Andover South preliminary structural interpretation
Released
Released
Announcement PDF
ASX RELEASE | 27 September 2024
ANDOVER SOUTH LITHIUM PROJECT
PRELIMINARY STRUCTURAL INTERPRETATION
Highlights
ASX CODE: RDN
•
District scale structural interpretation of Andover Complex
completed
•
Detailed evaluation of magnetic survey data over Andover South
Project completed
•
Preliminary evaluation indicates that the mineralisation within
the district:
o
is hosted exclusively within the ultramafic units of the
Andover Complex
o
is hosted within a well-defined north-east trending
structural corridor
o
appears to be hosted within the footwall of a second order
structure within the broader NE trending structural
corridor
o
appears to be confined to the vicinity of the second order
structure
o
•
•
is offset by post-emplacement structures
Next steps will be to refine the geological boundaries of the
Andover Complex within the boundaries of the Company’s
project area, followed by undertaking a detailed exercise to
define potential blind targets (under sediment cover), on the
basis of the detailed magnetic data at Andover South project.
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
AUSTRALIA
Au, Cu, Ni & PGE
Drilling scheduled to commence on the weekend Company will provide a formal update on Monday
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
announce that it has completed a preliminary structural analysis using magnetic data
captured from a drone survey in July 2024, along with publicly available magnetic
Page 1 of 13
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 27 September 2024
geophysical data over the Andover Complex for its Andover South Lithium Project, located
in the Pilbara region of Western Australia.
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “We undertook this
exercise with the objective of understanding the district scale structural setting and the
relationship between the observed mineralisation at Andover South to the setting of the
Andover Deposit, which is located to the north-east of our target area. The district scale controls
on mineralisation, inferred from this exercise will assist us to plan and refine our analysis on
an ongoing basis with the aim of defining further target areas and aligning our planned
exploration activities through the entire project area.”
Structural Interpretation
The Company has conducted a structural interpretation of the Andover South Lithium Project
area and the Andover Complex using magnetic data captured from a drone survey
conducted in July 2024 over E47/4062 and E47/4061 (Andover South Project), together with
publicly available magnetic data for the Andover Complex. The objective of the exercise was
to:
-
evaluate the district scale setting of the Andover South target in relation to the district
scale structural framework in relation to the Andover deposit1 and to identify the main
mineralisation trends in this context
-
Identify the target level structures associated with known outcropping mineralisation and
determine their extent and nature within the project area
-
Understand post mineralisation structural offsets in order to take these into account
during the planned drilling program
-
Execute a targeting exercise to identify similar structural and geological trends within the
project area, which may have the potential to host further mineralisation (ongoing).
The preliminary interpretation has identified that that the pegmatites at Andover South on
E47/4062 and E47/4061 appear to be hosted within the same structural North-East trend,
which hosts mineralised lithium pegmatites of Azure Minerals Limited Andover Project,
located on the adjacent tenement. Furthermore, in both instances, the mineralisation defined
to date appears to be associated with second order north-east and north-north-east striking
faults, which are further displaced by post mineralisation faulting. The analysis suggests that
the extent of the currently defined mineralisation seems to be confined to the proximity to
these second order faults and where, in the case of Andover South project, the K/Rb ratios
Page 2 of 13
ASX RELEASE | 27 September 2024
analysis2,3 indicates that the fractionation of the pegmatites (including the probability to host
economic lithium mineralisation) decreases with increased distance from these faults.
It should be noted that this is a preliminary interpretation, which will mature and may change
with the ongoing work the Company is undertaking on the project.
We will be undertaking further targeting work on the basis of this data processing and
interpretation, in an attempt to define further structural trends that may have the potential
to host pegmatite mineralisation.
Figure 1: Andover South Project location and the preliminary structural interpretation of the
Andover Complex, in relation to currently defined mineralisation at Andover South target and the
Andover Deposit 1-15
The Company plans to commence with drilling activities over the weekend, barring any
unforeseen weather events. The Company will provide a status update on Monday 30 of
September.
Page 3 of 13
ASX RELEASE | 27 September 2024
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
Page 4 of 13
ASX RELEASE | 27 September 2024
ASX Announcements referenced to directly in this release
ASX:AZS 13 June 2023 Exceptional lithium drill Intersections from Andover
ASX:RDN 22 December 2023 Independent analysis confirms five new zones at Andover
3
ASX:RDN 23 September 2024 Mapping confirms new high-priority target zone at Andover
4
ASX:AZS 20 June 2023 Broad high-grade lithium intersections continue at Andover
5
ASX:AZS 30 June 2023 More broad high-grade lithium intersections at Andover
6
ASX:AZS 14 July 2023 More +100m lithium intersections returned at Andover
7
ASX:AZS 4 August 2023 209m High-grade lithium intersection at Andover
8
ASX:AZS 21 August 2023 Drilling delivers large volumes of lithium mineralisation at Andover
9
ASX:AZS 18 September 2023 Andover deliver more outstanding lithium results
10
ASX:AZS 10 October 2023 Substantial spodumene-rich pegmatites drilled at target Area 3
11
ASX:AZS 15 November 2023 Extensive high-grade lithium confirmed at target Area 3
12
ASX:AZS 30 November 2023 The Andover Lithium Project Exploration Success to Project
13
ASX:AZS 22 December 2023 World-class lithium intersections continue at Andover
14
ASX:AZS 13 February 2024 More very impressive lithium intersections from Andover
15
ASX:AZS 20 March 2024 Andover lithium system continues to grow
1
2
The information in the referenced announcements 2 & 3 footnoted above that relate to Exploration Results has
previously been released to the ASX. The Company confirms that it is not aware of any information or data that
materially affects the information included in the market announcements, and that all material assumptions and
technical parameters underpinning the announcements continue to apply. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcements.
Competent Person's Statement
The information in this announcement that relates to exploration results (Including JORC Tables) is based on and
fairly represents information and supporting documentation prepared, reviewed and approved by Mr Sean Halpin,
a competent person who is a member of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin is employed
by Raiden Resources Limited. Mr Sean Halpin has sufficient experience that is relevant to the style of
mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 edition of the JORC Code. Mr Sean Halpin has provided his prior written
consent as to the form and context in which the exploration results and the supporting information are presented
in this announcement.
Appendix
Table 1: Tenement Schedule
Tenement
E47/4061
E47/4062
E47/4063
E47/3849
P47/2028
E47/4603
Page 5 of 13
Holder
Pilbara Gold Corporation
Pty Ltd
(Raiden Resources Ltd.’s
100% owned subsidiary)
Grant Date
Expiry
06/08/2019 05/08/2029
30/08/2024 29/08/2029
04/04/2019 03/04/2029
16/07/2018 15/07/2028
Application
Application
Area
1Bl
2Bl
2Bl
1Bl
23.5 Ha.
7Bl
RDN
%
80%
80%
80%
80%
80%
100%
ASX RELEASE | 27 September 2024
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited . (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South, Mt Sholl and Arrow lithium projects. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region
of Western Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 6 of 13
ASX RELEASE | 27 September 2024
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
• A drone magnetic survey was conducted by Atlas
Geophysics over E47/4062 and E47/4061 in July 2024,
using an IPAS-HE Rotary Wing drone.
• The magnetic sensor was a Scintrex CS-VL cesium
vapour magnetometer
• Lines spaced 25m apart were completed with a mean
terrain clearance of 25m.
• Lines were oriented 090-270 degrees (grid east-west)
• The data captured was used in the structural
interpretation mentioned in the body of this
announcement.
• Data review, QAQC and modelling was conducted by
Southern Geoscience Consultants in Perth, Western
Australia.
Drilling
techniques
Drill sample
recovery
Page 7 of 13
• In relation to this announcement no drilling has been
conducted as yet and no assays are being reported
• In relation to this announcement no sampling has been
conducted as yet and no assays are being reported
ASX RELEASE | 27 September 2024
Criteria
JORC Code explanation
Logging
• Whether core and chip samples have been geologically and
• In relation to this announcement no drilling has been
geotechnically logged to a level of detail to support appropriate
conducted as yet.
Mineral Resource estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core
• Not applicable
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
Sub-sampling
techniques
and sample
preparation
Quality of
• The nature, quality and appropriateness of the assaying and
assay data and
laboratory procedures used and whether the technique is considered
laboratory
partial or total.
tests
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Page 8 of 13
Commentary
•
Not applicable
ASX RELEASE | 27 September 2024
Criteria
JORC Code explanation
Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Not applicable
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Co-ordinates are provided in the Geocentric Datum of
Australia (GDA94) Zone 50.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
• Not applicable
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• Not applicable
Sample
security
• The measures taken to ensure sample security.
• Not applicable.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
• Not applicable
Page 9 of 13
ASX RELEASE | 27 September 2024
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• Tenements are located in the City of Karratha,
within the Pilbara region of Western Australia.
• The tenements are held by either by via Raiden
Resources Limited’s subsidiary Pilbara Gold
Pty Ltd 80% and Welcome Exploration Pty
Ltd 20%.
• All tenements other than P47/2028 and
E47/4603, which are in the application stage,
are granted tenure (refer to the above table)
• Tenements are located on the Mt Welcome
pastoral lease.
• The Company is not aware of any existing
impediments nor of any potential impediments
which may impact ongoing exploration and
development activities at the project sites.
Exploration done by
other parties
• Acknowledgment and appraisal of exploration by other parties.
• A search and compilation of historic
exploration has been completed.
• Work included stream sediment, soil and rock
sampling, geological mapping, and
geophysical surveys.
Geology
• Deposit type, geological setting and style of mineralisation.
• Potential for lithium-caesium-tantalum bearing
pegmatite mineralisation.
• Mt Sholl Project geological setting paleoarchean greenstone rocks intruded by
Mesoarchean mafic-ultramafic intrusive
complex associated with widespread
disseminated to matrix and stringer pyrrhotite-
Page 10 of 13
ASX RELEASE | 27 September 2024
Criteria
JORC Code explanation
Commentary
pentlandite-chalcopyrite mineralisation.
Mesoarchean mylonite in the Sholl Shear Zone
north of the property, with lode gold
mineralisation in related subsidiary structures.
• Roebourne Project geological setting –
previous explorers considered the area to be
part of the Ruth Well Formation (Mafic and
ultramafic volcanic and intrusive rocks; minor
chert; metamorphosed), however this new
interpretation shows that the rocks of the
Andover Intrusion/Complex (Archean-age
mafic-ultramafic intrusion) extend under cover
further to the north than previously suggested.
• It is further interpretated that the source of
mineralising fluids for the lithium pegmatites
are sourced from nearby felsic intrusive
bodies, these being the Black Hill Well
Monzogranite for the Roebourne Project, and
the Cleland Supersuite rocks for the Mt Sholl
Project area.
Drill hole
Information
Page 11 of 13
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
• Not applicable
ASX RELEASE | 27 September 2024
Criteria
JORC Code explanation
Commentary
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
Data aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• Not applicable
Relationship
between
mineralisation
widths and intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Not applicable
Diagrams
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Maps are included in the body of the
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• All historic results are reported as they have
been released to the ASX by the previous
companies.
• In relation to this announcement no sampling
has been conducted and no assays are being
Balanced reporting
Page 12 of 13
announcement.
ASX RELEASE | 27 September 2024
Criteria
JORC Code explanation
Commentary
reported
Other substantive
exploration data
Further work
Page 13 of 13
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk samples
– size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
• The underlying aeromagnetic data that forms
the basis for the structural reinterpretation of
the Andover Complex rocks, as described in
the body of the announcement, was sourced
from open file GSWA data available through
the MAGIX system at:
https://geodownloads.dmp.wa.gov.au/downloa
ds/geophysics/72204/WA_Magnetics_40m/
• Raiden are in the final stages of planning a
drilling program to further assess the potential
of the lithium-bearing pegmatites over its
Andover South Project on E47/4062.
Share your feedback
Discover