Vuzel IP Survey Generates untested Gold and Silver targets
Released
Released
Announcement PDF
ASX RELEASE | 22 September 2025
VUZEL IP SURVEY GENERATES MULTIPLE
UNTESTED GOLD & SILVER TARGETS
ASX Code: RDN
HIGHLIGHTS
•
•
•
•
•
QUICK STATS
DAX Code: YM4
Induced Polarisation (“IP”) Survey has defined multiple untested
structural trends, at the Vuzel Gold Project.
Significantly, the IP survey has also defined new chargeability and
resistivity anomalies, which are consistent with Raiden’s positive
drilling results to date.
These anomalies delineate new exploration target areas (figure 1)
and have significantly expanded the footprint for further
evaluation of gold and silver mineralisation.
Initial interpretations indicate the potential for multiple north &
north-west trending gold vectors/trends, which correlate with
interpreted potential feeder structures (Figure 2), soil geochemistry
anomalies and positive drill results.
Drilling to date has focused on the central target area only (extending
in east-west direction), while the recently identified gold targets now
extend over multiple trends, consisting of up to 3 kilometre
strikes and significantly expand the number of potential targets
(figure 1).
BOARD &
MANAGEMENT
Non-Executive Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
•
Assay results from a further 11 holes have been received from the
Phase 2 drilling program, with significant gold intersections includingA:
o VZ2529: 5.6m @ 1.08g/t Au from 18.4m
o VZ2531: 3.6m @ 2.09g/t Au from 4.0m
o VZ2532: 4.2m @ 1.12g/t Au from 12.6m
o VZ2535: 7.4m @ 0.99g/t Au from 8.6m
o VZ2537: 9.3m @ 0.91g/t Au from 19.8m
•
Across Vuzel’s maiden drill program1 and recent Phase 1 & 2 drill campaigns, all but one hole
has intersected near-surface gold mineralisation along an approximate 2km east-west
strike.
A: Downhole width is not equivalent to true thickness. Structural
measurement and analysis of drill core is ongoing to establish the true
orientation of the mineralisation.
P 08 6158 9990
Suite 7, 63 Shepperton Road, Victoria Park, WA 6100
ABN 68 009 161 522
Page 1 of 23
ASX RELEASE | 22 September 2025
The remaining 550m of the expanded 4,000m program2 remains paused pending approval to
drill the Silver Skarn Anomaly and the finalisation of drill targets which integrate the IP results.
• Engage directly with us by commenting on our latest announcements via InvestorHub. You
can view and comment on this announcement here.
•
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to report on the
IP results that has identified multiple untested gold and silver targets at the Vuzel Gold Project
(“Vuzel”) in south-eastern Bulgaria, and further assay results from the 2025 Phase 2 diamond drilling
program.
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“The IP results mark a real step-change in our understanding of Vuzel and have further reinforced our
confidence in the Project’s prospectivity. The fact that the newly defined structural trends align with
interpreted feeder structures, soil geochemistry anomalies and our positive drill results, strongly
indicates that Vuzel could potentially host a significant and shallow gold system. The integration of
these datasets has defined a suite of new gold and silver targets and expanded the prospective footprint
over several kilometres, well beyond the central area drilled to date.
With permitting for the Skarn Silver Anomaly progressing and new target areas defined through the IP
survey, the next phase of work will focus on finalising our highest priority drill targets. We look forward
to resuming drilling activities at Vuzel once this work is completed and permitting for the Skarn Silver
Anomaly is approved.
While the latest batch of outstanding assay results is relatively modest in grade and width, the results
have continued to confirm the presence of widespread near-surface gold mineralisation across a multikilometre strike. The consistency we have seen to date is significant as it supports our interpretation
that Vuzel may host a substantial near-surface gold system with the potential for multiple high-grade
feeder zones across the Project. Importantly, drilling to date has already demonstrated at least one such
high-grade feeder zone, providing support for our geological model.”
IP SURVEY RESULTS AND INTERPRETATIONS
As previously announced, the Company has paused the expanded Phase 2 drilling program to allow
for the completion of permitting for drilling of the Silver Skarn Anomaly and for processing of the IP
survey results3. This is expected to enable Raiden to finalise its highest-priority gold and silver drill
targets ahead of the resumption of drilling activities.
The IP survey consisted of 7 lines, with a total length of 10.6 kilometres. The lines were oriented NWSE and East-West, with the objective of defining potential high-grade epithermal structures which
were intersected in the drilling, as well as delineating the contacts of the sub horizontal conglomerate
and sandstone units which host the mineralisation. The IP lines were located over the central target
area anomaly, where current drilling has defined shallow mineralisation and epithermal feeder zones,
Page 2 of 23
ASX RELEASE | 22 September 2025
as well as to the north and south along the projected strike of the epithermal feeder zones. A further
IP line was centred across the silver anomaly to assist with defining a better understanding of
structural and geological controls.
On the basis of the interpretation of the results, following conclusions can be derived:
•
The IP survey was able to distinguish between the conglomerate, sandstone and limestone
geological units, as well as map potential feeder structures across multiple trends, which is key
to determining future drilling targets
•
Currently defined mineralisation in the central area appears to correlate to zones of moderate
chargeability and resistivity within the conglomerate units and which are proximal to potential
epithermal feeder structures
•
On the basis of these interpretations, 3 separate north and north-west trends have been
defined as key target areas for further follow up exploration
•
Within these trends, areas of chargeability and resistivity anomalism, in conjunction with
interpreted feeder structures were used to designate priority target areas for future drill
testing.
Figure 1: Vuzel Exploration project depicting the potential drilling targets as defined on the basis of
the IP program and supporting data
Page 3 of 23
ASX RELEASE | 22 September 2025
Figure 2: IP cross section line 5, with interpreted geological units; structures, mineralisation as defined
through drilling and supporting surface anomalism
With the IP results now in hand, Raiden is advancing work to define its highest-priority drill targets
across the Project area, covering both gold and silver prospects.
ASSAY RESULTS FROM THE PHASE 2 DRILLING PROGRAM
Assay results from a further 11 holes have been received from the Phase 2 drilling program, with
significant intersections from the latest batch of assay results including:
o
o
o
o
o
VZ2529: 5.6m @ 1.08g/t Au from 18.4m
VZ2531: 3.6m @ 2.09g/t Au from 4.0m
VZ2532: 4.2m @ 1.12g/t Au from 12.6m
VZ2535: 7.4m @ 0.99g/t Au from 8.6m
VZ2537: 9.3m @ 0.91g/t Au from 19.8m
Page 4 of 23
ASX RELEASE | 22 September 2025
Collectively, results from the maiden, Phase 1 and Phase 2 drilling programs across approximately
2km of the 4km strike at Vuzel remain encouraging, with all but one hole drilled to date intersecting
near-surface gold mineralisation. These findings remain consistent with the Company’s view that
Vuzel represents a potential significant and shallow gold system.
Figure 3: Vuzel Exploration permit, structures, geology and original exploration targets, including location
of Skarn Silver Anomaly (permitting underway). As per figure 1, the controls and extent of the
mineralisation have been significantly expanded across multiple gold and silver vectors
Page 5 of 23
ASX RELEASE | 22 September 2025
Figure 4: Vuzel Central Zone Drill plan and drillhole locations
Gold mineralisation at Vuzel is associated with zones of oxidised, silicified conglomerates and
sandstones with quartz-mica-pyrite and silica-clay-pyrite alteration assemblages. Certain portions of
the system are characterised by higher gold grade intercepts, up to 24g/t Au over 1.5m in certain
intervals4, while the more peripheral zones, showing sericite-clay-chlorite and mica-clay assemblages,
tend to be characterised by lower grades of up to 1-2 g/t Au.
Page 6 of 23
ASX RELEASE | 22 September 2025
Figure 5: Cross section indicating the interpreted outcropping mineralisation
Page 7 of 23
ASX RELEASE | 22 September 2025
Figure 6: Cross section and interpreted mineralisation with intercepts at the Vuzel Gold Project
From the drilling to date, the current interpretation is for mineralisation to be preferentially developed
along the sub-horizontal conglomerate units, in the vicinity of the intersections with steep dipping
faults. In this scenario the faults represent feeder structures for the mineralising hydrothermal fluids,
which then allow fluids to flow into the permeable conglomerate units, where changes in chemistry
pressure or other physical and chemical conditions allow the gold and associated minerals to drop
out of solution.
STRATEGIC VALUE OF VUZEL
The type of geology and setting at Vuzel is similar to that of the epithermal low sulphidation Ada
Tepe deposit, which is currently being mined by Dundee Precious Metals only 30km south-east of
Vuzel (see Figure 7) (TSX: DPM). Vuzel is located <20km from Gorubso-Kardzhali A.D. (a Bulgarian
Mining company) gold processing facility5, whom is also a 30% partner of TSX-V Velocity Minerals
whose Bulgarian portfolio, including the Rozino deposit (573Koz@0.8g/t Au) was recently subject
of a US$59M6 acquisition by Türker Mining, a subsidiary of the Turkish conglomerate Türkerler
Holding.
Page 8 of 23
ASX RELEASE | 22 September 2025
Should exploration ultimately confirm a viable mineral resource, Raiden believes that the project's
proximity to third-party processing infrastructure and other deposits may provide potential synergies,
subject to further technical and economic assessments.
Figure 7 - Location of Vuzel project in Southern Bulgaria in relation to other operating and historical mine
and prospects
Page 9 of 23
ASX RELEASE | 22 September 2025
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
We value your feedback and questions.
Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
Page 10 of 23
ASX RELEASE | 22 September 2025
ASX Announcements referenced in this release
1
ASX:RDN 6 July 2022 “Gold Discovery at Raiden’s Vuzel Project in Bulgaria”
2
ASX:RDN 3 June 2025 “Raiden expands phase 2 drill program at Vuzel Gold Project”
3
ASX:RDN 14 August 2025 “Vuzel Update Silver Anomaly Permit & IP Data Processing”
4
ASX:RDN 19 May 2025 “Drilling Confirms Potential significant shallow Au System”
Other releases and material referenced in this release
5
https://velocityminerals.com/projects/overview/
6
TSXV: VLC 28 February 2025 Velocity Enters into Definitive Agreement to Sell All Bulgarian Assets
Competent Person's and Compliance Statement
The information previously released to the ASX and referenced in footnotes 1-4 above relate to exploration results that have
previously been released on the ASX. The Company confirms that it is not aware of any information or data that materially
affects the information included in the market announcements, and that all material assumptions and technical parameters
underpinning the announcements continue to apply. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
The information in this announcement that relates to exploration results (including JORC tables) is based on and fairly
represents information and supporting documentation prepared, reviewed and approved by Mr Sean Halpin, a competent
person who is a member of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin is employed by Raiden Resources
Limited. Mr Sean Halpin has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
JORC Code. Mr Sean Halpin has provided his prior written consent as to the form and context in which the exploration results
and the supporting information are presented in this announcement.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”, “believe(s)”,
“will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forward-looking statements.
These statements include, but are not limited to statements regarding future production, resources or reserves and
exploration results. All of such statements are subject to certain risks and uncertainties, many of which are difficult to
predict and generally beyond the control of the Company, that could cause actual results to differ materially from those
expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties
include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of
mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade,
planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined,
(iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks
related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing
on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects,
properties and business strategy. Investors are cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and the Company does not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the
occurrence of or non-occurrence of any events
Page 11 of 23
ASX RELEASE | 22 September 2025
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed base metal & gold exploration Company focused on
identifying and discovering significant and economically attractive mineral deposits. Driven by a passion for unlocking
discoveries that create shareholder value and the support of a strong corporate treasury, Raiden is committed to achieving
exploration success.
The Company’s portfolio of projects includes the Andover South lithium project. The Company also holds the rights to
the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region of Western Australia.
In addition, the Company holds the rights to multiple projects in the emerging and prolific Western Tethyan metallogenic
belt in Eastern Europe, where it has established a significant exploration footprint in Bulgaria.
Page 12 of 23
ASX RELEASE | 22 September 2025
Table 1: List of drilled holes and intercepts completed at the Vuzel Project as part of this announcement
WGS/UTM
Hole ID
WGS/UTM
RL
Azimuth
Dip
Z35N EAST
Z35N NORTH
VZ2529
366483.8
4619035.9
507.7
90
-50
VZ2530
VZ2531
366391.7
367309.3
4619348.4
4618800.5
522.0
510.5
270
90
-50
-50
VZ2532
367270.1
4618790.5
513.3
235
-50
VZ2533
367745.7
4618796.0
433.0
90
-50
VZ2534
366932.9
4618833.0
547.7
270
-50
VZ2535
366721.8
4619295.0
464.1
270
-50
VZ2536
366482.8
4619035.0
507.7
310
-50
VZ2537
366482.8
4619036.8
507.7
180
-50
VZ2538
366501.3
4619280.5
517.6
320
-50
VZ2539
366457.7
4619396.6
503.9
90
-50
Total
Length
From (m)
Depth (m)
(m)
100.0
including
and
and
including
150.0
150.0
including
100.0
including
100.0
including
and
including
100.0
and
including
100.0
including
and
including
and
100.0
including
including
and
including
and
150.0
including
100.0
including
and
and
and
including
100.0
18.4
18.4
31.3
81
82.5
0
4
0
12.6
7.1
30.5
59.8
67.5
0
21
25.2
5.2
8.6
23.5
26.5
80.8
22.5
22.5
29.9
59
60.5
79.3
17.7
19.8
28.2
30.2
50
68.9
79.2
80.6
40.6
Au ppm
8.6
5.6
7.2
6.1
4.6
Negative
16.3
3.6
22.4
4.2
39.9
5.7
9.1
1.4
12.7
9.0
1.2
12.3
7.4
7.5
1.6
6.2
13.5
4.0
4.7
4.1
2.6
8.2
16.3
9.3
5.9
3.9
6.0
3.3
7.5
1.4
6.5
0.77
1.08
0.22
0.43
0.52
0.65
2.09
0.38
1.12
0.25
0.46
0.23
0.45
0.19
0.27
0.85
0.67
0.99
0.30
0.43
0.61
0.55
0.59
0.92
0.49
0.72
0.16
0.59
0.91
0.68
0.89
0.16
0.19
0.25
0.57
0.22
Notes:
• All collar locations are reported as WGS / UTM Zone 35N.
•
Reported intercepts are estimated above a 0.1 ppm cut-off grade (COG).
•
Maximum internal dilution below the applied COG included in the reported intercepts is 3.0m.
Table 2: JORC Code, 2012 Edition. Section 1.
Page 13 of 23
ASX RELEASE | 22 September 2025
Criteria
JORC Code explanation
Commentary
• Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling
• Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used
• Aspects of the determination of
mineralisation that are Material to the
Public Report
• In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information
• Sampling comprises only wireline diamond
drilling core in PQ and HQ diameter sizes
• Core was drilled through the full expected
mineralisation intersection, as normal to the
strike as possible, in accordance with the
initial interpretation of the expected
mineralisation
• Half core HQ or quarter core PQ core, cut
along the core axis, has been used for
sampling, comprising the full downhole
length
• If the core is strongly fractured, the material
is sampled with a trowel
• All geological breaks, including lithology,
alteration, oxidation, etc., are considered in
the process of sample length selection
• The average down-hole sample length is
between 1m and 3m. In relatively rare
cases the length is below or above the
minimum and maximum, depending on the
geology and mineralization potential of the
interval
• Individual sample weights are between 4-6
kg
• All sampling practices meet industry
standards
• IP Geophysical Survey: Ground
Induced Polarisation and Resistivity
survey using IRIS Elrec Pro Receiver
and GDD TX4 Transmitter system.
Survey completed by Apex
Engineering Geology & Geophysics
• Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc)
• A total of 28 drill holes with a total length of
3,450m have been completed to date in
2025-year drilling campaign
• A total of 4,000m are planned to be drilled
for 2025.
• The drilling campaigns are targeting zones
of gold mineralization, initially outlined by
earlier exploration activities including
mapping, soil sampling, trenching and
historical drilling
• In order to enhance the drilling efficiency
and core recovery, a triple tube and drilling
fluid additives such as polymer and
bentonite, were used
• All of the drilling is inclined, predominantly
dipping at 50 degrees. The drill hole collars
were designed in accordance with the initial
interpretation of the mineralization zone,
aiming to intercept it as close to true
thickness as possible
• Each hole has a down-hole survey, made
approximately at 25m intervals using a
digital down-hole survey tool (“DeviShot”)
Page 14 of 23
ASX RELEASE | 22 September 2025
Criteria
JORC Code explanation
Commentary
• The used drilling equipment is in good
condition, provided and operated by local
drilling subcontractor, with wide experience
in SE Europe (“Geops”)
• Drill sample
recovery
• Method of recording and assessing
core and chip sample recoveries and
results assessed
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material
• Core recovery is logged as percent of the
core recovery length versus drill run length,
and it is logged directly in the core boxes,
immediately after the core is transported to
the field core shed
• Through the drilling process, to maximize
the core recovery, triple core tube and
additive drilling muds and polymers were
used
• Overall diamond core recovery is above
90%
• There doesn’t appear to be a relationship
bias between grade and length, or sample
weight and recovery
• Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the
relevant intersections logged
• Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples
• Core logging by competent trained
geologists includes lithology, hydrothermal
alteration, mineralization, oxidation stage,
core recovery, RQD and degree of
fracturing, structural logging
• 100% of the core is photographed
• 100% of the drilled core has been logged
• Each day the drill core is transported to the
company’s core storage facility in the
village of Stremci, located approximately
5km from the field, for logging and sampling
• The core trays are plastic, including plastic
covers to protect the core from damage
during transport
• After drilling the hole, the collar was capped
and labeled
• Core logging is done on laptops, using MS
Excel spread sheets, and the data is then
incorporated into the company’s database
• Photo documentation is done on wet trays,
and the data is also incorporated in the
database
• Logging procedures meet industry
standards, and are appropriate for further
Mineral Resource Estimation and studies
• All of the current drilled core is sampled.
• All intact core samples are cut along the
long axis, using a core saw, half core HQ
(or quarter PQ) is packed in a labeled bag,
weighed, and further transported to
laboratory for sample processing and
assaying. In case of intensively fractured
zones, samples are taken with a trowel
• Rock density measurements were not
completed, although intervals, with length of
10cm, in a step of between 5 and 10m were
selected in the process of core logging for
Page 15 of 23
ASX RELEASE | 22 September 2025
Criteria
JORC Code explanation
• Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling
• Whether sample sizes are appropriate
to the grain size of the material being
sampled
• Quality of
assay data
and laboratory
tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times, calibrations
factors applied and their derivation,
etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and
precision have been established
Commentary
density measurement
• All samples are transported to ALS
Romania - Rosia Montana, where they are
pre-processed and assayed
• Through the sample preparation process,
the entire sample is crushed to passing
70% at < 2mm and then pulverize up to
250g with 85% passing 75 um. The pulp is
analyzed with Fire Assay-Atomic
Absorption Ore Grade Method: Au-AA25
• The lower detection limit of the laboratory is
0.01 ppm Au
• The Quality Assurance and Quality Control
scheme (QA/QC) comprises approximately
20 % from the total assays (each 5-th
sample is QAQC), including blanks,
reference material standards (CRMs) and
field duplicates
• The received results of the CRMs (Geostat
PTY and OREAS), a quarter field duplicate
sample), and the blank material collected
from barren industrial sediments are
meeting the standards and confirming the
representativeness of the data
• Pulp and coerce rejects from the laboratory
are and will be stored in the core
company’s storage facility in Stremci
• The QA/QC design and results are
adequate to support estimation of Mineral
Resources
• Geophysical IP Survey: The
•
receiver used for this IP/Resistivity
survey was an IRIS made ElrecPro
multipurpose receiver. This
receiver is a backpack-portable,
microprocessor controlled receiver
capable of gathering data on as
many as 11 channels (10 dipole)
simultaneously.
The signal source for the
IP/Resistivity survey was a GDD
made GDD TX4 transmitter, which
is motor generator-powered and
commonly used for IP surveys. The
transmitter was controlled directly
by the receiver, eliminating the
Page 16 of 23
ASX RELEASE | 22 September 2025
Criteria
JORC Code explanation
Commentary
•
•
•
• Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel
• The use of twinned holes
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols
• Discuss any adjustment to assay data
need for clock synchronization.
One channel of the receiver was
used to monitor and record the
transmitter output.
The data were of good to very
good quality, based on good
repeatability of raw data
measurements and good
repeatability of data from
overlapping electrode spreads.
Contact resistance of the
electrodes was generally good,
except for a few rock outcrops in
some lines.
Induced polarization data for the
project consists of time-domain
with 2 second on and 2 second off
square wave with alternating
positive and negative on phases.
The receiver recorded twenty
arithmetic time slices plus a
weighted average and a filter
number. The twenty time slices
were programmed to record IP
results that closely approximate the
Newmont Standard (0.45 to 1.1
seconds) for time domain data of a
2 second on / off cycle. IP data
were recorded in milliseconds /
second (termed chargeability
here). The time interval was a
delay of 450 milliseconds with
twenty, 30-millisecond intervals
each for the time intervals.
Overall, the stations and readings
that were reoccupied showed
excellent repeatability. There were
no problems with telluric noise
during the survey.
• No twin holes have been completed as the
drilling at Vuzel is still in the early stages
• All the assay results were received
electronically as an Excel spreadsheet,
along with the corresponding quality
certificates from the laboratory
• All data was incorporated in the database
by the database manager
• The access to the database is limited to
authorised employees
• The only adjustment of the assay data is
the replacement of the lower detection limit
of 0.01 ppm to the half of it – 0.005ppm Au
Page 17 of 23
ASX RELEASE | 22 September 2025
Criteria
JORC Code explanation
Commentary
• All data is received and stored securely in
digital format in the Company's database
• Final data is rigorously interpreted by
Raiden’s geoscientific personnel
•
Apex Engineering Geology &
Geophysics provided primary and
processed data for interpretation by
Ridge Consultants, Raiden’s
geological consultant for the Vuzel
Project. All data was supplied
electronically with secure data transfer.
• Location of
data points
• Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation
• Specification of the grid system used
• Quality and adequacy of topographic
control
• Raiden’s collars su
Share your feedback
Discover