarter2
•
New, high-priority target area defined on Andover South
Project3
•
Structural interpretation of the Andover North & South projects
completed4
•
New technical team, with Andover Complex lithium experience
appointed to lead Andover South drilling program5
Mt Sholl Ni-Cu-PGE Project
•
Completion of an archaeological/anthropological heritage
survey over the key target areas designed for drilling in Q46
•
Ongoing planning for commencement of the drill campaign on
the project by JV partner First Quantum Minerals7
Arrow Gold Project
•
Completion of archaeological/anthropological heritage survey
over new target areas8
•
Ongoing planning for the drill program by JV partner Mallina
Co9
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
Post Quarter Highlights
•
Placement completed raising $10 million (before fees)10, from sophisticated,
professional and institutional investors (~$14.1M cash on hand)
Page 1 of 12
ASX RELEASE | 24 October 2024
•
Drill program expanded up to 15,000m on Andover South lithium project
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
provide its report on activities and progress made during the September 2024 Quarter.
Exploration Activities in Western Australia
Andover Project (Lithium)
During the quarter the Company provided a progress report on its plans to drill the
priority lithium-bearing pegmatite targets at the Andover South Project area (E47/4061 &
E47/4062)1.
The Company reported that the State Deed for the Andover South Lithium Project
(E47/4062) had been executed by the Ngarluma Aboriginal Corporation (“NAC”) and the
tenement vendor1. The State Deed was subsequently submitted to the Department of
Energy, Mines, Industry Regulation and Safety (“DEMIRS”), and following this, tenement
E47/4062 was granted. The Company also announced that tenement E47/4061 was
renewed for a further five-year term.
In parallel with the administrative advancement of the project, the Company completed
its preparations for the drilling campaign on the key target areas, with drilling on Andover
South commencing for an initial 5,000 metres with an election to expand the program to
10,000 metres2.
Page 2 of 12
ASX RELEASE | 24 October 2024
Figure 1: Raiden’s Andover South Project and adjacent SH Mining Pty Ltd’s (ex-Azure Minerals)
Andover Lithium project6,7
As a result of an ongoing mapping program, the Company announced the definition of a
new high-priority target area on the Andover South lithium project - Target Area 73.
Target Area 7 – is located on the north-western part of E47/4062 tenement. The area is
characterised by a swarm of North-West trending pegmatites over an approximate strike
extent of 650m. According to K/Rb ratio analysis, the pegmatites are highly fractionated
and considered to be highly prospective for LCT mineralisation. Management believe that
Area 7 may represent a dislocated strike extent of high priority Target Area 1.
Page 3 of 12
ASX RELEASE | 24 October 2024
Figure 2: Andover South Project – zones of interest based on fractionation analysis of pegmatites,
with recently defined zone 7 highlighted in red3,11
During the quarter, the Company announced the results of a district scale interpretation
of the Andover Complex structural framework and controls on defined mineralisation 4.
The preliminary interpretation has identified that that the pegmatites at Andover South
on E47/4061 and E47/4062, appear to be hosted within the same structural North-East
trend, which hosts mineralised lithium pegmatites of Azure Minerals Limited Andover
Project located on the adjacent tenement. Furthermore, in both instances, the
mineralisation defined to date appears to be associated with second order north-east and
north-north-east striking faults, which are further displaced by post mineralisation
faulting.
Page 4 of 12
ASX RELEASE | 24 October 2024
Figure 3: Andover South Project location and the preliminary structural interpretation of the
Andover Complex, in relation to currently defined mineralisation at Andover South target and the
Andover Deposit4
The Company also announced that it had engaged a new technical team to lead the
exploration program on the Andover North & South projects5. The team consists of
geologists who have extensive experience in lithium exploration and in articular within
the Andover Complex, on the Andover lithium discovery with Azure Minerals Ltd.
Mt Sholl Project (Ni-Cu-PGE)
During the quarter, the Company announced6 that First Quantum Minerals completed an
archaeological/anthropological
heritage
survey,
with
the
Ngarluma
Aboriginal
Corporation (“NAC”), over the priority copper-nickel-PGE targets at the Mt Sholl Project
area. First Quantum Minerals conducted the heritage survey as part of its activities under
the memorandum of understanding (“MOU”)7, with First Quantum Minerals sole funding
all the base metal related activities on the Mt Sholl project. The two-day Mt Sholl heritage
Page 5 of 12
ASX RELEASE | 24 October 2024
survey was completed on the 17th August 2024 and covered those areas that First
Quantum Minerals has been assessing for drill testing. Commencement of the drill
campaign on the project is planned for the fourth quarter of 2024.
Arrow Project (Gold)
During
the
quarter,
the
Company
archaeological/anthropological
heritage
announced
that
it
had
completed
survey8,
with
the
elders
and
an
senior
representatives of Kariyarra Pirnthurrna claimant group (“Pirnthurrna”), in conjunction
with its partner Mallina Co Pty Ltd (“Mallina”)9, over its exciting gold targets at the Arrow
Project area (E47/3476). Subject to the final report confirming the outcome of the heritage
survey, Mallina intends to conduct an air-core drilling program before the end of 2024, to
test potential gold targets.
Mallina has committed to a minimum exploration expenditure of $600k, which shall
include at least 3,000 metres of AC drilling within 12 months of execution of the
agreement (Minimum Obligation period).
Other Australian Projects
Management continued to engage with potential partners regarding the divestment and
partnerships regarding non-core assets in Australia.
Page 6 of 12
ASX RELEASE | 24 October 2024
Exploration Activities in Bulgaria and Serbia
Vuzel (Gold/Silver)
During the quarter, the Company undertook no further field activities on the project. The
Company continued planning activities in regard to a drilling program targeted before
the end of 2024 on the Vuzel gold/silver project.
Other Bulgarian Projects
No further activities were undertaken during the quarter.
Donje Nevlje (Copper/Gold)
No activities were undertaken on the project during the quarter.
Corporate
New Appointments
During the quarter the Company appointed a key technical team ahead of Andover South
drilling, including Mr Sean Halpin as Chief Operating Officer, Mr Aaron Hawley as acting
Project Manager for the Andover South lithium project and Mr Mike Roche as a geologist
for Andover South5. Mr Hawley and Mr Roche both have extensive experience in lithium
exploration, including in the Andover Complex with Azure Minerals Ltd.
Performance Rights
As at 30 September 2024, the Company had 18,250,000 Performance Rights (issued in
2021) and 1,500,000 Performance Rights (issued in 2023) on issue with various vesting
conditions to Key Management Personnel. Subsequent to end of 30 September 2024, the
18,250,000 Performance Rights lapsed and were cancelled.
Options Exercised
During the quarter the Company raised approximately $440k from exercise of 29,346,646
listed RDNOA options at exercise price of $0.015, at the date of this announcement the
Company has 383,390,025 exercisable at $0.015 with an expiry date of 30 November 2024.
Page 7 of 12
ASX RELEASE | 24 October 2024
Events Post Reporting Period
On the 18 October 202410, the Company announced it had completed a placement of
312,500,000 fully paid ordinary shares (Shares) at 3.2c per Share raising $10M (before
costs), to sophisticated, professional and institutional investors.
Proceeds from the Placement have provided further funding to advance beyond the initial
planned drilling activities at the Company’s Andover North and Andover South lithium
Projects (for up to 15,000m of drilling), the Vuzel Gold Project (for up to 3,000m of drilling)
and working capital.
The Company’s current cash on hand at the date of this announcement (and after costs
of the raise) was ~$14.1M.
Summary of Expenditure
Of the total expenditure of the Company during the Quarter, $938k of the Company’s
expenditure was on activities related to the exploration of the current projects as detailed
in the Cashflow Report (5B) appended to this report. The Company did not incur any
expenditure related to mining, production and development activities during the Quarter.
In accordance with ASX Listing Rule 5.3.5 payments totalling approximately $167k were
made to related parties of the Company, comprising $109k for Managing Director and
Non-Executive Director fees and $58k for accounting and company secretarial fees
(section 6.1 of the accompanying 5B).
Tenement Table: ASX Listing Rule 5.3.3
Mining tenement interests held at the end of the quarter and their location:
Tenement reference
Location
Serbia
Nature
Status
Inter
est
Direct
Granted
100%
Direct
Granted
100%
Direct
Granted
100%
Donje Nevlje 310-021547/2015-02
Zapadni Majdanpek
310-02-1096/2016-02
Zlatusha (Bulgaria) –
Licence No. 486
BG1 (Bulgaria) –
Permit No. 527
Mt Sholl (E47/4309)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3468)
Western Australia
Direct
Granted
100%
Serbia
Bulgaria
Bulgaria
Direct
Pending
100%
Page 8 of 12
ASX RELEASE | 24 October 2024
Tenement reference
Location
Nature
Status
Inter
est
Mt Sholl (P47/2024)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3181)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3339)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1762) (b)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1787)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1788)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1789)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1790)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1791)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1792)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1793)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1794)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1795)
Western Australia
Direct
Granted
100%
Yandicoogina(M45/115)
Western Australia
Direct
Granted
100%
Yandicoogina (M45/987)
Western Australia
Direct
Granted
100%
Arrow (E47/3476)
Western Australia
Direct
Granted
100%
Arrow (E47/3478)
Western Australia
Direct
100%
Pyramid (E47/4300)
Western Australia
Direct
Granted – currently subject to
Forfeiture after a recent Wardens
Court decision rejecting Raiden’s
Expenditure Exemption
application. Raiden are currently
following due process to resolve
this issue
Granted
Andover (E47/3849)
Western Australia
Direct
Granted
80%
Andover (E47/4061)
Western Australia
Direct
Granted
80%
Andover (E47/4062)
Western Australia
Direct
Granted
80%
Andover (E47/4063)
Western Australia
Direct
Granted
80%
100%
Mining tenement interests relinquished during the quarter and their location:
Nil
Mining tenement interests acquired during the quarter and their location:
Nil
Page 9 of 12
ASX RELEASE | 24 October 2024
Mining tenement interests under application during the quarter and their location:
Tenement reference
Majdanpek Pojas - 310-02-1999
/2020-02
Tabba Tabba (E45/6701)
Pyramid (E47/4307)
Andover (P47/2028)
Andover (E47/4603)
Andover (E47/5038)
Mt Sholl (M47/1651)
(b)
Location
Nature
Status
Interest
Serbia
Direct
Application - pending
100%
Western Australia
Direct
Application - pending
100%
Western Australia
Western Australia
Direct
Direct
Application - pending
Application - pending
100%
80%
Western Australia
Direct
Application - pending
100%
Western Australia
Direct
Application - pending
100%
Western Australia
Direct
Application – pending
100%
Beneficial percentage interests held in farm-in or farm-out agreements at the end
of the quarter:
Tenement reference
Vuzela (Bulgaria) – Licence No. 522
Location
Nature
Status
Interest
Bulgaria
Joint Venture
Granted
51%
a The Company has an agreement to earn-in up to 90% position within the project. At the end of the quarter the
Company held 51% interest in Vuzel Minerals EOOD, which holds the Vuzel licence.
(b) The Company holds 100% in tenement P47/1762 which is being converted into M47/1651, application pending.
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly, or in the commentary of, this quarterly activities release
ASX:RDN 21 August 2024 Approvals & expected drilling timetable for Li Project
1
ASX: RDN 30 September 2024 Drilling Commenced on Andover South Lithium Project and Proposed
Director Incentives
2
ASX:RDN 23 September 2024 Mapping confirms new high-priority target zone at Andover
3
ASX:RDN 27 September 2024 Andover South preliminary structural interpretation
4
Page 10 of 12
ASX RELEASE | 24 October 2024
ASX:RDN 17 September 2024 Company bolsters technical team for Andover South drilling
5
ASX:RDN 22 August 2024 Heritage survey completed at Mt Sholl Cu-Ni-Co-PGE Project
6
ASX:RDN 13 December 2023 Raiden enters strategic partnership with FQM at Mt Sholl
7
ASX:RDN 30 August 2024 Heritage survey completed at Arrow Gold Project
8
ASX:RDN 09 May 2024 Raiden enters into option agreement over Arrow Gold Project
9
ASX:RDN 18 October 2024 $10 million institution led placement completed
10
ASX:AZS 13 February 2024 More Very Impressive Lithium Intersections from Andover
11
Competent Person's and Compliance Statement
The information in the referenced announcements 1 and 10 footnoted above that relate to Exploration
Results have previously been released to the ASX. The Company confirms that it is not aware of any
information or data that materially affects the information included in the market announcements, and that
all material assumptions and technical parameters underpinning the announcements continue to apply. The
Company confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or construction activities, and (vi) other risks
and uncertainties related to the Company’s prospects, properties and business strategy. Investors are
cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and the Company does not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or nonoccurrence of any events.
Page 11 of 12
ASX RELEASE | 24 October 2024
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed transition energy-metal—gold exploration
Company focused on exploring and developing the Andover Lithium project, the Mt Sholl Lithium project
and the Mt Sholl Ni-Cu-Co-PGE deposit in the Pilbara region of Western Australia. The Company also has a
significant portfolio of exploration projects in WA, including the Arrow Lithium and Gold projects, which
gold project is located 30km along strike from the Hemi discovery. In the emerging and prolific Western
Tethyan metallogenic belt in Eastern Europe, the Company has established a significant exploration
footprint in Serbia and Bulgaria. The Directors believe that the Company is well positioned to unlock value
from this exploration portfolio and deliver a significant mineral discovery.
Page 12 of 12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity:
RAIDEN RESOURCES LIMITED (RDN)
ABN
Quarter ended (“current quarter”)
68 009 161 522
30 September 2024
Current quarter
$A’000
Year to date
(3 months)
$A’000
(938)
(938)
(b) development
-
-
(c) production
-
-
(d) staff and board remuneration
(62)
(62)
(e) administration and corporate costs
(309)
(309)
-
-
46
46
Consolidated statement of cash flows
1.0
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for:
(a) exploration & evaluation
1.3
Dividends received
1.4
Interest and other items of a similar nature received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other - Loan Repayment from Balkan Mineral
Development
-
-
1.8
Other - Konstantin and bank guarantees
150
150
1.9
Net cash from / (used in) operating activities
(1,113)
(1,113)
2.0
Cash flows from investing activities
2.1
Payments to acquire:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration if capitalised
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date
(3 months)
$A’000
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received
-
-
2.5
Other
-
-
2.6
Net cash from / (used in) investing activities
-
-
3.0
Cash flows from financing activities
3.1
Proceeds from issues of equity securities (excluding
convertible debt securities)
-
-
3.2
Proceeds from issue of convertible notes
-
3.3
Proceeds from exercise of share options
440
440
3.4
Transaction costs related to issues of shares,
convertible notes or options
(2)
(2)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (proceeds from unissued shares)
11
11
3.1
0
Net cash from / (used in) financing activities
449
449
4.0
Net increase / (decrease) in cash and cash
equivalents for the period
4.1
Cash at beginning of quarter/year to date
5,710
5,710
4.2
Net cash from / (used in) operating activities (item 1.9
above)
(1,113)
(1,113)
4.3
Net cash from / (used in) investing activities (item 2.6
above)
-
-
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
449
449
4.5
Effect of movement in exchange rates on cash held
(2)
(2)
4.6
Cash and cash equivalents at end of period
5,044
5,044
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
*Refer additional information provided at 8.2.2 below
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
5.0
Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the related
items in the accounts
Current quarter
$A’000
Previous
quarter
$A’000
5,044
5,710
5.1
Bank balances
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
5,044
5,710
*Refer additional information provided at 8.2.2 below
6.0
Payments to related parties of the entity and
their associates
Current quarter
$A'000
6.1
Aggregate amount of payments to the parties in
item 1.2
6.2
Aggregate amount of cash flow from loans to these
parties included in item 2.3
-
6.3
Include below any explanation necessary to
understand the transactions included in items 6.1 and
6.2
-
6.4
Payment for executive salary and non executive
director fees and payments to Onyx Corporate Pty
Ltd for accounting and company secretarial fees.
167
167
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Payment of executive salary and non-executive director fees ($109,249), and payments to related parties for accounting and
company secretarial services ($57,710).
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.0
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the sources of
finance available to the entity.
Total facility
amount at
quarter end
$A’000
Amount
drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Include below a description of each facility above,
including the lender, interest rate and whether it is
secured or unsecured. If any additional facilities have
been entered into or are proposed to be entered into
after quarter end, include details of those facilities as
well.
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing facilities
have been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
-
N/A
8.0
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(1,113)
8.2
Capitalised exploration & evaluation (Item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,113)
8.4
Cash and cash equivalents at quarter end (item 4.6)
5,044
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
5,044
8.7
Estimated quarters of funding available (item 8.6 divided by item 8.3)
4.54
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date: 24 October 2024
Authorised by: the Board of Raiden Resources Limited
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover