Highlights
•
•
DAX CODE: YM4
Review and compilation of available geophysical data highlights
Li-bearing pegmatite potential of the Roebourne Project
completed
Geophysical interpretation of intrusive body confirms presence of
Andover Complex, host to lithium bearing pegmatites at Azure’s
(ASX: AZS) Andover Project located adjacent to Roebourne
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
o Azure drilling only 3km south of Raiden’s Roebourne Project
Non-Executive Director
Mr Dale Ginn
•
Shallow transported material over Raiden’s Roebourne Project
obscures underlying geology
Non-Executive Director
& Company Secretary
Ms Kyla Garic
•
Raiden to commence field reconnaissance planning work for
evaluation of potential host geology within its project areas,
including the Mt Sholl Project area, which is within 1.7km’s of
GreenTech’s (ASX: GRE) recent Ruth Well Project high-grade Li
pegmatite discoveries
Chief Operating Officer
Mr Warrick Clent
ASSET PORTFOLIO
SERBIA
Cu & Au (~150km2)
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the
Company”) is pleased to announce that it has completed its review of
the available historical and geophysical data for its Roebourne Lithium
Project (E47/4603) located in the Pilbara region of Western Australia.
BULGARIA
Cu, Au & Ag (~409km2)
AUSTRALIA
Au, Cu, Ni & PGE
(~840km2)
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“We are excited by this recent analysis of the Roebourne Project, showing
potential for lithium bearing pegmatite mineralisation. Our initial focus on Roebourne was for
nickel-copper mineralisation, which we believe is viable and will add to the overall Ni-Cu-PGE
potential within the scope of the Mt Sholl project. The analysis of the available geophysical
data sets strongly indicates that the project hosts the right rocks and is prospective for
Page 1 of 6
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 19th June 2023
pegmatite hosted lithium mineralisation, as has been demonstrated by Azure Minerals
immediately to the south of Roebourne.”
Raiden considers that based on interpretation of the historical, and more recent available
datasets, that there exists a high prospectivity for pegmatites on its Roebourne Lithium
Project.
This is based on the understanding that the rocks underlying Raiden’s tenure, obscured by
shallow transported cover, exhibit a consistent magnetic signature which shows the Andover
Complex to be of a larger area than previously mapped (see Figure 1).
As can be seen in recent drilling results at Azure Minerals Ltd (ASX: AZS) Andover Lithium
Project1, on adjacent tenements, the rocks of the Andover complex are a suitable geological
host for high-grade lithium-bearing pegmatites.
Figure 1: Roebourne Project Location – lithology over TMI 1VD Magnetics
Page 2 of 6
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 19th June 2023
It should be noted that in addition to the known lithium prospectivity of the Andover
complex, as shown by recent Azure Mineral Ltd drill results, that the potential for lithiumbearing pegmatites has also been shown in related geological units within the district. None
more so than at GreenTech Metals Ltd (ASX: GRE) recent discovery of high-grade lithiumbearing pegmatites2, in analogous rocks, at their Ruth Well Project 30km west of Roebourne.
Raiden is now in the process of planning field reconnaissance work on potential host geology
within its project areas, including the Mt Sholl Project area adjacent to GreenTech’s Ruth
Well Project (see Figure 2). Updates on this work will be provided to the market as they come
to hand.
Figure 2: Mt Sholl Project Location with GreenTech’s Ruth Well Project tenements3
Page 3 of 6
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 19th June 2023
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
1
ASX:AZS 13 June 2023 Exceptional Lithium Drill Intersections from Andover
2
ASX:GRE 15 June 2023 High-grade Lithium Discovered at Ruth Well Project
3
ASX:RDN 3 April 2023 Maiden Mineral Resource Estimate & JORC Exploration Target
Competent Person's Statement
The information in this announcement from the 3 April 2023 that relates to exploration results, including the
Mineral Resources contained within the Production Target (and forecast financial information derived from the
production targets) at the Mt Sholl Project has previously been released to the ASX. The Company confirms that
it is not aware of any information or data that materially affects the information included in the market
announcement, and that all material assumptions and technical parameters underpinning the announcement
continue to apply. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
Mineral Resources
The Company confirms it is not aware of any new information or data that materially affects the information
included in the announcement released on 3 April 2023 footnoted at 3 above and all material assumptions and
technical parameters underpinning the estimate continue to apply and have not materially changed when
referring to its resource announcement. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Page 4 of 6
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 19th June 2023
Mineral Resources Estimate
The Mineral Resource statement as reported on the 3 April 2023 is as follows:
Mt Sholl Mineral Resource Estimate by classification reported above a 0.35% Ni_Eq cut-off for open pit
resources and at 0.5% Ni_Eq for underground resources
Tonnes
Mt
Ni
%
Cu
%
Co
ppm
3E1
g/t
Ni Metal
kt
Cu Metal
kt
3E
(Pd, Pt, Au)
oz
Indicated
10.5
0.39
0.45
134
0.32
41.0
47.3
108,031
Inferred
9.8
0.29
0.32
78
0.32
28.4
31.3
100,715
Total
20.3
0.34
0.39
107
0.32
69.34
78.6
208,745
3.1
0.48
0.47
57
0.25
14.9
14.6
24,898
Classification
Open Pit
Underground
Inferred
Notes:
•
•
•
•
•
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code –JORC 2012 Edition).
Data is reported to significant figures and differences may occur due to rounding.
Mineral Resources have been reported above a cut-off grade of 0.35 % Nickel equivalent for open pit resources and above
0.5% Nickel equivalent for underground resources.
Bulk densities in the Basal unit are 3.06 and in Zone2 are 2.91. These figures represent averages of the values collected in
the respective domains from the 2022 drill program.
The Ni_Eq calculation represents total metal value for each metal summed and expressed in equivalent nickel grade and
tonnes. Commodity prices assumed in the calculation are noted below as is the formula used to calculate Ni_Eq.
Page 5 of 6
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 19th June 2023
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited . (ASX:RDN / DAX:YM4) is a dual listed base metal—gold exploration Company
focused on the Mt Sholl nickel-copper-cobalt- PGE project in the Pilbara region of Western Australia project.
In addition, the company holds other highly prospective gold projects within the Pilbara region, as well as the
emerging and prolific Western Tethyan metallogenic belt in Eastern Europe, where it has established a
significant exploration footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 6 of 6
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
Share your feedback
Discover