New discovery and extensions to Ni-Cu Mineralisation
Released
Released
Announcement PDF
ASX RELEASE | 27 February 2025
NEW DISCOVERY AND EXTENSIONS TO NI-CU
MINERALISATION AT MT SHOLL
Highlights
•
10 RC holes testing extensions of existing nickel-copper-cobalt-Platinum
Group Element (“PGE”) mineralisation1 and new targets completed with
the following results:
A1 Deposit
•
Two drill holes confirm wide mineralisation at depth including:
o
24SHLRC005
63m @ 0.43% Ni+Cu, 148.45 ppm Co (PGE/Au analysis pending)A
o
24SHLRC010
47m@ 0.48% Ni+Cu, 174.11 ppm Co (PGE/Au analysis pending)A
Keel Target discovery, including:
o
24SHLRC006
43m @ 0.35% Ni+Cu, 136.35 ppm Co (PGE/Au analysis pending)A
B2 Deposit
•
Two drill holes confirm depth extensions of mineralisation, indicating
potential for resource expansion down-dip and to the west1. Notable
results include:
o
o
24SHLRC001
33m @ 0.28% Ni+Cu, 121.24 ppm Co (PGE/Au analysis pending)A and
38m @ 0.30% Ni+Cu, 145.18 ppm Co (PGE/Au analysis pending)A and
84m @ 0.24% Ni+Cu, 125.04 ppm Co (PGE/Au analysis pending)A
24SHLRC002
103m @0.22% Ni+Cu, 140.67 ppm Co (PGE/Au analysis pending)A
•
Results indicate potential for mineral resource expansion1
•
PGE and Au assays are pending and may further enhance results
•
All work financed by First Quantum Minerals Ltd (“FQM”) as part of the
MOU agreement2
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
SERBIA
Cu & Au
Downhole width is not equivalent to true thickness. Structural measurement and analysis of drill core is ongoing to establish the true
orientation of mineralisation
A
Page 1 of 16
ASX RELEASE | 27 February 2025
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “All drill holes in this
program targeted mineralisation outside of the currently defined mineral resource areas.
Compellingly, half of the drill holes have intercepted mineralisation which suggests potential
to increase the existing resource. This drilling has also identified new targets in the ‘Keel”
area, which had not been recognised to date. With PGE and Au assays still pending, we are
hopeful these results may add further value to the current drill intervals. Management is
pleased that our strategy of active exploration programs across the portfolio is delivering
results through joint ventures while also preserving our balance sheet for priority projects.”
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
report on the results from the recently completed Mt Sholl reverse circulation (RC) drilling
program.
First Quantum Minerals completed a total of 10 RC holes for 2,466m between 29 October
and 24 November 20242. The drilling program was designed to test geophysical
anomalies and mapped targets that may represent extensions to existing known
mineralisation3.
Page 2 of 16
ASX RELEASE | 27 February 2025
Figure 1: Mt Sholl Project Drillhole Location and Cross Section Plan1
The drilling program targeted the following:
Strike & Depth Extension to A1 Deposit
Hole 24SHLRC005 was drilled along strike to the northeast of the A1 deposit, targeting
an electromagnetic (EM) anomaly identified in an EM survey completed in April 2024 3.
The hole intersected the Mt Sholl intrusion approximately 300m downhole and also
intersected mineralisation that was thicker than expected, 63m @ 0.43% (Ni+Cu); 148.45
ppm Co & 1.12 g/t Ag from 309m to 372m, indicating thickening of the mineralised
zone in this area outside of the existing resource1.
Hole 24SHLRC010 was also drilled into the same target and intersected the Mt Sholl
intrusion approximately 260m down-hole and a significant zone of mineralisation,
totalling 47m @ 0.48% (Ni+Cu); 174.11 ppm Co & 1.02 g/t Ag from 265m to 312. The
Page 3 of 16
ASX RELEASE | 27 February 2025
hole was abandoned in mineralisation due to excessive water flow into the hole. Notably,
the 2 drill intercepts indicate that the mineralisation is open at depth and may be
widening.
Figure 2: Section Through A1 NE Extension Zone with new Drillholes1
The mineralisation styles intersected in the FQM holes included net-textured and
disseminated mineralisation within a predominantly gabbro host rock bounded by basalt
flows above and below the mineralisation. In some discrete areas an ultramafic unit, a
pyroxenite, has been logged and this also hosts disseminated sulphide mineralisation.
Sulphide mineralisation intersected has been predominantly fine grained pyrrhotite,
chalcopyrite and pentlandite occurring in all the mineralisation styles mentioned above.
Notably, PGE and Au analysis is still outstanding and if positive is anticipated to increase
the overall grade of the mineralised intervals. These results will be reported if they are
material.
Keel Target
The two RC holes were drilled into the Keel target, and is centred on a discrete magnetic
anomaly located between the B2 and Kudos deposits (Ref Fig.3). One of the holes drilled,
Page 4 of 16
ASX RELEASE | 27 February 2025
24SHLRC006, intersected shallow mineralisation totalling 43m @ 0.35% Cu+Ni; 136.35
ppm Co & 0.66 g/t Ag from 12m to 55m. This intersection is considered significant as
no previous mineralisation has been identified in this part of the Mt Sholl intrusion and is
a clear target for future exploration and opens up the intrusion to further models of
mineralisation not recognised to date.
Figure 3: Section Through Keel Zone with new Drillholes
Page 5 of 16
ASX RELEASE | 27 February 2025
B2 Deposit IP Anomaly
An Induced Polarisation (IP) survey was conducted at the B2 deposit by FQM in December
20233. This survey identified an anomaly at depth to the east of the existing
mineralisation1 at the B2 deposit. Two RC holes, 24SHLRC001 and 002, were drilled
targeting this anomaly and intersected Cu-Ni mineralisation down-dip of the current
resource (ref. Table1)1.
These results indicate that the B2 mineralisation has not been closed-off by previous
drilling and highlight the potential for further resource extensions to the B2 deposit, both
down-dip and along strike.
Figure 4: Section Through B2 Deposit with recent drill hole in relation to mineral resource 1
Page 6 of 16
ASX RELEASE | 27 February 2025
Figure 5: Section Through B2 Deposit with recent drill hole in relation to mineral resource1
Table1: Drillhole Assay Intercepts*
Prospect
Hole ID
From
(m)
To
(m)
Interval
(m)
Ni
%
Cu
%
Co
ppm
Pd
g/t
Pt
g/t
Au
g/t
Ag
g/t
Ni+Cu%
>=0.1
B2
B2
B2
B2
24SHLRC001
24SHLRC001
24SHLRC001
24SHLRC001
2
15
51
93
8
48
89
177
6
33
38
84
0.15
0.18
0.22
0.17
0.17
0.10
0.08
0.07
112.17
121.24
145.18
125.04
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
0.81
0.71
0.4
0.4
0.32
0.28
0.3
0.24
B2
B2
Kudos
A1
A1
Keel
24SHLRC002
24SHLRC002
24SHLRC003
24SHLRC004
24SHLRC005
24SHLRC006
23
130
126
151
103
21
N/A
N/A
N/A
N/A
0.16
0.75
0.22
0.29
309
12
372
55
63
43
0.19 0.03 140.67 N/A
0.16 0.13 104.67 N/A
No significant intersection
No significant intersection
0.22 0.21 148.45 N/A
0.22 0.13 136.35 N/A
N/A
N/A
N/A
N/A
1.12
0.66
0.43
0.35
Keel
Ballast
Ballast
A1
24SHLRC007
24SHLRC008
24SHLRC009
24SHLRC010
47
No significant intersection
No significant intersection
No significant intersection
0.27 0.21 174.11 N/A
N/A
N/A
1.02
0.48
265
312
*Intercepts reported above a cutoff grade of 0.1% (Ni+Cu), over a minimum of 2m
Page 7 of 16
ASX RELEASE | 27 February 2025
Mt Sholl Cu-Ni-PGE Project Overview
The consolidated tenements are located 22 kilometres southeast of Karratha and 10
kilometres northeast of the mothballed Radio Hill mine in the Pilbara region of Western
Australia, covering a total land area of 42km2.
The tenements are underlain by Paleoarchean greenstone rocks, primarily basalt, and part
of the Mesoarchean Mount Sholl layered mafic-ultramafic intrusive complex. The
consolidated tenements host several Ni-Cu-Co-PGE deposits, with mineralisation occurring
as disseminated, matrix, stringer and rare massive pyrrhotite-pentlandite-chalcopyrite. High
pyrrhotite content in ore means that Ni-Cu mineralisation in the intrusion across the
consolidated tenements could be associated with discrete magnetic highs.
Extensive work on the properties targeting Ni-Cu-Co-PGE mineralisation was conducted by
a number of companies from the early 1970’s through to 2016. Exploration programs
included the collection of surface samples (soil, auger and rock), airborne geophysics
(magnetics, EM) and drilling (RAB, RC and diamond).
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced in this release
ASX:RDN 29 March 2023 Open Pit Mineral Resource Estimate and Significant JORC Exploration Target
Defined for Mt Sholl Project
1
2
ASX:RDN 13 December 2023 Raiden enters strategic partnership with FQM at Mt Sholl
3
ASX:RDN 21 February 2024 IP Survey indicates significant Ni-Cu-PGE upside potential
Page 8 of 16
ASX RELEASE | 27 February 2025
Competent Person's Statement and Compliance Statement
The information referenced in the announcements footnoted above that relate to exploration results have
previously been released on the ASX. The Company confirms that it is not aware of any information or data that
materially affects the information included in the market announcements, and that all material assumptions and
technical parameters continue to apply. The Company confirm that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcements .
The information in this announcement that relates to exploration results is based on and fairly represents
information and supporting documentation prepared by Mr Sean Halpin, a competent person who is a member
of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin is employed by Raiden Resources Limited. Mr
Sean Halpin has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
edition of the JORC Code. Mr Sean Halpin has provided his prior written consent as to the form and context in
which the exploration results and the supporting information are presented in this announcement.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited. (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South, Mt Sholl and Arrow lithium projects. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region
of Western Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria. The Directors believe the Company is well positioned to unlock value from this
exploration portfolio and deliver a significant mineral discovery.
Page 9 of 16
ASX RELEASE | 27 February 2025
Appendix 1: Tenement Schedule
Tenement
E47/3468
E47/4309
E47/3339
E47/3181
P47/1762B
P47/1787
P47/1788
P47/1789
P47/1790
P47/1791
P47/1792
P47/1793
P47/1794
P47/1795
M47/1651
Holder
Pilbara Gold
Corporation Pty
Ltd
(Raiden
Resources Ltd.’s
100% owned
subsidiary)
Grant Date
Expiry
Area
12/09/2017
24/07/2020
14/09/2016
13/08/2015
01/09/2016
24/01/2017
24/01/2017
24/01/2017
30/11/2018
02/08/2018
02/08/2018
30/11/2018
30/11/2018
30/11/2018
Application
pending
11/09/2027
23/07/2025
13/09/2026
12/08/2025
31/08/2024
23/01/2029A
23/01/2029A
23/01/2029A
29/11/2026
01/08/2026
01/08/2026
29/11/2026
29/11/2026
29/11/2026
1Bl
2Bl
1Bl
5Bl
139 Ha.
188 Ha.
200 Ha.
148 Ha.
197 Ha.
177 Ha.
193 Ha.
197 Ha.
157 Ha.
146 Ha.
RDN
Equity %
100%
100%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
Comment
Covered by the NAC
Heritage Agreement
Conversion of
P47/1762
A: Retention status granted 10 Feb 2024
B: Application to convert to M47/1651
Appendix 2: List of drilled holes at the Mt Sholl Project referenced in this announcement
Prospect
Hole ID
MGA94_Z50 E
MGA94_Z50 N
RL
Dip
Azimuth
Total Depth
(m)
B2
24SHLRC001
487963
7685699
76.3
-75
300
235
B2
24SHLRC002
488313
7686194
62
-75
300
192
Kudos
24SHLRC003
491731
7687037
50
-70
180
330
A1
24SHLRC004
492125
7687174
49
-70
180
222
A1
24SHLRC005
492672
7687494
44.4
-70
180
402
Keel
24SHLRC006
490810
7686622
99
-80
240
318
Keel
24SHLRC007
490736
7686704
104.6
-75
170
144
Ballast
24SHLRC008
491463
7685933
61.4
-70
115
156
Ballast
24SHLRC009
491436
7685937
61.3
-80
330
155
A1
24SHLRC010
492614
7687432
46.2
-70
165
312
Page 10 of 16
ASX RELEASE | 27 February 2025
Table 2: JORC Code, 2012 Edition.
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to
the Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Page 11 of 16
Commentary
•
•
•
•
•
Standard reverse circulation holes were sampled at nominal 2m
intervals within the target intrusive rocks, reducing to 1m in and
adjacent to better-developed mineralisation.
Holes that did not intersect the target intrusive suite were subject to
2m composites sampled on 10m intervals or geological boundaries.
RC samples were submitted to ALS for preparation and assay; all
assay results have been received.
Industry-standard reverse circulation (RC) drilling was completed.
Drill holes were angled.
• The bulk RC samples were visually assessed and considered to be
representative with good recovery and consistency of both collected
sample and reject sample size.
• Very few of the holes encountered water, with limited impact on
sample recovery.
• Sample return was generally very good with no significant variance in
sample size observed.
ASX RELEASE | 27 February 2025
Criteria
JORC Code explanation
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Page 12 of 16
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
Commentary
•
Sample size is not considered to have had a material impact on grade.
•
Chip samples were logged lithologically for all drillholes, with chip
trays collected and filled at 1m intervals.
•
Magnetic susceptibility measurements were collected at 1m intervals
downhole using a handheld magnetic susceptibility meter on bulk
sample pile.
•
Geotechnical information was not ascertained from the chip samples.
•
•
•
Chip trays were photographed
Logging is qualitative in nature
Samples were collected via a rotary splitter attached to the drill rig
cyclone which was checked and cleaned regularly during drilling to
minimise cross-contamination of samples
•
•
Samples were submitted to ALS Geochemistry Perth as dry samples.
Field duplicates were produced from homogenised bulk sample of
identical downhole metre.
The sample sizes and sampling methods are considered appropriate
for the style of mineralisation at the project.
Commercial laboratories followed standard procedures for sample
preparation to produce sub-samples for analysis.
Sample size is considered appropriate to the grin size of the material
being sampled
•
•
•
•
•
•
Samples were transported to ALS Geochemistry in Perth for sample
preparation using method PREP-31; multielement assay was
conducted at ALS Geochemistry in Perth using ME-MS61, with select
intervals also assayed for Pd, Pt, Au using PGM-ICP23.
Certified Reference Materials (CRM or standards) and blanks, as well
as field duplicates, were inserted at the rates one every 20m sampled
to assess the assaying accuracy of the external laboratories.
Standards, blanks, and duplicates have also been used by the
ASX RELEASE | 27 February 2025
Criteria
JORC Code explanation
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Verification
of sampling
and assaying
Location of
data points
Data spacing
and
distribution
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
Commentary
•
•
•
Significant intercepts have been verified by representatives from
Raiden Resources and FQMEA.
No drillholes were twinned as part of this drilling program being
reported.
• Primary data are stored, documented and verified in industry
standard ways considered appropriate by the Competent Person.
• Assay data are as reported by ALS and the Competent Person has
verified these data and confirms that the data have not been adjusted
in any way.
• Remnant assay pulps are stored by ALS for 2 months or until
authorised for disposal
•
•
•
•
•
•
•
•
Page 13 of 16
laboratory for their internal QAQC procedure.
No laboratory audits were undertaken.
Drillhole locations were recorded using a handheld GPS.
Co-ordinates are provided in the Geocentric Datum of Australia
(GDA94).
A Reflex Omni X-42 North Seeking Gyro was used for a continuous
downhole survey at end of each drillhole.
Drillhole spacing is variable.
Drilling samples were collected at a range of intervals up to 2m.
Outside of target intrusive rocks sampling was conducted as 2m
composites at 10m intervals or geological boundaries.
Current reporting is for progressive exploration results and not for
Mineral Resource or Ore Reserve estimation.
No samples were composited.
ASX RELEASE | 27 February 2025
Criteria
JORC Code explanation
Commentary
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported if
material.
•
Sample
security
• The measures taken to ensure sample security.
•
For the current drilling the sample chain of custody was managed by
FQM staff. All samples were collected in the field at the project site in
number-coded calico bags/secure labelled polyweave sacks by
geological and field personnel. All samples were delivered directly to
the associated carrier, RGR Road Haulage, by FQM personnel before
being transported to the ALS laboratory in Perth WA for final
analysis.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
•
No reviews or audits have been undertaken.
•
Drillholes were oriented to result in approximately perpendicular
penetration of the projected lodes.
No known sampling bias was introduced because of the drill
orientation.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
Page 14 of 16
Commentary
•
•
•
•
Raiden Resources Ltd tenements are located in the City of Karratha,
within the Pilbara region of Western Australia.
The tenements are held by either by Raiden Resources Ltd 100%, or
Raiden Resources Ltd 80%/Welcome Exploration Pty Ltd 20%. (see
Appendix 1: Tenement Schedule for further detail).
Tenements are located on the Mt Welcome pastoral lease.
Raiden is not aware of any existing impediments nor of any potential
impediments which may impact ongoing exploration and development
activities at the project site.
ASX RELEASE | 27 February 2025
Criteria
JORC Code explanation
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other parties.
Geology
• Deposit type, geological setting and style of mineralisation.
•
•
Magmatic Ni-Cu-PGE and orogenic gold mineralisation.
Paleoarchean greenstone rocks intruded by Mesoarchean maficultramafic intrusive complex associated with widespread disseminated to
matrix and stringer pyrrhotite-pentlandite-chalcopyrite mineralisation.
Mesoarchean mylonite in the Sholl Shear Zone north of the property,
with lode gold mineralisation in related subsidiary structures.
Drill hole
Information
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract
from the understanding of the report, the Competent Person
should clearly explain why this is the case.
•
Drillhole data are tabulated in the body of the announcement.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be
stated.
• Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
•
Mineralization was defined using composites of 2 meters with a
maximum internal dilution of 2 meters. Intercepts were reported where
the combined Ni+Cu content was equal to or greater than 0.1%.
Within the obtained intercepts, the weighted average grade was
calculated
No top-cut was applied, and no metal equivalent values were reported.
Page 15 of 16
Commentary
•
•
•
•
A full search and compilation of historic exploration has been
completed.
Work included stream sediment, soil and rock sampling, geological
mapping, geophysical surveys, drilling, resource estimation and mining
studies.
ASX RELEASE | 27 February 2025
Criteria
JORC Code explanation
Commentary
typical examples of such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Relationship
between
mineralisatio
n widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
•
Intercepts are quoted as downhole lengths; holes were oriented roughly
perpendicular to mineralisation but the true width is not known.
Diagrams
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
•
Maps are included in the body of the announcement.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting
of Exploration Results.
•
All results associated with the drilling program being reported have
been included
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
g
Share your feedback
Discover