High Grade Feeder Zone Intersected at Vuzel Gold Project
Released
Released
Announcement PDF
ASX RELEASE | 01 July 2025
HIGH-GRADE FEEDER ZONE INTERSECTED AT
VUZEL GOLD PROJECT
QUICK STATS
HIGHLIGHTS
•
•
•
•
ASX Code: RDN
Assay results from a further 4 holes have been received from the
ongoing Phase 2 drilling program, with all holes drilled and
reported to date continuing to intersect near surface gold
mineralisation.
Drill hole VZ2527 has intersected a high-grade feeder structure,
with 1.6m @ 7.69g/t Au at 58.7m within the interpreted epithermal
feeder structure previously identified1.
DAX Code: YM4
BOARD &
MANAGEMENT
Non-Executive Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
& Company Secretary
Significant gold intersections from the 4 holes includeA:
o VZ2525: 13.6m @ 0.58g/t from 19.4m
▪ Including 5.0m @ 1.30g/t Au from 21.0m
o VZ2526: 5.1m @ 0.76g/t Au from 20.9m
o VZ2527: 17.3m @ 0.93g/t Au from 43.0m
▪ Including 1.6m @ 7.69g/t Au from 58.7m
o VZ2528: 10.0m @ 1.03g/t Au from 15.5m
▪ And 11.0m @ 0.98g/t Au from 30.5m
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
Raiden is confident that drilling to date has identified at least one
feeder zone (associated with drill hole VZ2527). Other high-grade
results achieved to date, including intercepts up to 24g/t Au over
1.5m in certain intervals2, may represent proximity to other potential
feeder zones.
BULGARIA
Cu, Au & Ag
•
The results achieved to date continue to reinforce Raiden’s view that Vuzel may host a
substantial near-surface gold system, characterised by both widespread mineralisation and
potentially multiple high-grade feeder zones.
•
Drilling is continuing as part of the expanded 4,000m program at Vuzel3, with a focus on
targeting potential epithermal feeder structures and defining the full extent of mineralisation.
• Engage directly with us by commenting on our latest announcements via InvestorHub. You
can view and comment on this announcement here.
A: Downhole width is not equivalent to true thickness. Structural
measurement and analysis of drill core is ongoing to establish the true
orientation of the mineralisation.
P 08 6158 9990
Suite 7, 63 Shepperton Road, Victoria Park, WA 6100
ABN 68 009 161 522
Page 1 of 18
ASX RELEASE | 01 July 2025
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to report further
assay results received from the ongoing 2025 Phase 2 diamond drilling program on the Vuzel Gold
Project (“Vuzel”) in south-eastern Bulgaria.
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“We are very pleased with this latest batch of results, which includes one of the highest gold grade
assays returned to date at 7.69g/t and is associated with the previously reported potential feeder
structure within hole VZ2527. The combination of widespread gold mineralisation across the broader
footprint, along with the recognition of high-grade zones associated with one or potentially more
epithermal feeder structures, reinforces our view that Vuzel may host a substantial near-surface gold
system.
Drilling is continuing as part of the expanded Phase 2 program and our focus remains on targeting
potential epithermal feeder zones, with the view that these zones may replicate across the deposit,
considering the extent of the mineralised footprint of the target area. As a result of ongoing drilling, the
mineralised footprint has also continued to expand along the 4km strike extent defined through
anomalous gold mineralisation and the system remains open in multiple directions.
The cumulative results achieved over the course of the Phase 2 drilling campaign to date continue to
provide strong validation of the exploration model we have developed for Vuzel. Given the geological
setting and the context of recent M&A activity in the region, Vuzel is emerging as a technically
compelling and high-potential asset. I look forward to updating shareholders as further results are
received.”
VUZEL PHASE 2 DRILLING PROGRAM UPDATE
The Phase 2 drilling campaign was recently expanded to 4,000m3, with the aim of extending the
mineralised footprint along strike and testing further targets within the 3-4km mineralised corridor.
This follows Raiden successfully meeting the investment criteria for a 75% ownership in the Vuzel
Project4. Raiden retains a pathway to 90% ownership through the definition of a JORC resource.
This is the second drill campaign and extends over several kilometres and is characterised by near
surface gold mineralisation, including high-grade sections defined drilling completed by Raiden.
The latest set of assay results has further extended the extent of near surface mineralisation, as well
as strengthened our geological model that the mineralisation within the broader, conglomerate
hosted zone is related to higher-grade epithermal feeder zones.
Significant intersections from the latest batch of assay results of from the Phase 2 drilling program
include:
o VZ2525: 13.6m @ 0.58g/t from 19.4m
▪ Including 5.0m @ 1.30g/t Au from 21.0m
Page 2 of 18
ASX RELEASE | 01 July 2025
o VZ2526: 5.1m @ 0.76g/t Au from 20.90m
o VZ2527: 17.3m @ 0.93g/t Au from 43.0m
▪ Including 1.6m @ 7.69g/t Au from 58.7m
o VZ2528: 10.0m @ 1.03g/t Au from 15.5m
▪ And 11.0m @ 0.98g/t Au from 30.5m
Drilling is ongoing with the expanded 4,000m program.
The distinct silicified and brecciated zone, now interpreted to be a epithermal feeder zone following
the receipt of new assay results, is associated with high-grade mineralisation in drill hole VZ252721.
Management believes that there is a high likelihood that there are multiple feeder zones over the
4km target area and further drilling and exploration activities will be undertaken to define them.
Figure 1: Vuzel Exploration permit, structures, geology and exploration targets.
Page 3 of 18
ASX RELEASE | 01 July 2025
Figure 2: Vuzel Central Zone Drill plan and drillhole locations over 1.5km strike, including the location of drill
hole VZ2527, the newly identified feeder zone which contains gold values of 7.69g/t over 1.6m.
Gold mineralisation at Vuzel is associated with zones of oxidised, silicified conglomerates and
sandstones with quartz-mica-pyrite and silica-clay-pyrite alteration assemblages. Certain portions of
the system are characterised by higher gold grade intercepts, up to 24g/t Au over 1.5m in certain
intervals2, while the more peripheral zones, showing sericite-clay-chlorite and mica-clay assemblages,
tend to be characterised by lower grades of up to 1-2 g/t Au.
Page 4 of 18
ASX RELEASE | 01 July 2025
Figure 3: Long section indicating the interpreted breccia zone, which is interpreted to be an epithermal feeder
structure and a potential pathway for mineralised fluids.
Page 5 of 18
ASX RELEASE | 01 July 2025
Figure 4: Cross section and interpreted mineralisation with intercepts at the Vuzel Gold Project.
From the relatively limited drilling to date, the current interpretation is for mineralisation to be
preferentially developed along the sub-horizontal conglomerate units, in the vicinity of the
intersections with steep dipping faults. In this scenario the faults represent feeder structures for the
mineralising hydrothermal fluids, which then allow fluids to flow into the permeable conglomerate
units, where changes in chemistry pressure or other physical and chemical conditions allow the gold
and associated minerals to drop out of solution.
VUZEL NEXT STEPS
The Company will continue to roll out the expanded Phase 2 drilling program, which is aimed at
defining the extent of the mineralisation across the deposit area within the broader 3-4km anomalous
corridor. The targeting of potential high-grade feeder structures is also being prioritised. The results
of this expanded 4,000m program will guide any further potential future drill planning, which may
also provide further guidance on the orientation and targeting of the feeder structures within the
sedimentary package, which may host higher gold grades.
Page 6 of 18
ASX RELEASE | 01 July 2025
Should exploration ultimately confirm a viable mineral resource, Raiden believes that the project's
proximity to third-party processing infrastructure and other deposits may provide potential synergies,
subject to further technical and economic assessments.
STRATEGIC VALUE OF VUZEL
The type of geology and setting at Vuzel is similar to that of the epithermal low sulphidation Ada
Tepe deposit, which is currently being mined by Dundee Precious Metals only 30km south-east of
Vuzel (see Figure 5) (TSX: DPM). Vuzel is located <20km from Gorubso-Kardzhali A.D. (a Bulgarian
Mining company) gold processing facility5, whom is also a 30% partner of TSX-V Velocity Minerals
whose Bulgarian portfolio, including the Rozino deposit (573Koz@0.8g/t Au) was recently subject of
a US$59M6 acquisition by Türker Mining, a subsidiary of the Turkish conglomerate Türkerler Holding.
Raiden believes that targeted follow-up exploration and the strategically planned Phase 2 drill
campaign at Vuzel present a compelling exploration opportunity. Raiden looks forward to providing
further updates as the program progresses.
Figure 5 - Location of Vuzel project in Southern Bulgaria in relation to other operating and historical mine
and prospects.
Page 7 of 18
ASX RELEASE | 01 July 2025
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
We value your feedback and questions.
Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
Page 8 of 18
ASX RELEASE | 01 July 2025
ASX Announcements referenced in this release
1
ASX:RDN 19 June 2025 “Potential epithermal feeder zone intersected at Vuzel”
2
ASX:RDN 19 May 2025 “Drilling Confirms Potential significant shallow Au System”
3
ASX:RDN 3 June 2025 “Raiden expands phase 2 drill program at Vuzel Gold Project”
4
ASX:RDN 22 May 2025 “Raiden Meets Investment Criteria to Earn 75% at Strategic Vuzel Gold Project”
Other releases and material referenced in this release
5
https://velocityminerals.com/projects/overview/
TSXV: VLC 28 February 2025 Velocity Enters into Definitive Agreement to Sell All Bulgarian Assets
6
Competent Person's and Compliance Statement
The information previously released to the ASX and referenced in footnotes 1-3 above relate to exploration results that have
previously been released on the ASX. The Company confirms that it is not aware of any information or data that materially
affects the information included in the market announcements, and that all material assumptions and technical parameters
underpinning the announcements continue to apply. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
The information in this announcement that relates to exploration results (including JORC tables) is based on and fairly
represents information and supporting documentation prepared, reviewed and approved by Mr Sean Halpin, a competent
person who is a member of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin is employed by Raiden Resources
Limited. Mr Sean Halpin has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
JORC Code. Mr Sean Halpin has provided his prior written consent as to the form and context in which the exploration results
and the supporting information are presented in this announcement.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”, “believe(s)”,
“will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forward-looking statements.
These statements include, but are not limited to statements regarding future production, resources or reserves and
exploration results. All of such statements are subject to certain risks and uncertainties, many of which are difficult to
predict and generally beyond the control of the Company, that could cause actual results to differ materially from those
expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties
include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of
mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade,
planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined,
(iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks
related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing
on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects,
properties and business strategy. Investors are cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and the Company does not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the
occurrence of or non-occurrence of any events
About Raiden Resources
Page 9 of 18
ASX RELEASE | 01 July 2025
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed base metal & gold exploration Company focused on
identifying and discovering significant and economically attractive mineral deposits. Driven by a passion for unlocking
discoveries that create shareholder value and the support of a strong corporate treasury, Raiden is committed to achieving
exploration success.
The Company’s portfolio of projects includes the Andover South lithium project. The Company also holds the rights to
the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region of Western Australia.
In addition, the Company holds the rights to multiple projects in the emerging and prolific Western Tethyan metallogenic
belt in Eastern Europe, where it has established a significant exploration footprint in Bulgaria.
Table 1: List of drilled holes and intercepts completed at the Vuzel Project as part of this announcement
WGS/UTM
Hole ID
WGS/UTM
RL
Azimuth
Dip
518
140
-45
VZ2525
366503
Z35N
NORTH
4619279
VZ2526
VZ2527
366502
366477
4619283
4619345
525
517
90
90
-50
-50
VZ2528
366485
4619047
522
130
-50
VZ2529
VZ2530
366488
366394
4619034
4619347
494
547
90
270
-50
-50
Z35N EAST
Total
Depth
(m)
200
including
150
150
and
including
150
and
100
150
From
(m)
Length
(m)
19.4
21.0
20.9
14.9
43.0
58.7
15.5
30.5
13.6
0.58
5.0
1.30
5.1
0.76
13.1
0.29
17.3
0.93
1.60
7.69
10.0
1.03
11.0
0.98
Awaiting assays
Awaiting assays
Au ppm
Notes:
• All collar locations are reported as WGS / UTM Zone 35 N.
•
Reported intercepts are estimated above a 0.1 ppm cut-off grade (COG).
•
Maximum internal dilution below the applied COG included in the reported intercepts is 3.0m.
Table 2: JORC Code, 2012 Edition. Section 1.
Criteria
JORC Code explanation
Commentary
• Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling
• Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used
• Sampling comprises only wireline diamond
drilling core in PQ and HQ diameter sizes
• Core was drilled through the full expected
mineralisation intersection, as normal to the
strike as possible, in accordance with the
initial interpretation of the expected
mineralisation
• Half core HQ or quarter core PQ core, cut
along the core axis, has been used for
sampling, comprising the full downhole
length
• If the core is strongly fractured, the material
is sampled with a trowel
• All geological breaks, including lithology,
Page 10 of 18
ASX RELEASE | 01 July 2025
Criteria
• Drilling
techniques
JORC Code explanation
Commentary
• Aspects of the determination of
mineralisation that are Material to the
Public Report
• In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc)
alteration, oxidation, etc., are considered in
the process of sample length selection
• The average down-hole sample length is
between 1m and 3m. In relatively rare
cases the length is below or above the
minimum and maximum, depending on the
geology and mineralization potential of the
interval
• Individual sample weights are between 4-6
kg
• All sampling practices meet industry
standards
• A total of 19 drill holes with a total length of
2,450m have been completed to date in
2025-year drilling campaign
• A total of 4,000m are planned to be drilled
for 2025.
• The drilling campaigns are targeting zones
of gold mineralization, initially outlined by
earlier exploration activities including
mapping, soil sampling, trenching and
historical drilling
• In order to enhance the drilling efficiency
and core recovery, a triple tube and drilling
fluid additives such as polymer and
bentonite, were used
• All of the drilling is inclined, predominantly
dipping at 50 degrees. The drill hole collars
were designed in accordance with the initial
interpretation of the mineralization zone,
aiming to intercept it as close to true
thickness as possible
• Each hole has a down-hole survey, made
approximately at 25m intervals using a
digital down-hole survey tool (“DeviShot”)
• The used drilling equipment is in good
condition, provided and operated by local
drilling subcontractor, with wide experience
in SE Europe (“Geops”)
• Drill sample
recovery
• Method of recording and assessing
core and chip sample recoveries and
results assessed
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material
• Core recovery is logged as percent of the
core recovery length versus drill run length,
and it is logged directly in the core boxes,
immediately after the core is transported to
the field core shed
• Through the drilling process, to maximize
the core recovery, triple core tube and
additive drilling muds and polymers were
used
• Overall diamond core recovery is above
90%
• There doesn’t appear to be a relationship
Page 11 of 18
ASX RELEASE | 01 July 2025
Criteria
JORC Code explanation
Commentary
bias between grade and length, or sample
weight and recovery
• Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the
relevant intersections logged
• Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples
• Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling
• Whether sample sizes are appropriate
to the grain size of the material being
sampled
• Quality of
assay data
and laboratory
tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
• Core logging by competent trained
geologists includes lithology, hydrothermal
alteration, mineralization, oxidation stage,
core recovery, RQD and degree of
fracturing, structural logging
• 100% of the core is photographed
• 100% of the drilled core has been logged
• Each day the drill core is transported to the
company’s core storage facility in the
village of Stremci, located approximately
5km from the field, for logging and sampling
• The core trays are plastic, including plastic
covers to protect the core from damage
during transport
• After drilling the hole, the collar was capped
and labeled
• Core logging is done on laptops, using MS
Excel spread sheets, and the data is then
incorporated into the company’s database
• Photo documentation is done on wet trays,
and the data is also incorporated in the
database
• Logging procedures meet industry
standards, and are appropriate for further
Mineral Resource Estimation and studies
• All of the current drilled core is sampled.
• All intact core samples are cut along the
long axis, using a core saw, half core HQ
(or quarter PQ) is packed in a labeled bag,
weighed, and further transported to
laboratory for sample processing and
assaying. In case of intensively fractured
zones, samples are taken with a trowel
• Rock density measurements were not
completed, although intervals, with length of
10cm, in a step of between 5 and 10m were
selected in the process of core logging for
density measurement
• All samples are transported to ALS
Romania - Rosia Montana, where they are
pre-processed and assayed
• Through the sample preparation process,
the entire sample is crushed to passing
70% at < 2mm and then pulverize up to
250g with 85% passing 75 um. The pulp is
analyzed with Fire Assay-Atomic
Absorption Ore Grade Method: Au-AA25
Page 12 of 18
ASX RELEASE | 01 July 2025
Criteria
JORC Code explanation
Commentary
and model, reading times, calibrations
factors applied and their derivation,
etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and
precision have been established
• The lower detection limit of the laboratory is
0.01 ppm Au
• The Quality Assurance and Quality Control
scheme (QA/QC) comprises approximately
20 % from the total assays (each 5-th
sample is QAQC), including blanks,
reference material standards (CRMs) and
field duplicates
• The received results of the CRMs (Geostat
PTY and OREAS), a quarter field duplicate
sample), and the blank material collected
from barren industrial sediments are
meeting the standards and confirming the
representativeness of the data
• Pulp and coerce rejects from the laboratory
are and will be stored in the core
company’s storage facility in Stremci
• The QA/QC design and results are
adequate to support estimation of Mineral
Resources
• Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel
• The use of twinned holes
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols
• Discuss any adjustment to assay data
• No twin holes have been completed as the
drilling at Vuzel is still in the early stages
• All the assay results were received
electronically as an Excel spreadsheet,
along with the corresponding quality
certificates from the laboratory
• All data was incorporated in the database
by the database manager
• The access to the database is limited to
authorised employees
• The only adjustment of the assay data is
the replacement of the lower detection limit
of 0.01 ppm to the half of it – 0.005ppm Au
• All data is received and stored securely in
digital format in the Company's database
• Final data is rigorously interpreted by
Raiden’s geoscientific personnel
• Location of
data points
• Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation
• Specification of the grid system used
• Quality and adequacy of topographic
control
• Raiden’s collars surveyed by handheld
GPS with an accuracy of +/- 5m
• Co-ordinates are provided in WGS / UTM
Zone 35 N
• In the time of writing this report a detailed
(cm accuracy) survey of the hole collars
has been completed, but the report is still
not available, hence the data is not
incorporated herein.
• The holes have a downhole survey, taken
at 25 m intervals using Devico survey tool
• 4 degrees positive magnetic declination
was considered in the process of rig
alignment
• Data spacing
and
• Data spacing for reporting of
Exploration Results
• The drilling grid of the current exploration
holes is aiming to advance the initial
Page 13 of 18
ASX RELEASE | 01 July 2025
Criteria
JORC Code explanation
Commentary
distribution
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied
• Whether sample compositing has
been applied
interpretation of the mineralization strike
extent. Several further target areas of
drilling are planned, with approximately drill
spacing of between 50 and 100m
• The hole collars and the sampling spacing
in the completed drilling is sufficient to
confirm continuation of the mineralization
• Sample compositing for metallurgical
testing has not been completed, but is
planned for the second half of 2025
• Orientation of
data in relation
to geological
structure
• All the exploration holes were designed to
intercept the expected dip of the
mineralisation as perpendicular as possible
in order to provide approximate true width
intercepts, and to avoid any sampling
biases
• Sample
security
• Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material
• The measures taken to ensure sample
security
• Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data
• No reviews or audits have been undertaken
• The sample chain of custody is managed
by Raiden
• The core storage is located in the village of
Stremci, and the transportation to the ALS
Romania - Rosia Montana laboratory was
done by courier company – TNT Bulgaria,
part of FedEx Express
• All samples were delivered directly to the
associated carrier by Raiden contractor
personnel before being transported to the
laboratory in Rosa Montana, Romania for
final analysis
Table 3: JORC Code, 2012 Edition. Section 2. (Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
• Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area
• Raiden Resources has an interest in the
Vuzel project, which is in Eastern Rhodope,
Bulgaria, under an earn-in and option to
purchase agreement with the holder of the
Vuzel project, Ridge Consultants EOOD.
Under the Agreement Raiden has a right to
earn in up to a 90% interest, and an option
to acquire a 100% interest in respect of the
Vuzel License
• The Vuzel Project does not fall within the
protected areas according to the Article 5 of
the Protected Areas Act, as well as in
special areas of conservation part of the
Page 14 of 18
ASX RELEASE | 01 July 2025
Criteria
JORC Code explanation
Commentary
European Ecological Network
NATURA2000, within the meaning of the
Law on Biological Diversity
• Important Archaeological object “Ancient
mine” is located in the Vuzel area.
Exploration activities around the
archaeological objects were completed
under the professional supervision of
Ministry of Culture
• Under the Bulgarian Law of Mineral
Resources, on expiration of the initial threeyear exploration period, the holder of the
exploration permit is entitled to apply for an
extension/renewal of the exploration lic
Share your feedback
Discover