Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX RELEASE | 14 April 2025
RAIDEN QUARTERLY ACTIVITIES REPORT
FOR PERIOD ENDED 31 MARCH 2025
Highlights
Andover South Project
•
•
The Company received remaining assay results from the maiden
drilling program completed in December 20241
Li2O mineralised pegmatite intercepts were reported across
Target Areas 1 and 22,3
Mt Sholl Ni-Cu-PGE Project
•
•
Assay results received for RC drilling program4 completed by First
Quantum Minerals5 in December 2024
Extensions to mineralisation identified at the B2 and A1 deposits
and a new discovery of mineralisation identified at Keel target4
Arrow Gold Project
•
Assay results received for the aircore drilling program
completed by Mallina Co Pty Ltd9 in the Dec 2024 quarter
•
Gold and arsenic anomalism associated with intrusives and
northwest striking shear zones identified 7
Vuzel Gold Project
•
Phase 2 drilling campaign initiated on the Vuzel gold project in
Bulgaria8 following on from success from the first campaign9
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
Corporate
•
Cash at end of quarter $14.9m, excluding shares from
divestments
•
Ongoing expense optimisation and reduction of corporate overheads
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
provide its report on activities and progress made during the March 2025 Quarter.
Page 1 of 14
ASX RELEASE | 14 April 2025
Exploration Activities in Western Australia
Andover Project (Lithium)
During the quarter the Company received the last of the assay results from the maiden
diamond drilling program completed in December20241.
The maiden drilling program defined two distinct pegmatite systems, a North-West
trending system in Target Area 6 & 7 and an East - West trending system in Target Areas
1,2,3 and 4 (Fig.1).
High grade mineralisation (>2% Li2O)2,3, is associated with the highly fractionated
pegmatites of the East-West striking system in Target Areas 1 and 2, whereas significant
Li2O mineralisation was not identified in the drillholes in Target Area 72.
Drill core observations and magnetic data suggest mineralisation intercepted in Target
Areas 1 and 2 may represent the periphery of a larger, untested system located south of
the drilled area (“Southern Corridor target2”) (Fig.2).
Figure 1: Drilling Target Areas and Drillhole Locations
Page 2 of 14
ASX RELEASE | 14 April 2025
Figure 2: Interpreted Structural Target Areas E47/4062 and E47/4061
Mt Sholl Project (Ni-Cu-PGE)
During the quarter, the Company announced receipt of assay results4 from the First
Quantum Minerals drilling program on the Mt Sholl Project, where 10 Reverse Circulation
holes were completed in December 2024. The program was designed to test new targets
as well as direct extensions of the mineral resource and the JORC Exploration Target
previously defined by the Company6. The program was managed and financed by First
Quantum Minerals under the MOU in place relating to the Mt Sholl project5.
The assay results identified Cu-Ni-PGE mineralisation down-dip and outside of the
resource at the B1 deposit, indicating the potential for further resource extensions to this
deposit (Fig.4).
A new discovery of mineralisation known as the Keel target was also identified in a
previously undrilled part of the Mt Sholl intrusion, which opens the intrusion to further
models of mineralisation not recognised to date (Fig.5).
Page 3 of 14
ASX RELEASE | 14 April 2025
Figure 3: Mt Sholl Project Drillhole Location 4
Figure 4: Section through B2 deposit with recent drill hole in relation to mineral resource 4
Page 4 of 14
ASX RELEASE | 14 April 2025
Figure 5: Section Through Keel Zone with new Drillholes 4
The drilling program also identified down-dip extensions outside of the existing resource
boundary to the mineralisation at the A1 deposit (Fig.6). One of the holes drilled here
ended in mineralisation due to excessive water inflow.
Page 5 of 14
ASX RELEASE | 14 April 2025
Figure 6: Section Through A1 NE Extension Zone with new Drillholes 4
Arrow Project (Gold)
During the quarter, the Company announced that it had received assay results for the
aircore (“AC”) drilling campaign on the Arrow Gold Project completed by Joint Venture
partner Mallina Co Pty Ltd10,11 in the December 2024 quarter.
The objective of the AC drilling program was to evaluate Hemi-style orogenic gold targets
previously identified by Raiden on tenement E47/3476. These targets are associated with
felsic magnetic intrusive bodies, shear zones and hydrothermal alteration12.
The drilling program identified slightly elevated gold and arsenic values in the southern
part of the area drilled, centred around hole 24MALAC079 (26.5ppb Au and 196.7ppm As)
and associated with felsic intrusives and ultramafic rocks7. Low gold and arsenic values
were recorded in the central and northern parts of the tenement covered by the drilling
program (ref. Fig.7 below).
Page 6 of 14
ASX RELEASE | 14 April 2025
Given the wide spacing of the of the aircore drillholes, further work is required to identify
potential RC drill targets.
Figure 7: Arrow Gold Project aircore hole locations showing maximum down-hole Au (ppb) over
interpreted geology10
Page 7 of 14
ASX RELEASE | 14 April 2025
Exploration Activities in Bulgaria
Vuzel (Gold/Silver)
During the quarter, the Company commenced with second drilling campaign on the Vuzel
gold project.8
The Phase 2 drilling program builds upon the success of the 2022 maiden drilling
campaign, which confirmed gold mineralisation in all 11 drill holes9. This Phase 2 program
comprises an initial 2,000m of diamond drilling, targeting mineralisation at relatively
shallow depths. The program could be expanded, however will be dependent on the initial
results. The campaign will focus on a combination of infill and extensional drilling, guided
by recent structural interpretations of the project and past drilling results.
The drilling campaign aims to deepen Raiden’s understanding of the mineralised system
and generate critical insights to guide future exploration at the Vuzel project. Raiden’s
longer-term objective is to delineate a potentially viable gold resource at Vuzel, with all
ongoing exploration activities to remain data-driven. Should exploration results confirm
a viable mineral resource, Raiden believes that the project's proximity to third-party
processing infrastructure and other deposits may provide potential synergies, subject to
further technical and economic assessments.
Page 8 of 14
ASX RELEASE | 14 April 2025
Figure 1 – Location of Vuzel project in relation to neighbouring infrastructure and other gold
deposits8,13,14
Corporate
Financial
At the end of the quarter the Company has $14.9m in cash, excluding shares held from
divestments. Following a busy period of exploration last year, in-line with the boards
policy of disciplined cash management, the Company has undertaken a further expense
optimisation exercise and reduced corporate overheads. The board will continue to review
its cash management, with a focus on allocating capital strictly to projects that enable
immediate deployment of funds into drilling and those that can deliver stronger nearterm value potential. Further divestments and joint ventures of non-core projects are
being explored to bolster Raiden’s balance sheet and reduce holding costs.
Page 9 of 14
ASX RELEASE | 14 April 2025
Performance Rights
As at 31 December 2024, the Company had 1,500,000 Performance Rights (issued in 2023).
Summary of Expenditure
Of the total expenditure of the Company during the Quarter, $1.1m (Main costs include:
Drilling $484k, Equipment Hire $184k, Assays costs $161K and Labour Hire $84k), of the
Company’s expenditure was on activities related to the exploration of the projects as
detailed in the Cashflow Report (5B) appended to this report. The Company did not incur
any expenditure related to mining, production and development activities during the
Quarter.
In accordance with ASX Listing Rule 5.3.5 payments totalling approximately $125k were
made to related parties of the Company, comprising $89k for Managing Director and NonExecutive Director fees and $36k for accounting and company secretarial fees (section 6.1
of the accompanying 5B).
Tenement Table: ASX Listing Rule 5.3.3
Mining tenement interests held at the end of the quarter and their location:
Location
Tenement reference
Bulgaria
Nature
Status
Inter
est
Direct
Renewal pending
100%
Zlatusha (Bulgaria) –
Licence No. 486
BG1 (Bulgaria) –
Permit No. 527
Mt Sholl (E47/4309)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3468)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/2024)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3181)
Western Australia
Direct
Granted
100%
Western Australia
Direct
Granted
100%
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1787)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1788)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1789)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1790)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1791)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1792)
Western Australia
Direct
Granted
100%
Bulgaria
Mt Sholl (E47/3339)
Mt Sholl (P47/1762)
(b)
Direct
Pending
100%
Page 10 of 14
ASX RELEASE | 14 April 2025
Location
Mt Sholl (P47/1793)
Western Australia
Direct
Granted
Inter
est
100%
Mt Sholl (P47/1794)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1795)
Western Australia
Direct
Granted
100%
Arrow (E47/3476)
Western Australia
Direct
Granted
100%
Arrow (E47/3478)
Western Australia
Direct
100%
Andover (P47/2028)
Western Australia
Direct
Granted – currently subject to
Forfeiture after a recent Wardens
Court decision rejecting Raiden’s
Expenditure Exemption
application. Raiden are currently
following due process to resolve
this issue
Granted
Andover (E47/3849)
Western Australia
Direct
Granted
80%
Andover (E47/4061)
Western Australia
Direct
Granted
80%
Andover (E47/4062)
Western Australia
Direct
Granted
80%
Andover (E47/4063)
Western Australia
Direct
Granted
80%
Tenement reference
Nature
Status
80%
Mining tenement interests relinquished during the quarter and their location:
Donje Nevlje 310-021547/2015-02
Zapadni Majdanpek
310-02-1096/2016-02
Pyramid (E47/4300)
Serbia
Direct
Relinquished
100%
Serbia
Direct
Relinquished
100%
Western Australia
Direct
Relinquished
100%
Mining tenement interests acquired during the quarter and their location:
Nil
Mining tenement interests under application during the quarter and their location:
Tenement reference
Majdanpek Pojas - 310-02-1999
/2020-02
Andover (E47/4603)
Mt Sholl (M47/1651) (b)
Location
Nature
Status
Interest
Serbia
Direct
Application - pending
100%
Western Australia
Direct
Application - pending
100%
Western Australia
Direct
Application – pending
100%
Page 11 of 14
ASX RELEASE | 14 April 2025
Beneficial percentage interests held in farm-in or farm-out agreements at the end
of the quarter:
Tenement reference
Vuzela (Bulgaria) – Licence No. 522
Location
Nature
Status
Interest
Bulgaria
Joint Venture
Granted
51%
a The Company has an agreement to earn-in up to 90% position within the project. At the end of the quarter the
Company held 51% interest in Vuzel Minerals EOOD, which holds the Vuzel licence.
(b) The Company holds 100% in tenement P47/1762 which is being converted into M47/1651, application pending.
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly, or in the commentary of, this quarterly activities release
ASX:RDN 6 December 2024 Andover South and Capital Structure Update
1
ASX:RDN 13 January 2025 Final Assay Results from Andover South Maiden Drilling Program
2
ASX:RDN 26 November 2024 Significant pegmatite system intercepted at Andover South
3
ASX:RDN 27 February 2025 New Discovery and extensions to Ni-Cu Mineralisation
4
ASX:RDN 13 December 2023 Raiden enters strategic partnership with FQM at Mt Sholl
5
ASX:RDN 03 April 2023 Maiden Mineral Resource Estimate & JORC Exploration Target
6
ASX:RDN 14 February 2025 Arrow gold project aircore drilling results
7
ASX:RDN 26 March 2025 Raiden commences Phase 2 drilling at Vuzel Gold Project
8
ASX:RDN 6th July, 2022 Gold Discovery at Raiden’s Vuzel Project in Bulgaria
9
ASX:RDN 18 November 2024 Arrow gold project drilling update
10
ASX:RDN 09 May 2024 Raiden enters into option agreement over Arrow Gold Project
11
ASX:RDN 16 March 2022 Drilling results from Arrow Project and Company Update
TSXV:VLC 15 December 2021 Pre-Feasibility Study for the Rozino Gold Project, Bulgaria REPORT Nº
R366.2020
14
TSX:DPM Dundee Precious Metals 31 December 2022 – MINERAL RESOURCE AND MINERAL RESERVE
UPDATE – ADA TEPE MINE, KRUMOVGRAD, BULGARIA
12
13
Page 12 of 14
ASX RELEASE | 14 April 2025
Competent Person's and Compliance Statement
The information in the referenced announcements 1 - 12 footnoted above that relate to Exploration Results
have previously been released to the ASX. The Company confirms that it is not aware of any information or
data that materially affects the information included in the market announcements, and that all material
assumptions and technical parameters underpinning the announcements continue to apply. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Mineral Resources
The Company confirms it is not aware of any new information or data that materially affects the information
included in the 3 April 2023 (Maiden Mineral Resource Estimate and JORC Exploration Target) Mineral
Resource estimate and all material assumptions and technical parameters underpinning the estimate
continue to apply and have not materially changed when referring to its resource announcement made on
3 April 2023. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcements
Mt Sholl Mineral Resource Estimate by classification reported above a 0.35% Ni_Eq cut-off for open pit
resources and at 0.5% Ni_Eq for underground resources as reported on 3 April 2023.
Mineral Resources Estimate (as at 30 March 2023)
Tonnes
Mt
Ni
%
Cu
%
Co
ppm
3E1
g/t
Ni Metal
kt
Cu Metal
kt
3E
(Pd, Pt,
Au)
oz
Indicated
10.5
0.39
0.45
134
0.32
41.0
47.3
108,031
Inferred
9.8
0.29
0.32
78
0.32
28.4
31.3
100,715
Total
20.3
0.34
0.39
107
0.32
69.34
78.6
208,745
3.1
0.48
0.47
57
0.25
14.9
14.6
24,898
Classification
Open Pit
Underground
Inferred
Notes:
•
Mineral Resources are reported in accordance with the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (The Joint Ore Reserves Committee Code
–JORC 2012 Edition).
•
Data is reported to significant figures and differences may occur due to rounding.
•
Mineral Resources have been reported above a cut-off grade of 0.35 % Nickel equivalent for open
pit resources and above 0.5% Nickel equivalent for underground resources.
•
Bulk densities in the Basal unit are 3.06 and in Zone2 are 2.91. These figures represent averages of
the values collected in the respective domains from the 2022 drill program.
•
The Ni_Eq calculation represents total metal value for each metal summed and expressed in
equivalent nickel grade and tonnes.
Page 13 of 14
ASX RELEASE | 14 April 2025
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or construction activities, and (vi) other risks
and uncertainties related to the Company’s prospects, properties and business strategy. Investors are
cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and the Company does not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or nonoccurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual exploration company focused on identifying
and discovering significant and economically attractive mineral deposits. Driven by a passion for unlocking
discoveries that create shareholder value and the support of a strong corporate treasury, Raiden is
committed to achieving exploration success.
The Company’s portfolio of projects includes the Andover North-South, Mt Sholl and Arrow lithium projects.
The Company also holds the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold
projects in the Pilbara region of Western Australia. In addition, the Company holds the rights to multiple
projects in the emerging and prolific Western Tethyan metallogenic belt in Eastern Europe, where it has
established a significant exploration footprint.
Page 14 of 14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity:
RAIDEN RESOURCES LIMITED (RDN)
ABN
Quarter ended (“current quarter”)
68 009 161 522
31 March 2025
Current quarter
$A’000
Year to date
(9 months)
$A’000
(1,104)
(4,704)
(b) development
-
-
(c) production
-
-
(60)
(190)
(e) administration and corporate costs*
3
(763)
1.3
Dividends received
-
-
1.4
Interest and other items of a similar nature received
124
249
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other - Loan Repayment from Balkan Mineral
Development
-
-
1.8
Other - FQM
-
151
(1,037)
(5,257)
-
-
(421)
(421)
(c) property, plant and equipment
-
-
(d) exploration if capitalised
-
-
(e) investments
-
-
(f)
-
-
Consolidated statement of cash flows
1.0
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for:
(a) exploration & evaluation
(d) staff and board remuneration
1.9 Net cash from / (used in) operating activities
* Includes GST refund of $296k
2.0
Cash flows from investing activities
2.1
Payments to acquire:
(a) entities
(b) tenements
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date
(9 months)
$A’000
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received
-
-
2.5
Other
-
-
2.6
Net cash from / (used in) investing activities
(421)
(421)
3.0
Cash flows from financing activities
3.1
Proceeds from issues of equity securities (excluding
convertible debt securities)
-
10,000
3.2
Proceeds from issue of convertible notes
-
-
3.3
Proceeds from exercise of share options
-
5,544
3.4
Transaction costs related to issues of shares,
convertible notes or options
-
(665)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (proceeds from unissued shares)
-
11
3.1
0
Net cash from / (used in) financing activities
-
14,890
4.0
Net increase / (decrease) in cash and cash
equivalents for the period
(1,458)
9,212
4.1
Cash at beginning of quarter/year to date
16,380
5,710
4.2
Net cash from / (used in) operating activities (item 1.9
above)
(1,037)
(5,257)
4.3
Net cash from / (used in) investing activities (item 2.6
above)
(421)
(421)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
14,890
4.5
Effect of movement in exchange rates on cash held
(9)
(9)
4.6
Cash and cash equivalents at end of period
14,913
14,913
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
*Refer additional information provided at 8.2.2 below
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
5.0
Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the related
items in the accounts
Current quarter
$A’000
Previous
quarter
$A’000
14,913
16,380
5.1
Bank balances
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
14,913
16,380
*Refer additional information provided at 8.2.2 below
6.0
Payments to related parties of the entity and
their associates
6.1
Aggregate amount of payments to the parties in
item 1.2
6.2
Current quarter
$A'000
125
-
Aggregate amount of cash flow from loans to these
parties included in item 2.3
-
-
6.3
Include below any explanation necessary to
understand the transactions included in items 6.1 and
6.2
-
-
6.4
Payment for executive salary and non executive
director fees and payments to Onyx Corporate Pty
Ltd for accounting and company secretarial fees.
125
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Payment of executive salary and non-executive director fees ($89,166), and payments to related parties for accounting and
company secretarial services ($35,643).
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.0
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the sources of
finance available to the entity.
Total facility
amount at
quarter end
$A’000
Amount
drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Include below a description of each facility above,
including the lender, interest rate and whether it is
secured or unsecured. If any additional facilities have
been entered into or are proposed to be entered into
after quarter end, include details of those facilities as
well.
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing facilities
have been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
-
N/A
8.0
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(1,037)
8.2
Capitalised exploration & evaluation (Item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,037)
8.4
Cash and cash equivalents at quarter end (item 4.6)
14,913
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
14,913
8.7
Estimated quarters of funding available (item 8.6 divided by item 8.3)
14.37
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date: 14 April 2025
Authorised by: the Board of Raiden Resources Limited
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5