New Multi-Kilometre Trends Expand Vuzel Gold Potential
Released
Released
Announcement PDF
ASX RELEASE | 11 May 2026
P 08 6158 9990
Suite 7, 63 Shepperton Road, Victoria Park, WA 6100
ABN 68 009 161 522
Page 1 of 16
NEW MULTI-KILOMETRE TRENDS
EXPANDS VUZEL GOLD POTENTIAL
HIGHLIGHTS
• Recently completed soil sampling and geological mapping has
defined a multi-kilometre arsenic in soil trend across the
southern and western areas at the Vuzel Gold Project,*
extending the exploration potential well beyond the
currently drilled central zone.
• The new arsenic-in-soil anomalism is closely associated with
similar gold anomalism, where positive drill results within the
central part of the Project that have been achieved to date.1,2,3,4
• The recently defined arsenic anomalies are:
o Significantly more intense than the arsenic anomalism
associated with currently defined gold mineralisation.
o Associated with interpreted new thrust faults and
structural features, which are considered prospective for
potential vertical feeder zones (Figure 1).
• Follow-up programs are underway to determine whether the
newly identified anomalies are associated with gold.*
• Permitting for drill access over the Silver Anomaly5
remains
ongoing.
• Results from initial metallurgical testwork targeting a simple,
cost-effective and gravity-focused processing flowsheet are
anticipated in the near term.
• Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here.
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to announce
an update on the status and work undertaken on the Vuzel Gold Project (“Vuzel”) in south-eastern
Bulgaria.
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “The field exploration
programs undertaken over the last few months have yielded very encouraging results and have
further increased the prospectivity of the Vuzel Gold Project. While permitting over the silver
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
& Company Secretary
Ms Kyla Garic
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
*Note: The arsenic-in-soil results reported in this announcement are based on field portable XRF analysis
and should be considered indicative geochemical results suitable for early-stage anomaly definition and
target generation. No new gold or silver assay results are reported in this announcement. Follow-up work,
including additional geochemical sampling and/or laboratory analysis where appropriate, is planned to
assess whether the newly defined arsenic anomalies are associated with gold mineralisation.
ASX RELEASE | 11 May 2026
Page 2 of 16
anomaly has been in progress, mapping and soil sampling programs have been undertaken to
determine the potential extent of anomalism across the Project.
Pleasingly, new multi-kilometre trends anomalous in arsenic have been defined in the southern and
western parts of the Project area. Notably, the levels of arsenic anomalism are significantly higher
than those observed in areas that have been drill tested to date. The arsenic anomalies are also
associated with structures and alteration zones that are consistent with those observed in the gold-
bearing areas in the central parts of the Project (drill tested zones).
On this basis, we believe Vuzel has the potential to deliver a larger mineralised footprint than has
been defined to date through current drill campaigns. Management is also progressing the
permitting on the historically defined silver anomaly at the Project.
We expect to receive the final metallurgical report from the service provider in the near term and
will inform the market once it has been received and interpreted. We will continue to deploy capital
on Vuzel in a disciplined manner, with a view to increasing the Project’s value and generating a
favourable outcome for the Company and its shareholders.”
NEWLY IDENTIFIED TRENDS FROM SOIL SAMPLING AND MAPPING PROGRAM*
A soil sampling and mapping program was undertaken across key geological contacts in the
southern and western parts of the Project area, in the proximity of the historically defined silver
anomalies. Samples were collected on a 50m x 50m grid and analysed using a hand-held XRF
device. The objective of the program was to test for pathfinder anomalism along the geological
contacts and to identify and delineate additional potential structures that have not been defined
to date.
As a result, a large, contiguous arsenic-in-soil anomaly has been delineated in association
with a newly interpreted structural contact, interpreted as a thrust fault. The anomaly
appears to be cross-cut by a series of north and north-east trending faults, which are considered
analogous to the high-grade feeder zones associated with higher-grade mineralisation and
alteration zones observed in the central part of the Project area.1,2,3,4
While the newly defined arsenic anomalies have not yet been tested for associated gold
mineralisation, follow-up work is planned in the coming months. In the central parts of the Project
area, the association between arsenic anomalism and gold mineralisation is well established. The
intensity of the newly defined arsenic anomalism, relative to that observed in the central zone,
together with its spatial correlation with the historically defined silver anomaly, provides further
encouragement to undertake follow-up work over these prospective areas.
Further programs are being planned to determine if gold mineralisation is associated with these
recently defined zones, as well as to evaluate other prospective parts of the project area.
*Note: The arsenic-in-soil results reported in this announcement are based on field portable XRF analysis
and should be considered indicative geochemical results suitable for early-stage anomaly definition and
target generation. No new gold or silver assay results are reported in this announcement. Follow-up work,
including additional geochemical sampling and/or laboratory analysis where appropriate, is planned to
assess whether the newly defined arsenic anomalies are associated with gold mineralisation.
ASX RELEASE | 11 May 2026
Page 3 of 16
Figure 1: Map of Vuzel project area and anomalies defined to date.
Note 1 – Central project area defined by historical artisanal mining, closely correlated gold in soil anomalies and positive
drill results is characterised by arsenic in soil anomalism (20 – 100ppm).
Note 2 – Historical silver anomaly, which is defined by an Ag-in-soil anomaly, where historical drilling and outcrop
sampling has confirmed high-grade silver mineralisation, is also associated with an arsenic in soil anomaly (100 – 300
ppm).
Note 3 – a significant arsenic in soil anomaly extending over an approximate 1-kilometre strike, which remains untested
for gold mineralisation to date (>300ppm).
Statistics on the soil samples collected:
Central area (25m by 25m and 50m by 50m grids) – 3,266 samples
Southern area (50m by 50m grid) – 885 samples
Western area (50m by 50m grid) – 1,223 samples
PERMITTING (SILVER ANOMALY)
As previously announced,5
Raiden initiated permitting procedures over the historically defined
silver anomalies at the Vuzel project. The initial permitting strategy comprised a number of
proposed drill pad locations situated on municipality-owned land parcels. These initial
applications were declined, as the relevant land parcels are currently subject to temporary third
party lease arrangements for alternative land-use purposes.
ASX RELEASE | 11 May 2026
Page 4 of 16
In response, the Company has re-initiated the permitting process over alternative, suitable land
parcels that are not presently under lease and fall under management of the Bulgarian Forestry
Department. Raiden anticipates that reviewed permit applications will be granted in due course.
Furthermore, the Company considers that, in the medium term, should initial drill testing from the
newly proposed drill pad locations return positive results, there may be an opportunity to obtain
access to the originally proposed drill pad locations as well.
PLANNED WORK
Further work is planned for calendar year 2026 with the objective of:
• Completing preliminary metallurgical studies aimed at demonstrating a simple, cost-
effective and gravity-focused processing flowsheet.
• Undertaking stream sediment sampling to assess the relationship between gold
mineralisation and arsenic anomalism across newly defined targets within prospective
areas on the Project.
• Mapping any newly anomalous zones.
• Completing permitting procedures over the historical silver anomaly and potentially over
the newly defined target areas.
• Potential drill testing of recently defined gold and silver targets.
VUZEL PROJECT BACKGROUND
Vuzel is an advanced gold exploration project located in south-eastern Bulgaria, East Rhodope
area, adjacent to the regional centre of Kardzhali town.
Modern exploration of the Vuzel property commenced between 1997 and 2000 (Gramex), when
following BLEG discovery of the Vuzel auriferous zone, geological mapping, rock-chip sampling,
soil sampling and 4 shallow drill holes were completed.
Dundee Precious Metals controlled the property between 2004 and 2006, when 25 shallow drill
holes were completed, testing peripheral anomalies in the western and southern periphery of the
Vuzel property.
In 2015 Ridge Minerals (via Vuzel Minerals EOOD) established a tender procedure for acquisition
of the Vuzel 26.5km2
exploration permit and on August 2018 Ridge was engaged by the Bulgarian
Ministry of Energy as a licence holder. Between 2020 and 2025 Raiden completed diamond drilling
of the central part of the mineralised zone along with mapping, geophysics, soil sampling and
trenching.
STRATEGIC VALUE OF VUZEL
The type of geology and setting at Vuzel is similar to that of the epithermal low sulphidation Ada
Tepe deposit, which was developed and mined by Dundee Precious Metals (TSX: DPM) only 30km
south-east of Vuzel (Figure 2). Vuzel is located <20km from Gorubso-Kardzhali A.D. (a Bulgarian
Mining company) gold processing facility6
, which is also a 30% partner of TSX-V Velocity Minerals
whose Bulgarian portfolio, including the Rozino deposit (583Koz@0.8g/t Au) was recently subject
of a US$59M7
acquisition by Türker Mining, a subsidiary of the Turkish conglomerate Türkerler
Holding.
ASX RELEASE | 11 May 2026
Page 5 of 16
Should exploration ultimately confirm a viable mineral resource, Raiden believes that the project's
proximity to third-party processing infrastructure and other deposits may provide potential
synergies, subject to further technical and economic assessments.
Figure 2 - Location of Vuzel project in Southern Bulgaria in relation to other operating and historical
mine and prospects.
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
We value your feedback and questions.
Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here.
ASX RELEASE | 11 May 2026
Page 6 of 16
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced in this release
1
ASX:RDN 6 July 2022 “Gold Discovery at Raiden’s Vuzel Project in Bulgaria”
2
ASX:RDN 19 May 2025 “Drilling Confirms Potential significant shallow Au System”
3
ASX:RDN 19 June 2025 “Potential epithermal feeder zone intersected at Vuzel”
4
ASX:RDN 1 July 2025 “High-Grade Feeder Zone Intersected at Vuzel Gold Project”
5
ASX:RDN 14 August 2025 “Vuzel Update Silver Anomaly Permit & IP Data Processing”
Other releases and material referenced in this release
6
https://velocityminerals.com/projects/overview/
7
TSXV: VLC 28 February 2025 Velocity Enters into Definitive Agreement to Sell All Bulgarian Assets
Competent Person's and Compliance Statement
The information previously released to the ASX and referenced in footnotes 1-5 above relate to exploration
results that have previously been released on the ASX. The Company confirms that it is not aware of any
information or data that materially affects the information included in the market announcements, and that
all material assumptions and technical parameters underpinning the announcements continue to apply. The
Company confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
The information in this announcement (including JORC tables) is based on and fairly represents information
and supporting documentation prepared, reviewed and approved by Mr Dimitar Dimitrov, a competent person
who is a member of the Australian Institute of Geoscientists (AIG), registration (number 4538). Mr Dimitar
Dimitrov is not employed by Raiden Resources Limited and acts as an independent contractor to the Company.
Mr Dimitar Dimitrov has sufficient experience that is relevant to the style of mineralisation and type of deposits
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 edition of the JORC Code. Mr Dimitar Dimitrov has provided his prior written consent as to the form and
context in which the exploration results and the supporting information are presented in this announcement.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
ASX RELEASE | 11 May 2026
Page 7 of 16
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or construction activities, and (vi) other risks
and uncertainties related to the Company’s prospects, properties and business strategy. Investors are
cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and the Company does not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or non-
occurrence of any events
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed base metal & gold exploration Company
focused on identifying and discovering significant and economically attractive mineral deposits. Driven by
a passion for unlocking discoveries that create shareholder value and the support of a strong corporate
treasury, Raiden is committed to achieving exploration success.
The Company’s portfolio of projects includes the Andover South lithium project. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara
region of Western Australia. In addition, the Company holds the rights to multiple projects in the emerging
and prolific Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant
exploration footprint in Bulgaria.
ASX RELEASE | 11 May 2026
Page 8 of 16
Table 1: JORC Code, 2012 Edition. Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
• Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used
• Aspects of the determination of
mineralisation that are Material to the
Public Report
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information
• Soil samples were collected on a 50 x
50 and 25 x 25 metre grids from the
B soil horizon. Samples were analysed
by an XRF instrument, which was
calibrated against industry standards
• The XRF instrument was regularly
calibrated against industry standard
blanks and standards
• The announcement does not relate to
any new gold or silver mineralisation
results
• Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether
core is oriented and if so, by what
method, etc)
• No drilling results are reported in this
announcement
• Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material
• No drilling results are reported in this
announcement
ASX RELEASE | 11 May 2026
Page 9 of 16
Criteria JORC Code explanation Commentary
• Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged
• No drilling results are reported in this
announcement
• Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling
• Whether sample sizes are appropriate
to the grain size of the material being
sampled
• The soil samples were not dried and
were analysed in the state which they
were collected in the field. The
samples were not split.
• The techniques used are considered
appropriate for the stage of
exploration which the project is in.
• The QAQC procedures are including
regular cleaning the sampling trowel
in the process of field sampling,
regular calibration and verification of
the XRF via Certificated Reference
Material (CRM), provided by the XRF
manufacturer
• Quality of
assay data and
laboratory
tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established
• Each sampling point is targeting the
sub-soil horizon “B”, below the
surface organic layer, but above the
underlying bedrock and parent
material
• About 30 grammes are sampled with
trowel, and packed in a clean,
labelled plastic bag.
• The sampled soil material is
measured in clean and secured field
core-shed, using portable X-ray
fluorescence (XRF) tool: Niton XL3t
GOLDD+, produced by Thermo
Fisher scientific
• The measurements are completed
via a single shot, lasting 30 seconds
in “Soil mode” measurement setting.
• Ultimately data is processed and
downloaded to MSExcel TM
ASX RELEASE | 11 May 2026
Page 10 of 16
Criteria JORC Code explanation Commentary
tabulations via relevant software
provided by the manufacturers.
• The QAQC procedures are including
regular cleaning the sampling trowel
in the process of field sampling,
regular calibration and verification of
the XRF via Certificated Reference
Material (CRM), provided by the XRF
manufacturer.
• The methodology and analytical
methods used are considered
appropriate for the stage of the
project.
• Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel
• The use of twinned holes
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols
• Discuss any adjustment to assay data
• No drilling results are reported in this
announcement
• XRF analysis data was collected by
the company’s consultants. The data
was exported into Excel, from where
the data was imported into a GIS
package and analysed. All the data is
backed up and stored on Raiden’s
data storage platforms.
• No adjustments were undertake in
relation to the presented data
• Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation
• Specification of the grid system used
• Quality and adequacy of topographic
control
• Soil sampling points were surveyed
by handheld GPS with an accuracy of
+/- 5m
• Co-ordinates are provided in WGS /
UTM Zone 35 N
• Data spacing
and
distribution
• Data spacing for reporting of
Exploration Results
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied
• Whether sample compositing has been
applied
• Soil sample collection was
undertaken on a 50 x 50 and 25 x 25
metre grid over areas which were
determined by the geologist in the
field
• No sample compositing has been
undertaken
• Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type
• If the relationship between the drilling
orientation and the orientation of key
• The soil samples were designed on a
50 x 50 and 25 x 25 metre grid.
Further work is required to determine
the exact controls on mineralisation
orientations.
ASX RELEASE | 11 May 2026
Page 11 of 16
Criteria JORC Code explanation Commentary
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material
• Sample
security
• The measures taken to ensure sample
security
• The sample chain of custody is
managed by Raiden
• The samples are stored in the core
storage facility, which is located in the
village of Stremci,
• Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data
• No reviews or audits have been
undertaken
Table 2: JORC Code, 2012 Edition. Section 2 – Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
• Mineral
tenement and
land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area
• Raiden Resources has a 75% interest
in the Vuzel project, which is in
Eastern Rhodope, Bulgaria, under an
earn-in and option to purchase
agreement with the holder of the
Vuzel project, Ridge Consultants
EOOD. Under the Agreement Raiden
has a right to earn in up to a 90%
interest, and an option to acquire a
100% interest in respect of the Vuzel
License
• The Vuzel Project does not fall within
the protected areas according to the
Article 5 of the Protected Areas Act,
as well as in special areas of
conservation part of the European
Ecological Network NATURA2000,
within the meaning of the Law on
Biological Diversity
• Important Archaeological object
“Ancient mine” is located in the Vuzel
area. Exploration activities around the
archaeological objects were
completed under the professional
supervision of Ministry of Culture
• Under the Bulgarian Law of Mineral
Resources, on expiration of the initial
three-year exploration period, the
holder of the exploration permit is
entitled to apply for an
extension/renewal of the exploration
license for a further 2-year period
ASX RELEASE | 11 May 2026
Page 12 of 16
Criteria JORC Code explanation Commentary
from the Bulgarian Ministry of Energy
(‘Ministry”). The license applicant is
required to meet the following
criteria in order for the Ministry to
grant the extension:
- Having completed the approved
work program within the 3-
year period;
- Final report on results of
geological explorations which
includes all types, scope and
results of performed
geological works over the
previous approved period of
exploration
- project of geological
exploration for the following
2-year period;
• Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties
• The Vuzel gold project is known as
one of the many ancient gold mining
areas in Rhodope Massive, active in
Roman and Byzantine times. Ancient
mining is presented by many adits,
shafts, small pits and mining dumps
over the central about 1sq km of the
Vuzel project area
• Modern exploration of the Vuzel
property commence by Gramex
between 1997 and 2000, when
following BLEG re-discovery of the
Vuzel auriferous zone, geological
mapping, rock-chip sampling, soil
sampling and 4 shallow drill holes
were completed
• Dundee Precious Metals controlled
the property between 2004 and 2006,
when 25 shallow drill holes were
completed, testing satellite anomalies
in the western and southern
periphery of the Vuzel property. The
most prospective central part of the
Vuzel auriferous zone remain
untested
• In 2015 Ridge Consultants initiate a
tender procedure for acquisition of
the Vuzel 26.5sq km exploration
permit and on August 2018 Ridge
was engaged by Bulgarian Ministry of
Energy as a license holder
ASX RELEASE | 11 May 2026
Page 13 of 16
Criteria JORC Code explanation Commentary
• Geology • Deposit type, geological setting
and style of mineralisation
• Vuzel gold project is located in the
Eastern Rhodope ore region of
southeast Bulgaria, which is a part of
the West Tethyan’s Eocene-Oligocene
continental magmatic and
metallogenic belt, extending around
500 km from Serbia to northwest
Turkey. The eastern segment of that
belt is dominated by the Rhodope
Massive, which consists of
Precambrian to Mesozoic
metamorphic basement and
Palaeogene post collisional magmatic
and volcano-sedimentary cover
• The metamorphic rocks of the
Rhodope basement consists of two
tectonostratigraphic complexes: a
gneiss migmatite and a variegated
complexes. The age of
metamorphism and collision is
interpreted as Cretaceous.
Volumetrically minor Upper
Cretaceous plutons intrude the
metamorphic basement
• The Rhodope metamorphic basement
is locally overlain by the
Maastrichtian-Palaeocene sin-
detachment Shavarovo sedimentary
formation (Kroumovgrad group)
which is overlain by Upper Eocene -
Lower Oligocene breccia
conglomerate, coal bearing
sandstone and marl-limestone
formations and a series of bimodal
rhyolite and basalt to basaltic
andesites volcanics and
volcaniclastics, intruded by Oligocene
diorite, gabbro diorite and
shoshonitic intrusions
• The geology of the Vuzel gold project
is dominated by a district Palaeogene
sin-tectonic sedimentary basin
within and above the metamorphic
basement. That basin is controlled by
east-west and northwest post
collisional extensional faults and is
filled by sedimentary rocks of the
Kroumovgrad, breccia-conglomerate
and coal bearing sandstone-
conglomerate units. These
ASX RELEASE | 11 May 2026
Page 14 of 16
Criteria JORC Code explanation Commentary
sedimentary units are the
predominant host of the outlined
Vuzel epithermal gold mineralisation.
The auriferous Palaeocene-Eocene
sedimentary rocks are overlain by the
Oligo
Share your feedback
Discover