ASX RELEASE | 13 JANUARY 2025
FINAL ASSAY RESULTS FROM ANDOVER SOUTH
MAIDEN DRILLING PROGRAM
Highlights
•
•
28 diamond drill holes totalling of 7,041m of drilling were
completed under maiden program at Andover South
ASX CODE: RDN
Maiden drilling defined two distinct pegmatite systems:
DAX CODE: YM4
➢ North-West trending system (Target Area 6 & 7) and
➢ East - West trending system (Target Area 1,2,3,4)
•
•
•
1
High grade mineralisation (>2% Li2O) , associated with the
East-West striking system in target areas 1 and 2
Li2O mineralisation not identified within current assay result
on Target Area 7
Drill core observations and magnetic data suggest
mineralisation intercepted in Target Area 1,2,3 and 4 may
represent the periphery of a larger, untested system located
south of the drilled area (‘Southern Corridor target’).
Significant ResultsA
-
ASDD019 6.23m @ 1.16 Li2O%
-
ASDD022 4.56M @ 1.16 Li2O%
Further Targeting and Plans
•
Structural and geological evaluation of data to be
undertaken to assist in defining future drilling across
Andover South
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
•
Evaluation of the large pegmatite outcrop on tenement
E47/4061 and potential drill testing (part of “Southern
Corridor” target)
•
Evaluation of the ‘Southern Corridor” target area
•
Field mapping across Andover North to prioritise areas for further targeting to be
undertaken in Q1
Downhole width is not equivalent to true thickness. Structural measurement and analysis of drill
core is ongoing to establish the true orientation of the pegmatite.
A
Page 1 of 21
ASX RELEASE | 13 JANUARY 2025
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) provides the
assay results from the maiden diamond drilling program at its Andover South Lithium
Project, located in the Pilbara region of Western Australia.
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
"The large pegmatites intercepted at the initial drilling on Target Area 7 have not yielded
high grades. Encouraging outcomes from the initial drilling is confirmation that these large
pegmatites are present and pegmatites associated with relatively high grades in Target
Areas 1 and 2. However, the ideal combination of width and grade was not discovered in
this maiden drilling campaign.
Encouragingly, the presence of high-grade mineralisation within pegmatites on Target Area
1 and 2 was confirmed. Follow up drilling will concentrate on pinpointing the structural
corridors that are likely to host significant pegmatites, potentially linked to the same system
as Target Areas 1 and 2, where high Li2O grades have been established.
The maiden campaign prioritised the most obvious, outcropping targets, where we could
establish high grade mineralisation. The program results have established that these targets
may not be the main structure. We will be using these results to establish where the main
targets may be located under the sediment cover.
A key focus moving forward will be the ‘Southern Corridor target,’ a new structural target
identified through magnetic interpretations and significant outcrops on tenement E47/4061,
as well as interpretations from the maiden drilling program. This target may represent the
primary structural framework from which the mineralisation in Target Area 1, 2, and 3 is
derived, and which may have the potential for larger, mineralised pegmatite emplacement.
This target could not be drill tested during the last campaign, as the ground has not been
cleared as part of the initial aboriginal heritage survey. The team will be advancing these
surveys as soon as we are able to narrow into potential drilling areas through the upcoming
field work.
Simultaneously, we will advance our targeting work at Andover North, where we anticipate
to generate additional targets. As the geological team refine targets at both Andover North
and South the Company awaits results from the drilling campaigns conducted by Joint
Venture partners at the Arrow gold project and the Mt Sholl copper project."
Drill program Summary
A total of 7,041 metres across 28 drill holes have been completed on the project to date.
The assays for all samples have been received and analysed. On the basis of the results to
date, two pegmatite systems have been defined. The pegmatite system within target area
Page 2 of 21
ASX RELEASE | 13 JANUARY 2025
7 is hosted within mafic and ultramafic units, while the pegmatites within target Areas 1,2
and 3 are hosted within an unaltered gabbro host unit.
All assays have been received for the remaining 16 diamond drillholes completed in late
2024 as part of the maiden diamond drilling program. Results for the first 12 holes were
released to the market on 26 November 2024.1
Figure 1: Andover South Project In relation to Andover Deposit
Page 3 of 21
ASX RELEASE | 13 JANUARY 2025
Figure 2: Drilling Target Areas and locations1,2
Target Area 7 Results
As previously reported2, Target Area 7 is located on the western side of tenement
E47/4062 (Refer Figure 2), where a pegmatite-bearing zone outcrops along an 800m
north-west strike extent and is interpreted to dip to the northeast. The pegmatites in
Target Area 7 are hosted predominantly within a foliated meta-ultramafic rock and very
coarse-grained biotite schist, in contrast to the massive gabbro host of the pegmatites in
Target Areas 1, 2 and 3.
A total of four diamond drillholes were completed in Target Area 7 and all intersected
multiple pegmatites. No significant mineralisation was encountered within the pegmatites
in this zone. Further potential for mineralisation may exist further to the south along strike
of the area tested to date and will be investigated in future field programs.
Page 4 of 21
ASX RELEASE | 13 JANUARY 2025
Target Areas 1 and 2 Results
Out of the 23 drill holes completed in Target Area 1 and 2, all intersected pegmatites that
range in thickness from <1m up to 15m in width. The pegmatites in this area dip at a very
shallow angle to the north; strike east-west and are hosted within massive and structurally
undisturbed gabbro. Pegmatite intersections at depth point to a potential stacked system
with the potential for repetitions at depth (Refer Figures 3 and 4).
One drill hole in this area, ASDD026, was drilled in Target Area 3 on E47/4061 to test for
pegmatite to the north of the hole collar. This hole did not intersect any significant
pegmatites.
The nature of pegmatite mineralisation intersected in target areas 1, 2 and 3 appears to
be hosted within an extensional zone of a structural framework (no major structures or
alteration zones were identified), and where the main structure has not been intercepted
to date. Ongoing modelling and evaluation suggests that the larger structure may be
located south of the currently defined trend (‘Southern Structural Trend”).
Page 5 of 21
ASX RELEASE | 13 JANUARY 2025
Figure 3: Cross section A-B
Page 6 of 21
ASX RELEASE | 13 JANUARY 2025
Figure 4: Cross section N-S
Discussion and Planned Future Activities
The results highlight that in general the E-W to ENE striking pegmatites of Target Area 1
and 2 that are associated with modelled NE-striking fault zones are the focus of the more
significant lithium mineralisation on the tenement and are located in a similar structural
setting to those of the Andover Deposits of Azure Minerals on the adjacent tenure3. This
contrasts with the thicker, but more weakly lithium-mineralised NW-striking pegmatites
of Target Area 7.
This observation will be incorporated into the exploration strategy going forward, where
the structural targeting exercise conducted in 20243 indicated several structural targets
areas in the southern and eastern parts of E47/4062 and the adjacent E47/4061 tenement,
which remain to be tested (Refer Figure 5).
Page 7 of 21
ASX RELEASE | 13 JANUARY 2025
Southern Structural Corridor
Further targets defined through the analysis of magnetic data may represent the main
structural corridor, which is located along the geological boundary south of the drill tested
Target Areas 1 and 2. As these areas are mainly covered sediment cover, it is not possible
to map the pegmatites in outcrop (except for outcrops in tenement 4061). The target has
been prioritised on the basis of the following assumptions:
-
-
The zone follows, what is interpreted to be a geological boundary (on the basis
of magnetic data imagery). These zones are often associated with major
structural corridors, which in turn have the potential to be permissive for
emplacement of larger pegmatites
Magnetic data highlights numerous anomalies along the trend
On tenement E47/4061, a large pegmatite outcrop may represent the northern
exposure of this zone
Nature of the pegmatites on target Areas 1 and 2 appear to be extensional in
nature and potentially related to a proximal, larger system
The orientation of the interpreted structural corridor is similar to the structures
which host the Andover deposit
Exploration activities, including float mapping and outcrop sampling is planned across
this structural corridor.
Page 8 of 21
ASX RELEASE | 13 JANUARY 2025
Figure 5: Interpreted Structural Target Areas E47/4062 and E47/4061
Tenement E47/4061 Pegmatites
Only a single drill hole was completed on tenement E47/4061 on the south-western
corner of the tenement. This hole did not intersect any significant structures and is
believed to be an extension of the Target Areas 1 and 2, which are likely extensional in
nature. On the basis of the magnetic interpretation of Andover South, the large pegmatite
outcrop on the south-eastern corner of the tenement may be the expression of the
‘Southern Corridor target’, which will be a focus for the geological team in the upcoming
exploration program. The pegmatite outcrop is over 20m in width, with the strike direction
still to be determined.
Page 9 of 21
ASX RELEASE | 13 JANUARY 2025
Figure 5: Significant pegmatite outcrop on tenement E47/4061
Andover North
Initial mapping and outcrop/float sampling are also planned on Andover North Lithium
Project (refer Figure1).
The aim of the exploration program on Andover North will be to identify any additional
outcropping/sub cropping pegmatites which are associated with structures in the
modelled target areas with a view to devising a drilling strategy.
Page 10 of 21
ASX RELEASE | 13 JANUARY 2025
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
ASX:RDN 26 November 2024 Significant Pegmatite System Intercepted at Andover South Lithium Project
ASX:RDN 29 November 2024 Pegmatite Extensions Confirmed and Visible Spodumene in Core
3
ASX:RDN 27 September 2024 Andover South Preliminary Structural Interpretation
1
2
The information in the referenced announcements 1 - 3 footnoted above that relate to Exploration Results
have previously been released to the ASX. The Company confirms that it is not aware of any information or
data that materially affects the information included in the market announcements, and that all material
assumptions and technical parameters underpinning the announcements continue to apply. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Competent Person's Statement
The information in this announcement that relates to exploration results (Including JORC Tables) is based on
and fairly represents information and supporting documentation prepared, reviewed and approved by Mr Sean
Halpin, a competent person who is a member of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin
is employed by Raiden Resources Limited. Mr Sean Halpin has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as
a Competent Person as defined in the 2012 edition of the JORC Code. Mr Sean Halpin has provided his prior
written consent as to the form and context in which the exploration results and the supporting information
are presented in this announcement.
Page 11 of 21
ASX RELEASE | 13 JANUARY 2025
Appendix
Table 1: List of drilled holes at the Andover South Project referenced in this announcement
Hole ID
GDA2020_Z50
E
GDA2020_Z50
N
RL
Dip
Azimuth
Total
Depth
(m)
Tenement
Target
Area
ASDD013
511929.438
7692122.013
38.956
-60
360
258.07
E47/4062
1/2
ASDD014
513183.563
7692384.929
54.640
-60
160
202.00
E47/4062
1/2
ASDD015
511836.378
7692190.909
40.828
-60
360
155.80
E47/4062
1/2
ASDD016
513269.268
7692393.174
43.003
-60
160
149.50
E47/4062
1/2
ASDD017
512404.633
7692298.345
64.662
-60
180
328.10
E47/4062
1/2
ASDD018
513098.797
7692325.875
51.227
-60
160
201.00
E47/4062
1/2
ASDD019
512452.788
7692297.502
70.130
-60
180
252.00
E47/4062
1/2
ASDD020
512733.697
7692458.976
45.079
-60
180
330.00
E47/4062
1/2
ASDD021
511978.941
7692401.954
48.121
-60
180
216.00
E47/4062
1/2
ASDD022
512721.611
7692364.891
41.028
-60
180
223.60
E47/4062
1/2
ASDD023
511257.540
7692544.665
44.953
-60
210
560.20
E47/4062
7
ASDD024
512589.735
7692418.172
47.296
-60
180
365.90
E47/4062
1/2
ASDD025
511495.435
7692341.056
42.245
-50
210
527.70
E47/4062
7
ASDD026
514056.762
7692843.853
33.814
-60
360
200.00
E47/4061
3
ASDD027
511260.719
7692221.400
42.933
-50
210
395.70
E47/4062
7
ASDD028
511186.763
7692383.714
45.284
-50
210
425.80
E47/4062
7
Table 2: Reported drill interceptsB
Hole ID
ASDD013
ASDD013
From (m)
To (m)
Interval
(m)
Li2O%
179.08
228.45
184
229.65
4.9
1.2
0.31
0.4
2.8
0.23
9.85
1.7
0.51
0.38
6.23
3.15
1.84
1.68
1.16
0.23
0.88
0.74
4.56
3.72
1.15
0.44
NSI
ASDD014
ASDD015
8.7
11.5
NSI
ASDD016
ASDD017
ASDD017
44.15
87.3
54
89
NSI
ASDD018
ASDD019
ASDD019
ASDD020
ASDD020
50.53
66.56
180.52
106.79
56.76
69.8
182.36
108.47
49.4
60.88
53.96
64.6
NSI
ASDD021
ASDD022
ASDD022
Page 12 of 21
ASX RELEASE | 13 JANUARY 2025
Hole ID
From (m)
To (m)
72.2
73.9
ASDD022
ASDD024
ASDD024
81
122
156.12
84.58
125
158.05
84
88
1.7
0.31
3.58
3
1.93
0.52
0.46
0.39
4
0.41
NSI
ASDD025
ASDD026
Li2O%
NSI
ASDD023
ASDD024
Interval
(m)
NSI
NSI
ASDD027
ASDD028
All pegmatite intersections are downhole measurements
B
All intersections are quoted above a 0.2% Li2O lower cutoff grade
NSI: No Significant Intersection above the 0.2% Li2O cutoff
Table 3: Tenement Schedule
Tenement
E47/4061
E47/4062
E47/4063
E47/3849
P47/2028
E47/4603
Page 13 of 21
Holder
Pilbara Gold Corporation
Pty Ltd
(Raiden Resources Ltd.’s
100% owned subsidiary)
Grant Date
Expiry
06/08/2019
05/08/2029
30/08/2024
29/08/2029
04/04/2019
03/04/2029
16/07/2018
15/07/2028
12/12/2024
11/12/2028
Application
Area
1Bl
2Bl
2Bl
1Bl
23.5 Ha.
7Bl
RDN
%
80%
80%
80%
80%
80%
100%
ASX RELEASE | 13 JANUARY 2025
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or construction activities, and (vi) other risks
and uncertainties related to the Company’s prospects, properties and business strategy. Investors are
cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and the Company does not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or nonoccurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South Lithium Project. The Company also holds the rights to the
advanced Mt Sholl nickel-copper-PGE and the Arrow gold projects in the Pilbara region of Western
Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and
deliver a significant mineral discovery.
Page 14 of 21
ASX RELEASE | 13 JANUARY 2025
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
•
•
•
•
•
•
•
•
Drilling techniques
Page 15 of 21
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
•
Diamond drilling was used to obtain nominally 1m
downhole samples of core, although individual sample
lengths varied depending upon the observed geology,
with a minimum sample length of 0.5m and a maximum of
1.0m.
Core samples were selected based on lithology, with
sample interval boundaries corresponding to lithological
boundaries.
All pegmatite intersections were sampled, together with a
minimum of 10m of country rock either side of each
pegmatite, or more in cases were any alteration or stringer
mineralisation was noted in the country rock adjacent to
the pegmatite.
Core samples were cut in half using a diamond saw, with
half of the core placed in numbered sample bags for
assaying and the other half retained in sequence in the
core tray.
Half core samples were approximately 3.0-4.0kg in weight
with a minimum weight of 500grams.
Core was cut down the apex of the core and the same
downhole side of the core selected for assaying to reduce
potential sampling bias.
All sampling practices were industry standard.
Laboratory sample prep is included in the “Sub-sampling
techniques and sample preparation” section below.
Standard tube diamond drilling was used, with HQ core
drilled from surface through partially weathered rock and
then NQ core for the remainder of the hole in fresh rock.
ASX RELEASE | 13 JANUARY 2025
Criteria
JORC Code explanation
Commentary
•
•
•
Drill sample
recovery
Logging
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
•
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
•
•
•
•
•
•
Sub-sampling
techniques and
sample preparation
Page 16 of 21
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
•
The HQ portion of each hole varied from 10-25m in
downhole length.
All core was oriented to obtain structural measurements of
features in the core.
The core orientation was completed with an Axis Champ
orientation tool.
All holes had a downhole survey taken at 25m intervals
downhole using a Reflex north-seeking gyro survey tool.
Core recovery was logged as percent of the recovered
core length versus drill run length, and it was logged after
the core was transported to the field core shed
Overall core recovery was above 99% so sample
representivity was not a factor.
There is not a relationship bias between grade and
sample recovery as sample recovery was very high, or
between sample weight and recovery for the same
reason.
100% of core was geologically logged, conducted by
experienced geologists who were directly managed on site
by senior geologists with extensive experience of logging
the lithium geology of the area.
All core logging was qualitative in nature and was to an
appropriate level of detail for any future technical work that
may be performed on the Project.
All core was photographed wet and dry.
Core logging was performed on rugged laptops, either into
Excel spreadsheets or LogChief software.
Core samples were cut in half using a diamond saw, with
half of the core placed in numbered sample bags for
assaying and the other half retained in sequence in the core
tray.
ASX RELEASE | 13 JANUARY 2025
Criteria
Quality of assay
data and laboratory
tests
Verification of
sampling and
assaying
Page 17 of 21
JORC Code explanation
Commentary
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
•
•
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
•
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No twin holes have been drilled to date.
• Pegmatite intersections were verified by the logging
geologists and further reviewed by the COO by comparing
intercepts with core photographs and assay returns.
• All assay results were received electronically as a csv text
file, along with the corresponding quality certificates from
the laboratory
• All data was incorporated into the database by the
database administrator.
• Access to the database is limited to authorised employees
only.
•
•
•
•
All samples were transported to ALS in Perth for analysis.
100% of each sample was first coarse crushed and then fine
crushed to 70%<2mm, followed by pulverising of a
750gram sample to 85% <75um, which is appropriate for
the sample type and analysis method and ensures that the
final sample is representative of the in-situ sample
collected.
Field duplicates of quarter core were submitted in each
assay batch at the rate of 2 in 100 of the total samples
submitted.
Analytical method was peroxide fusion followed by ICPAES and ICP-MS analysis. The technique is considered total.
Appropriate certified field standards and blanks were
submitted with each assay batch, supplied by OREAS Pty
Ltd, comprising approximately 8 in 100 of the total assays.
The lab also included their own industry standard QA/QC
procedures involving blanks, duplicates and standards.
Acceptable levels of accuracy were established.
ASX RELEASE | 13 JANUARY 2025
Criteria
JORC Code explanation
Commentary
• Final data was rigorously verified by Raiden’s geoscientific
personnel.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
•
•
Data spacing and
distribution
Orientation of data
in relation to
geological structure
Sample security
Page 18 of 21
Sample points were determined by DGPS with the hole
collar surveys conducted by a qualified Surveyor
contractor.
Co-ordinates are provided in the Geocentric Datum of
Australia (GDA2020) Zone 50.
Topographic control is publicly-available 2m contour
intervals.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
•
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
•
All the exploration holes were designed to intercept the
expected dip of the mineralisation as perpendicular as
possible to provide approximate true width intercepts, and
to avoid any sampling biases.
•
The sample chain of custody is managed by Raiden. All
samples were collected in the core yard at the project site
in number-coded calico bags/secure labelled polyweave
sacks by Raiden’s geological and field personnel. All
samples were delivered directly to the associated carrier,
RGR Road Haulage, by Raiden personnel before being
transported to the ALS laboratory in Perth WA for final
analysis.
•
•
Drilling is not sufficient to establish the degrees of
geological and grade continuity appropriate for a Mineral
Resource Estimate.
The drilling is reconnaissance in nature and has not been
conducted on a regular grid spacing.
No samples have been composited.
ASX RELEASE | 13 JANUARY 2025
Criteria
JORC Code explanation
Commentary
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
•
No review of the sampling techniques has been
undertaken.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Exploration done by
other parties
• Acknowledgment and appraisal of exploration by other parties.
• Tenements are located in the City of Karratha, within the
Pilbara region of Western Australia.
• Refer to Table 3, Tenement Schedule
• Tenements E47/4061 and E47/4062 are granted tenure
and are the only tenements where drilling h