Raiden expands Lithium portfolio adjacent to Azure Minerals
Released
Released
Announcement PDF
ASX RELEASE | 28th June 2023
RAIDEN EXPANDS LITHIUM PORTFOLIO
ADJACENT TO AZURE MINERAL’S (ASX:AZS)
ANDOVER LITHIUM PROJECT
ASX CODE: RDN
Highlights
•
•
DAX CODE: YM4
Raiden to acquire 80% interest in the Welcome Exploration Pty
Ltd (“Welcome”) tenements adjoining Azure Minerals (ASX: AZS)
60% owned lithium project in the Pilbara
BOARD &
MANAGEMENT
Acquired projects are interpreted to host Andover Complex rocks,
host to Azure Minerals’ recent lithium discovery (112.4m @ 1.05%
Li2O)1, and are considered prospective for pegmatite hosted
Lithium mineralisation2
Managing Director
Mr Dusko Ljubojevic
•
The acquisition provides Raiden with a significant and prospective
lithium exploration portfolio in the Andover Complex ~39km2
(Azure ~102km2)
•
The tenements are also considered prospective for nickel sulphide
mineralisation – two of the five tenements are adjacent to the
Andover/Ridgeline nickel deposit (6Mt @ 1.1% Ni and 0.47% Cu)
and within similar geological setting3
•
Next steps: The Company plans to undertake project wide
evaluation of lithium hosting pegmatite potential
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Warrick Clent
ASSET PORTFOLIO
SERBIA
Cu & Au (~150km2)
BULGARIA
Cu, Au & Ag (~409km2)
Key Terms of the Transaction
•
Raiden will acquire an 80% interest in the 5 tenements
•
Raiden will pay the Vendor a $50k cash consideration fee and
issue $365k in Raiden common shares; and
•
The vendor 20% interest will be free-carried to a final
investment decision to mine.
Page 1 of 14
Non-Executive
Chairman
Mr Michael Davy
AUSTRALIA
Au, Cu, Ni & PGE
(~840km2)
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
Figure 1: Raiden Resource’s ground holding in relation to other lithium projects and discoveries in the
district (* All market capitalisation figures as per 23/06/2023)
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
announce that it has entered into a transaction to acquire an 80% interest in 5 tenements
which are adjacent to both the Company’s Roebourne Lithium Project and Azure Mineral’s
(ASX: AZS) Andover lithium discovery in the Pilbara region of Western Australia.
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “This transaction
positions Raiden with a prospective lithium portfolio in the district. The recent lithium discovery
by Azure Minerals has positioned the Pilbara as one of the most desired jurisdictions for lithium
explorers. With a credit to Raiden’s management team, the Company has managed to secure
prospective ground, immediately adjacent to one of the most exciting lithium discovers this
year. The project area is also considered highly prospective for nickel sulphide mineralisation,
with two of the tenements being adjacent to the high-grade Andover/Ridgeline deposit. The
nickel sulphide potential of these tenements provides further upside potential to the Company’s
flagship Mt Sholl nickel-sulphide deposit, located in the same district. Plans for evaluation
and field work of these recent acquisitions, along with the remaining projects in the Pilbara,
are ongoing and the Company will provide updates to the market as the results become
Page 2 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
available. Management continue to undertake negotiations with potential strategic partners
across the entire portfolio of projects and are confident of generating further transactions that
will create value for the Company and shareholders.”
Roebourne Project and Acquisition
Off the back of the recent evaluation of lithium prospectivity on the Roebourne project,
management have defined the potential and favourable geological setting in the
neighbouring properties. The available magnetic data was used to determine the potential
extent of the Andover Complex, which are host rocks to the Andover lithium pegmatite
deposit. On the basis of this evaluation2, the Company determined that the Andover
Complex extends into the five properties which are being acquired. The Company entered
into a binding agreement with Welcome Exploration Pty Ltd (“Vendor”), to acquire an 80%
interest in 5 tenements (E47/4061-3; E47/3849 and P47/2028). The total area of the 5
tenements is 18.2 km2. In conjunction with the Roebourne tenement (E47/4603), the
combined project area totals 39 km2 and represents a significant exploration package, which
can be considered as a brownfield opportunity in relation the Andover lithium discovery.
Figure 2: Acquired projects in relation to the Roebourne Project and Azure Minerals Ltd.’s LithiumNickel project1 – lithology over open file 40m RTP TMI 1VD Magnetics
Page 3 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
The Company plans to undertake a project wide evaluation of lithium hosting pegmatite
potential in the near term and will be reporting on the results of these evaluation as they
become available.
The project area, as is the case with the Company’s Mt Sholl project, is located in a district
with excellent infrastructure and with all exploration support services being available in
Karratha, which is located 40 kilometres by road to the west of the Roebourne project. The
properties are also transected by a road network, allowing for easy access. This will allow for
a rapid and cost effective evaluation and support of this project.
As is indicated in Figure 2, the latest acquisition now secures Raiden with a prospective
lithium exploration portfolio in the district, with a large position adjacent to one of the most
exciting lithium discoveries in the Pilbara.
The recent acquisition also adds further exploration potential to Raiden’s Nickel-CopperPGE portfolio in the Pilbara. With Mt Sholl currently being the largest and potentially only
open pitable deposit in this district4, any further discoveries on the project area are likely to
add value to the viability of the Mt Sholl project.
Summary of Key Terms
The Company and Welcome have entered into a binding heads of agreement (Agreement),
to acquire 80% equity interest in the tenure surrounding the Azure Minerals Project. Raiden
will pay cash consideration of $50,000 and will be issuing fully paid ordinary shares to the
value of $365,000 based on the volume weighted average price for the 20 trading days
immediately following the execution of this Agreement by each Party. The Shares will be
subject to a period of six (6) months voluntary escrow from the date of completion.
Welcome’s 20% equity interest will be free carried until a decision to mine has been
announced. Upon expiry of the Free Carried Period, the Vendor must, within 30 days, elect
to either;
o fund its pro-rata share of production and development costs on the Tenements
(including any applicable statutory costs, and regardless of the minerals targeted
by any development of the Tenements). In such circumstances, the Parties will
enter into a formal joint venture agreement to fully document the terms and
conditions upon which the joint venture shall operate, which shall be made on
customary (AMPLA) terms;
o dilute its interest in the Tenements according to a prescribed formula). If the
Vendor elects to dilute its interest, all of the Purchaser’s expenditure during and
Page 4 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
after the Free Carried Period on the Tenements shall be included as expenditure
for the purposes of the dilution calculation; or
o sell its 20% interest in the Tenements to a bona fide third-party purchaser at the
then current prevailing market value of such interest, subject to Raiden being
provided with a 30 day right of first refusal over the purchase of the Vendor’s
interest in the Tenements.
The Completion of the agreement will be subject to satisfaction of the conditions precedent
including:
o completion of due diligence to the satisfaction of Raiden Resources, and
o the parties receiving all necessary regulatory approvals or consents and/or
complying with all requirements imposed by any regulatory body (including any
governmental agency, shareholder and ASX approvals),
o and if necessary, any relevant third party, executing a deed of assignment and
assumption in relation to any applicable third party agreements pertaining to the
Tenements
Mt Sholl & Roebourne Project Lithium Program
With the recent discovery of high-grade lithium bearing pegmatites by GreenTech Metals
Ltd (ASX: GRE) on the Ruth Well project5, which is located adjacent to Raiden’s Mt Sholl
project, and the newly acquired ground at Roebourne adjacent to Azure Minerals Ltd (ASX:
AZS), the Company is currently planning to undertake preliminary mapping and evaluation
exercises across all it’s projects to determine further prospectivity for lithium bearing
pegmatites. The Company will report on the results of this as they become available.
Employee Incentive Plan (Proposed)
The board of Raiden plans to implement a new employee incentive plan to be adopted by
shareholders. In line with the Company’s objectives of motivating and retaining key
professionals the intention is to issue Mr. Warrick Clent, the Company’s Chief Operating
Officer, subject to shareholder adoption of the plan, up to 5m performance rights, which will
be based on milestones and in 4 tranches.
Tranche 1 – 1,000,000 performance rights, subject to Raiden achieving a 20-day VWAP of
$0.01 share price or higher on or before the expiry date (24 months)
Page 5 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
Tranche 2* – 1,000,000 performance rights, subject to Raiden achieving a 20-day VWAP of
$0.015 share price or higher on or before the expiry date (24 months)
Tranche 3* – 1,500,000 performance rights, subject to Raiden achieving a 20-day VWAP of
$0.02 share price or higher on or before the expiry date (24 months)
Tranche 4 – 1,500,000 performance rights, subject to company publishing a positive PFS over
Mt Sholl project with a >$200m NPV and >20%IRR
*Subject to continued employment for a minimum of six months after the meeting of the
milestone.
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
1
ASX:AZS 13 June 2023 Exceptional Lithium Drill Intersections from Andover
2
ASX:RDN 19 June 2023 Roebourne Lithium Project Review Confirms Prospectivity
3
ASX:AZS 8 February 2023 28% Uplift in Mineral Resources at Andover Nickel Project
4
ASX:RDN 3 April 2023 Maiden Mineral Resource Estimate & JORC Exploration Target
5
ASX:GRE 15 June 2023 High-grade Lithium Discovered at Ruth Well Project
Competent Person's Statement and Previously Reported Information
The information in this announcement as referenced in footnote 2 and 4 that relates to exploration results,
including the Mineral Resources contained within the Production Target (and forecast financial information
derived from the production targets) at the Mt Sholl Project has previously been released to the ASX. The
Company confirms that it is not aware of any information or data that materially affects the information included
in the market announcement, and that all material assumptions and technical parameters underpinning the
announcement continue to apply. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcements.
Page 6 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
The information in this announcement that relates to exploration results is based on and fairly represents
information and supporting documentation, as previously announced by the Company, and has been reviewed
and approved by Mr Warrick Clent, a competent person who is a member of the Australasian Institute of Mining
and Metallurgy (AusIMM). Mr Warrick Clent is employed by Raiden Resources Limited. Mr Warrick Clent has
sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the JORC
Code. Mr Warrick Clent has provided his prior written consent as to the form and context in which the exploration
results and the supporting information are presented in this announcement.
Mineral Resources
The Company confirms it is not aware of any new information or data that materially affects the information
included in the announcement released on 3 April 2023 footnoted at 3 above and all material assumptions and
technical parameters underpinning the estimate continue to apply and have not materially changed when
referring to its resource announcement. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Mineral Resources Estimate
The Mineral Resource statement as reported on the 3 April 2023 is as follows:
Mt Sholl Mineral Resource Estimate by classification reported above a 0.35% Ni_Eq cut-off for open pit
resources and at 0.5% Ni_Eq for underground resources
Tonnes
Mt
Ni
%
Cu
%
Co
ppm
3E1
g/t
Ni Metal
kt
Cu Metal
kt
3E
(Pd, Pt, Au)
oz
Indicated
10.5
0.39
0.45
134
0.32
41.0
47.3
108,031
Inferred
9.8
0.29
0.32
78
0.32
28.4
31.3
100,715
Total
20.3
0.34
0.39
107
0.32
69.34
78.6
208,745
3.1
0.48
0.47
57
0.25
14.9
14.6
24,898
Classification
Open Pit
Underground
Inferred
Notes:
•
•
•
•
•
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code –JORC 2012 Edition).
Data is reported to significant figures and differences may occur due to rounding.
Mineral Resources have been reported above a cut-off grade of 0.35 % Nickel equivalent for open pit resources and above
0.5% Nickel equivalent for underground resources.
Bulk densities in the Basal unit are 3.06 and in Zone2 are 2.91. These figures represent averages of the values collected in
the respective domains from the 2022 drill program.
The Ni_Eq calculation represents total metal value for each metal summed and expressed in equivalent nickel grade and
tonnes. Commodity prices assumed in the calculation are noted below as is the formula used to calculate Ni_Eq.
Page 7 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
Appendix 1: Tenement Schedule
Tenement
E47/4061
E47/4062
E47/4063
E47/3849
P47/2028
E47/4603
Holder
Welcome
Exploration Pty
Ltd
Pilbara Gold
Corporation Pty
(Wholly owned
subsidiary)
Grant Date
Expiry
06/08/2019
05/08/2024
Application
04/04/2019
03/04/2024
16/07/2018
15/07/2023
Application
Application
Area
1Bl
2Bl
2Bl
1Bl
23.5
Ha.
7Bl
RDN
%
80%*
80%*
80%*
80%*
80%*
100%
* On completion of the acquisition Raiden will acquire an 80% interest
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited . (ASX:RDN / DAX:YM4) is a dual listed base metal—gold exploration Company
focused on the Mt Sholl nickel-copper-cobalt- PGE project in the Pilbara region of Western Australia project.
In addition, the company holds other highly prospective gold projects within the Pilbara region, as well as the
emerging and prolific Western Tethyan metallogenic belt in Eastern Europe, where it has established a
significant exploration footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 8 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 28th June 2023
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
• In relation to this announcement no
specialised industry standard measurement tools appropriate to the minerals
sampling has been conducted as yet and
under investigation, such as down hole gamma sondes, or handheld XRF
no assays are being reported
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where there
is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may warrant disclosure of
detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
• In relation to this announcement no
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
drilling has been conducted as yet and no
tube, depth of diamond tails, face-sampling bit or other type, whether core is
assays are being reported
oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries and
• In relation to this announcement no
results assessed.
sampling has been conducted as yet and
no assays are being reported
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
Drilling
techniques
Drill sample
recovery
Commentary
ASX RELEASE | 28th June 2023
Criteria
JORC Code explanation
Commentary
Logging
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• In relation to this announcement no
drilling has been conducted as yet.
Sub-sampling
techniques and
sample
preparation
•
Not applicable
Not applicable
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
•
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
• Not applicable
Page 10 of 14
ASX RELEASE | 28th June 2023
Criteria
JORC Code explanation
Commentary
storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Co-ordinates are provided in the
Geocentric Datum of Australia
(GDA94) Zone 50.
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Not applicable
Orientation of data • Whether the orientation of sampling achieves unbiased sampling of possible
in relation to
structures and the extent to which this is known, considering the deposit type.
geological
• If the relationship between the drilling orientation and the orientation of key
structure
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sample security
• The measures taken to ensure sample security.
• Not applicable
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• Not applicable.
• Not applicable
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• Raiden Resources Ltd tenements are located in the
City of Karratha, within the Pilbara region of
Western Australia.
• Refer to Appendix 1, Tenement Schedule
• Tenements E47/4061, E47/4063, and E47/3849 are
Page 11 of 14
ASX RELEASE | 28th June 2023
Criteria
Exploration done
by other parties
Geology
Page 12 of 14
JORC Code explanation
Commentary
granted tenure while E47/4062 and P47/2028 are in
• The security of the tenure held at the time of reporting along with
the application stage.
any known impediments to obtaining a licence to operate in the
area.
• Tenements are located on the Mt Welcome pastoral
lease.
• Raiden is not aware of any existing impediments nor
of any potential impediments which may impact
ongoing exploration and development activities at the
project sites, with the exception of E47/3849 which
Raiden notes is currently subject to an Application
for Forfeiture but on which expenditure
commitments have been well met every year since
grant.
• Acknowledgment and appraisal of exploration by other parties.
• A search and compilation of historic exploration has
been completed.
• Work included stream sediment, soil and rock
sampling, geological mapping, and geophysical
surveys.
• Deposit type, geological setting and style of mineralisation.
• Potential for lithium-caesium-tantalum bearing
pegmatite mineralisation.
• Mt Sholl Project geological setting - paleoarchean
greenstone rocks intruded by Mesoarchean maficultramafic intrusive complex associated with
widespread disseminated to matrix and stringer
pyrrhotite-pentlandite-chalcopyrite mineralisation.
Mesoarchean mylonite in the Sholl Shear Zone north
of the property, with lode gold mineralisation in
related subsidiary structures.
• Roebourne Project geological setting – previous
explorers considered the area to be part of the Ruth
Well Formation (Mafic and ultramafic volcanic and
intrusive rocks; minor chert; metamorphosed),
ASX RELEASE | 28th June 2023
Criteria
Drill hole
Information
Data aggregation
methods
Page 13 of 14
JORC Code explanation
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
Commentary
however this new interpretation shows that the rocks
of the Andover Intrusion/Complex (Archean-age
mafic-ultramafic intrusion) extend under cover
further to the north than previously suggested.
• It is further interpretated that the source of
mineralising fluids for the lithium pegmatites are
sourced from nearby felsic intrusive bodies, these
being the Black Hill Well Monzogranite for the
Roebourne Project, and the Cleland Supersuite rocks
for the Mt Sholl Project area.
• Not applicable
• Not applicable
ASX RELEASE | 28th June 2023
Criteria
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
Balanced
reporting
Other substantive
exploration data
Further work
Page 14 of 14
JORC Code explanation
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagram
Share your feedback
Discover