Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX RELEASE | 24th July 2023
RAIDEN QUARTERLY ACTIVITIES REPORT
FOR PERIOD ENDED 30 JUNE 2023
ASX CODE: RDN
Highlights of quarterly activities
• Mt Sholl Maiden JORC (2012) Mineral Resource Estimate and
Exploration Target released1:
o Mt Sholl resource estimated to contain 23.4Mt @ 0.36%
Ni, 0.40% Cu and 0.31 g/t 3E (0.60% Ni_Eq or 1.54%
Cu_Eq) at a 0.35% Ni_Eq cut-off, and 40.4Mt @ 0.28% Ni,
0.28% Cu and 0.23 g/t 3E at a 0.15% Ni_Eq cut-off (JORC
2012)
o A further JORC Exploration Target of 80 – 150Mt at a
grade range of 0.45% - 0.75% Ni_Eq or 1.15% - 1.95%
Cu_Eq* was also defined
o Mineralisation remains open along strike and at depth
across all 4 deposits and is only constrained by current
drilling providing potential resource growth
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Warrick Clent
• $1.2m in funding secured via completion of a $600k placement to
sophisticated and professional investors and through a nonrenounceable rights issue to existing shareholders, with
remaining Shortfall (~$640k) available to place at Company’s
discretion2
ASSET PORTFOLIO
• Company continues to advance negotiation regarding
divestments of further non-core assets in Europe and Australia
BULGARIA
Cu, Au & Ag (~409km2)
• Entry in binding heads of Agreement to acquire 80% equity
interest in tenements surrounding Azure Minerals (ASX: AZS)
Andover Lithium Project
AUSTRALIA
Au, Cu, Ni & PGE
(~840km2)
SERBIA
Cu & Au (~150km2)
o Acquired projects are interpreted to host Andover
Complex rocks, host to Azure Minerals’ lithium
mineralisation, and are considered prospective for
pegmatite hosted Lithium mineralisation9
Page 1 of 17
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 24th July 2023
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
provide its report on activities and progress made during the June 2023 Quarter:
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “The release of the
Maiden Resource at Mt Sholl was a significant milestone for the Company. The mineral
resource estimate was consistent with the parameters published within the initial exploration
target in 2022. Management are excited to progress to the next phase of realising value at
Mt Sholl Project through the commencement of the metallurgical studies. Despite challenging
market conditions, during the quarter the Company successfully secured funding from
existing shareholders. The Board of Raiden and I are grateful for the continued support of
shareholders to advance the Company’s strategic objectives.
In addition, the divestment of non-core assets continued with the Company entering into
terms on Yandicoogina in Western Australia and Majdanpek West in the Republic of Serbia.
Raiden continues to have discovery upside through free-carried interests and royalties.
Management will continue to implement this strategy over the remaining non-core assets
and further transactions are anticipated over the next reporting period.”
Exploration Activities in Western Australia
Mt Sholl Project
During the reporting quarter the Company released a maiden JORC (2012) compliant
Mineral Resource Estimate (MRE) for the Mt Sholl Nickel-Copper-PGE project1.
The Mt Sholl resource is estimated to contain 23.4Mt @ 0.36% Ni, 0.40% Cu and 0.31
g/t 3E (0.60% Ni_Eq/1.54% Cu_Eq) for 83.9kt of contained Nickel, 93.7kt of contained
Copper and 233,644oz of PGE’s, at a cut-off grade of 0.35% Ni_Eq cut-off for open pit
resources and at 0.5% Ni_Eq for underground resources (JORC 2012),
The above reported resource sits within a larger lower grade resource that at a 0.15% Ni_Eq
cut-off contains:
40.4Mt @ 0.28% Ni, 0.28% Cu and 0.23 g/t 3E (0.45% Ni_Eq or 1.17% Cu_Eq) for
183.2kt of contained Nickel, 473.0kt of contained Copper and 300,972 oz of PGE’s
and a further
Page 2 of 17
ASX RELEASE | 24th July 2023
JORC Exploration Target of 80 – 150Mt at a grade range of 0.45% - 0.75% Ni_Eq or
1.15% - 1.95% Cu_Eq*
*The potential quantity and grade of this exploration target is conceptual in nature, there is currently
insufficient exploration completed to support a mineral resource of this size and it is uncertain whether
continued exploration will result in the estimation of a JORC resource. The Exploration Target has been
prepared in accordance with the JORC Code (2012).
Table 1: Mt Sholl Mineral Resource Estimate by classification reported above a 0.35% Ni_Eq cutoff for open pit resources and at 0.5% Ni_Eq for underground resources
Tonnes
Mt
Ni
%
Cu
%
Co
ppm
3E1
g/t
Ni Metal
kt
Cu Metal
kt
3E
(Pd, Pt,
Au)
oz
Indicated
10.5
0.39
0.45
134
0.32
41.0
47.3
108,031
Inferred
9.8
0.29
0.32
78
0.32
28.4
31.3
100,715
Total
20.3
0.34
0.39
107
0.32
69.34
78.6
208,745
3.1
0.48
0.47
57
0.25
14.9
14.6
24,898
Classification
Open Pit
Underground
Inferred
Notes:
•
•
•
•
•
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code –JORC 2012 Edition).
Data is reported to significant figures and differences may occur due to rounding.
Mineral Resources have been reported above a cut-off grade of 0.35 % Nickel equivalent for open pit resources and above
0.5% Nickel equivalent for underground resources.
Bulk densities in the Basal unit are 3.06 and in Zone2 are 2.91. These figures represent averages of the values collected in
the respective domains from the 2022 drill program.
The Ni_Eq calculation represents total metal value for each metal summed and expressed in equivalent nickel grade and
tonnes. Commodity prices assumed in the calculation are noted below as is the formula used to calculate Ni_Eq.
Page 3 of 17
ASX RELEASE | 24th July 2023
Mt Sholl Ni-Cu-PGE Project Overview
The consolidated tenements are located 22km south of Karratha and 10km northeast of
the mothballed Radio Hill mine in the Pilbara region of Western Australia, covering a total
land area of 42km2 (see Figure 1). The project is well positioned in respect to
infrastructure with the Port of Dampier, Karratha International Airport, and grid power,
sealed highway and experienced mining support services all available within a 40km
radius of the project.
Figure 1: Mt Sholl Project in relation to key infrastructure and nearby JORC (2012) Resources 5,6,7
Page 4 of 17
ASX RELEASE | 24th July 2023
Figure 2: Mt Sholl project area with mineral resource and pit (0.35% Ni_Eq cut-off) locations
Grade tonnage tables have been generated for the Mt Sholl Deposits according to
classification. The grade tonnage table for the Mineral Resource is shown in Table 2 and
3.
Page 5 of 17
ASX RELEASE | 24th July 2023
Table 2: Mt Sholl OP Grade Tonnage Table
Cutoff
NiEq
spot
CuEq
spot
Tonnage
Ni
Cu
Co
Pd
Pt
Au
Ag
0.05
0.4
1.02
41,690,380
0.25
0.24
82
0.15
0.03
0.02
0.61
0.1
0.41
1.06
39,844,827
0.25
0.25
84
0.16
0.03
0.02
0.63
0.15
0.43
1.11
37,334,108
0.26
0.26
87
0.17
0.03
0.03
0.64
0.2
0.46
1.18
33,662,504
0.28
0.28
90
0.18
0.03
0.03
0.66
0.25
0.5
1.28
28,734,183
0.30
0.32
96
0.20
0.04
0.03
0.69
0.3
0.54
1.39
24,220,815
0.32
0.35
102
0.23
0.04
0.03
0.74
0.35
0.58
1.49
20,289,730
0.34
0.39
107
0.24
0.04
0.04
0.76
0.4
0.62
1.6
16,826,941
0.36
0.43
113
0.26
0.05
0.04
0.83
0.45
0.68
1.75
12,914,532
0.40
0.48
121
0.28
0.05
0.04
0.91
0.5
0.74
1.91
10,144,603
0.43
0.53
127
0.30
0.06
0.04
1.01
0.55
0.79
2.04
8,232,309
0.46
0.57
133
0.31
0.06
0.04
1.09
0.6
0.85
2.2
6,525,899
0.50
0.62
143
0.33
0.07
0.04
1.19
0.65
0.89
2.33
5,432,384
0.53
0.65
150
0.35
0.07
0.04
1.26
0.7
0.94
2.48
4,461,138
0.56
0.69
158
0.37
0.07
0.05
1.34
0.75
0.99
2.62
3,684,694
0.59
0.72
166
0.39
0.08
0.05
1.42
0.8
1.03
2.76
3,024,598
0.62
0.76
174
0.41
0.08
0.05
1.52
0.85
1.08
2.93
2,432,489
0.65
0.80
186
0.43
0.09
0.05
1.63
0.9
1.13
3.08
2,003,463
0.68
0.83
196
0.45
0.09
0.05
1.72
0.95
1.17
3.24
1,638,103
0.72
0.85
205
0.47
0.09
0.05
1.79
Cutoff
NiEq
spot
CuEq
spot
Tonnage
Ni
Cu
Co
Pd
Pt
Au
Ag
Table 3: Mt Sholl UG Grade Tonnage Table
0.5
0.73
1.89
3,097,720
0.48
0.47
57
0.18
0.04
0.03
0.43
0.55
0.78
2.03
2,480,931
0.52
0.50
57
0.19
0.04
0.04
0.45
0.6
0.82
2.17
2,031,555
0.55
0.52
57
0.21
0.04
0.04
0.48
0.65
0.87
2.32
1,627,127
0.59
0.54
59
0.22
0.05
0.04
0.53
0.7
0.92
2.47
1,298,219
0.64
0.57
66
0.23
0.05
0.04
0.59
0.75
0.98
2.65
1,021,575
0.69
0.58
74
0.23
0.05
0.04
0.66
0.8
1.03
2.83
800,026
0.74
0.60
82
0.24
0.05
0.05
0.66
0.85
1.1
3.03
621,857
0.79
0.63
93
0.25
0.05
0.05
0.66
0.9
1.17
3.30
464,810
0.86
0.64
105
0.27
0.06
0.06
0.65
0.95
1.24
3.55
363,849
0.92
0.67
121
0.28
0.06
0.06
0.70
1
1.29
3.72
309,418
0.96
0.69
129
0.28
0.06
0.06
0.69
Mt Sholl 2023 Exploration Target
The Company is also pleased to announce that it has defined an Exploration Target in
accordance with JORC 2012 reporting code, ranging from 80 – 150Mt at a grade range
of 0.45% - 0.75% Ni_Eq or 1.15% - 1.95% Cu_Eq*
*The potential quantity and grade of this exploration target is conceptual in nature, there is currently insufficient exploration
completed to support a mineral resource of this size and it is uncertain whether continued exploration will result in the
estimation of a JORC resource. The Exploration Target has been prepared in accordance with the JORC Code (2012).
Page 6 of 17
ASX RELEASE | 24th July 2023
The Mt Sholl 2023 Exploration Target was estimated over six areas: strike and dip extensions
to the A1, B1 B2, and Kudos deposit areas, the southern plunge extensions to the B2
deposit, as well as the prospective northern contact zone between the A1 and B1 deposits.
To put this into context historical drilling has tested only 39% of the potential strike extents
of the Mt Sholl Ni-Cu-PGE bearing geological units, 14% of the down-dip potential, and
only 6% of the potential overall extent of the deposit.
The Company has also commenced with planning for the metallurgical studies, which are
planned over the following reporting period. The studies will be carried out on the core
which was derived from the Company’s drilling campaign in late ’22. The objective will be
to optimise the recoveries and the concentrate grades.
Acquisition of tenements surrounding Azure Minerals (ASX: AZS)
Andover Lithium Project
The Company and Welcome Exploration Pty Ltd (“Welcome”) have entered into a binding
heads of agreement (“Agreement”) under which Raiden is to acquire 80% equity interest in
the tenure adjacent to the Azure Minerals (ASX: AZS) 60% Andover lithium project in the
Pilbara.
This acquisition was off the back of the recent evaluation of lithium prospectivity on the
Roebourne project (E47/4603) management defined the potential and favourable
geological setting in the neighbouring properties. The available magnetic data was used
to determine the potential extent of the Andover Complex, which are host rocks to the
Andover lithium pegmatite deposit. On the basis of this evaluation9, the Company
determined that the Andover Complex extends into the five properties which are being
acquired.
As is indicated in Figure 3, the latest acquisition now secures Raiden with a prospective
lithium exploration portfolio in the district, with a large position adjacent to one of the
most exciting lithium discoveries in the Pilbara.
Page 7 of 17
ASX RELEASE | 24th July 2023
Figure 3: Acquired projects in relation to the Roebourne Project and Azure Minerals Ltd.’s LithiumNickel project10 – lithology over open file 40m RTP TMI 1VD Magnetics
Key Terms of the Agreement:
•
Raiden will acquire 80% interest in the 5 tenements;
•
Raiden will pay the Vendor a $50k cash consideration fee and issue $365k in Raiden
common shares; and
•
The vendor’s 20% interest will be free-carried to a final investment decision to mine.
The completion of the agreement will be subject to satisfaction of the conditions precedent
including:
•
Completion of due diligence to the satisfaction of Raiden; and
•
The parties receiving all necessary regulatory approvals or consents and/ or
complying with all requirements imposed by any regulatory body (including any
government agency, shareholders and ASX approvals),
Page 8 of 17
ASX RELEASE | 24th July 2023
•
and if necessary, any relevant third party, executing a deed of assignment and
assumption in relation to any applicable third party agreements pertaining to the
Tenements.
The Company further announced that it will be undertaking a review of the Mt Sholl project
with respect to lithium potential on the northern license (E47/3181), which management
consider prospective for pegmatite style lithium mineralisation. The E47/3181 project is
also 80% owned by the Company, with Welcome holding the remaining 20% interest.
Other Australian Projects
Management continued to engage with potential partners regarding the divestment and
partnerships regarding non-core assets in Australia, which will allow the Company to focus
on progressing the Mt Sholl Ni-Cu-PGE sulphide project. No further field activities have
taken place over these non-core projects.
Yandicoogina
The Company entered into a binding letter of intent with LW Resources Pty Ltd (“LW
Resources”), under which LW Resources will acquire a 90% interest in the Yandicoogina
project tenements.
Key Terms of the Agreement:
•
Within 5 days of the execution date of the LOI, LW Resources will pay Raiden $10,000
cash consideration for a 75-day exclusivity and due diligence period.
•
At the expiration of the exclusivity period and subject to LW Resources being satisfied
with the due diligence, the parties will negotiate and enter into a binding definitive
tenement sale agreement (“Definitive Agreement”).
•
The Definitive Agreement will include the consideration for the acquisition of the
project tenements as follows:
o
Pay Raiden a $50,000 cash consideration
o
Issue $100,000 in shares (Share Consideration), in a company that is listed on the
Australian Securities Exchange (“ASX”), at a deemed issue price equal to the 5-day
VWAP of the ASX Listed Company immediately prior to the date on which the
Share Consideration is proposed to be issued.
Page 9 of 17
ASX RELEASE | 24th July 2023
•
Raiden will retain a 10% free carried interest in the property until completion of a
positive feasibility study, at which time it can, at its election, contribute pro-rata to
any further expenditure; sell it’s 10% interest to a third party with LW Resources or its
Nominee maintaining a Right of First Refusal’ or dilute to a 1% Net Smelter Royalty
over the mineral rights.
Exploration Activities in Bulgaria
Vuzel
During the reporting period, the Company has commenced with a field campaign to follow
up on the early drilling success on this project, as reported by the Company on the 6th of
July 2022. The objective of the current campaign will be to gain a better understanding of
the structural controls of the high-grade mineralisation, which was intercepted in the
maiden drilling campaign. Activities will include further geological and structural mapping;
outcrop sampling and soil sampling, which will be analysed for a multi element suite of
elements in order to determine whether the gold bearing structures have an associated
multi-element signature, which can be used to define the frame work in more detail. On
the basis of these results, the Company will plan a follow up drill campaign on the project.
Kalabak
The Company did not undertake any further field activities on this project, but the Company
is engaging with other parties about potential divestments and partnerships in relation to
this project.
Zlatusha
On the 24th of January 2023, the Company announced that it has entered into an earn-in
and cash/ script agreement with Velocity Minerals Ltd (“Velocity”) in regard to the Zlatusha
project in Bulgaria. Velocity’s team continue to make preparations in regard to the summer
field program on the Zlatusha project, which will include a permit wide magnetic
geophysical survey and geochemical sampling campaign. All exploration activities will be
reported as Velocity report their results.
Page 10 of 17
ASX RELEASE | 24th July 2023
Subsequently to the execution of the agreement, the parties agreed to amend the terms
of the first payment of option from Velocity to Raiden. Under the original terms of the
agreement Velocity was obliged to make a C$100k cash payment and a variable (at
Velocity’s discretion) C$100k cash/stock payment. Under the variation agreement Raiden
agreed to receive a C$220k Velocity stock payment as satisfaction of this milestone.
Raiden has subsequently received this stock payment.
BG1 project
The Company continues to liaise with the Ministry of Energy in Bulgaria to execute the
“exploration agreement” for this project and no further activity was undertaken on the
project during the reporting period.
Exploration Activities in Serbia
Donje Nevlje
The Company did not undertake any further field activities on this project during the
reporting period, but the Company is engaging with other parties about potential
divestments and partnerships in relation to this project.
Majdanpek West
During the quarter the Company entered into a binding sale agreement with Konstantin
Resources Limited (“Konstantin”) in regard to its 100% owned Majdanpek West project in
Serbia.
Key Terms of the Agreement:
•
Konstantin paid a $15,000 deposit to Raiden within 5 business days of execution of
the agreement,
•
Konstantin will pay a monthly project maintenance fee for a period of 12 months
from date of execution, or up to payment of the purchase price (whichever occurs
first),
•
$300,000 cash or stock* payment to be made for 100% of the project ownership,
within 24 months from execution of the agreement,
Page 11 of 17
ASX RELEASE | 24th July 2023
•
Konstantin shall maintain the project in good standing until the purchase price has
been made
•
Raiden shall retain a 1% NSR over the project area with Konstantin having the
option, but not the obligation to;
o Purchase 0.5% of the NSR for $300,000 at any time prior to publishing a
Definitive Feasibility Study (“DFS”), or
o Purchase 0.5% of the NSR for $1m at any time after the publication of the
DFS, but prior to commencement of construction of a mine on the project
area.
*Any Konstantin Shares issued to Raiden in connection with the payment will be issued pursuant to
registration requirements of applicable securities laws. To the extent that such Konstantin Shares will
be subject to resale restrictions under applicable securities laws as a result of such exemptions or the
policies of any applicable stock exchange.
If the Completion Date occurs before the Buyer has been admitted to the official list of the ASX for at
least 10 Trading Days, an amount equivalent to the issue price of the Buyer Shares in the initial public
offering undertaken pursuant to the IPO Condition (nominally $0.20 per share), otherwise, an amount
equivalent to the VWAP for the 10 Trading Days prior to the Share Issue Completion Date
Konstantin, at its sole discretion, can substitute the stock payments with a cash payment.
Corporate
During the reporting period the Company successfully raised $600,000 by issuing 200M
shares at issue price of $0.003 to sophisticated and professional investors (“Placement”).
The Company also undertook a Non-Renounceable Rights issue on the basis of 1 new
share for every 4 shares held on the record date, raising $602,060 (before costs). Under
the Prospectus, the Company had capacity to issue a maximum 413,645,614 New Shares,
a total of 200,686,473 shares were subscribed for by eligible participants (“Rights”). A total
of 212,959,141 Shortfall Shares remaining available for placement at the Directors
discretion within three months of the closing date. If the Shortfall Shares are placed this
would raise additional $638,877 (before costs).
Page 12 of 17
ASX RELEASE | 24th July 2023
Funds raised from the Placement and the Rights Issue will be used to undertake
metallurgical test work on its Mt Sholl Ni-Cu-Co-PGE project, with further drilling planned
based on metallurgical results. The funds will also be used for working capital and costs
of the offer.
As has been communicated to the market, management continues to engage with
potential partners regarding the divestment or partnerships on its non-core assets in
Australia and the Balkans, with the aim of generating further value for the Company and
discovery potential for shareholders over the non-core assets.
Summary of Expenditure
Of the total expenditure of the Company during the Quarter, A$265k of the Company’s
expenditure was on activities related to the exploration and development of the current
projects as detailed in the Cashflow Report (5B) appended to this report. The Company
did not incur any expenditure related to mining, production and development activities
during the Quarter.
In accordance with ASX Listing Rule 5.3.5 payments totalling approximately A$154k were
made to related parties of the Company, being Non-Executive, Managing Director fees
and accounting and company secretarial fees (section 6.1 of the accompanying 5B).
Page 13 of 17
ASX RELEASE | 24th July 2023
Tenement Table: ASX Listing Rule 5.3.3
Mining tenement interests held at the end of the quarter and their location:
Tenement reference and location
Location
Nature
Status
Interest
Donje Nevlje 310-02-1547/2015-02
Serbia
Direct
Granted
100%
Zapadni Majdanpek 310-021096/2016-02
Serbia
Direct
Granted
100%
Kalabak (Bulgaria) – Licence No. 405
Bulgaria
Direct
Granted
100%
Zlatusha (Bulgaria) – Licence No. 486
Bulgaria
Direct
Granted
100%
BG1 (Bulgaria) – Permit No. 527
Bulgaria
Direct
Pending
100%
Mt Sholl (E47/4309)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3468)
Western Australia
Direct
Granted
100%
Yandicoogina (E45/3571)
Western Australia
Direct
Granted
100%
Yandicoogina (E45/3474)
Western Australia
Direct
Granted
100%
Yandicoogina (M45/115)
Western Australia
Direct
Granted
100%
Yandicoogina (M45/987)
Western Australia
Direct
Granted
100%
Boodalyerrie (E45/3586)
Western Australia
Direct
Granted
100%
Arrow (E47/3476)
Western Australia
Direct
Granted
100%
Arrow (E47/3478)
Western Australia
Direct
Granted
100%
Pyramid (E47/4300)
Western Australia
Direct
Granted
100%
Welcome (E47/3339)
Western Australia
Direct
Granted
80%
Welcome (E47/3181)
Western Australia
Direct
Granted
80%
Welcome (P47/1762)
Western Australia
Direct
Granted
80%
Welcome (P47/1787)
Western Australia
Direct
Granted
80%
Welcome (P47/1788)
Western Australia
Direct
Granted
80%
Welcome (P47/1789)
Western Australia
Direct
Granted
80%
Welcome (P47/1790)
Western Australia
Direct
Granted
80%
Welcome (P47/1791)
Western Australia
Direct
Granted
80%
Welcome (P47/1792)
Western Australia
Direct
Granted
80%
Welcome (P47/1793)
Western Australia
Direct
Granted
80%
Welcome (P47/1794)
Western Australia
Direct
Granted
80%
Welcome (P47/1795)
Western Australia
Direct
Granted
80%
Mining tenement interests relinquished during the quarter and their location:
Tenement reference and location
North Shaw (E45/4988)
Page 14 of 17
Location
Western Australia
Nature
Direct
Status
Interest
Surrendered
100%
ASX RELEASE | 24th July 2023
Mining tenement interests acquired during the quarter and their location:
Tenement reference and location
Location
Nature
Status
Interest
Nil
Nil
Nil
Nil
Nil
Mining tenement interests under application during the quarter and their location:
Tenement reference and location
Tabba Tabba (E45/6182)
Mt Sholl (P47/2024)
Pyramid (E47/4307)
Roebourne (E47/4603)
Eastern Creek (E46/1294)
Location
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Nature
Direct
Direct
Direct
Direct
Direct
Status
Application pending
Application pending
Application pending
Application pending
Application pending
Interest
100%
100%
100%
100%
100%
Beneficial percentage interests held in farm-in or farm-out agreements at the end of the
quarter:
Tenement reference and location
Location
Nature
Status
Interest
Vuzela (Bulgaria) – Licence No. 522
Bulgaria
Joint
Venture
Granted
51%
a The Company has an agreement to earn-in up to 90% position within the project and an option to purchase 100% of
the project. At the end of the quarter the Company held 51% interest in Vuzel Minerals EOOD, which holds the Vuzel
licence.
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
Page 15 of 17
ASX RELEASE | 24th July 2023
ASX Announcements referenced to directly, or in the commentary of, this quarterly activities release
ASX:RDN 3 April 2023 Maiden Mineral Resource Estimate & JORC Exploration Target
1
ASX:RDN 3 April 2023 $1.84 Million Capital Raising, Board changes and ATM Facility
2
ASX:RDN 13 April Sale of Majdanpek West Project for $300k cash/script & Royalty
3
ASX:RDN 24 May Sale of Non-core Yandicoogina Project for $160k and free-carried position
4
ASX:ARV 7 May 2019 Nickel and Copper Resources at Ruth Well
5
ASX:ARV 21 December 2018 Shallow Nickel-Copper Resource Defined at Radio Hill
6
ASX:AZS 8 February 2023 28% Uplift in Mineral Resources at Andover Nickel Project
7
ASX: RDN 28 June 2023 Raiden Expands Lithium Portfolio adjacent to Azure Minerals
8
ASX: RDN 20 June 2023 Roebourne Lithium Project Review Confirms Prospectivity
9
ASX:AZS 13 June 2023 Exceptional Lithium Drill Intersections from Andover
10
Competent Person's and Compliance Statement
The information in the referenced announcement 1 to 4 and 8 - 9 footnoted above that relates to
Exploration Results, including Mineral Resources and Exploration Target has previously been released to the
ASX. The Company confirms that it is not aware of any information or data that materially affects the
information included in the market announcements, and that all material assumptions and technical
parameters underpinning the announcements continue to apply. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Mineral Resources
The Company confirms it is not aware of any new information or data that materially affects the information
included in the Company announcement on 3 April 2023 (Maiden Mineral Resource Estimate and JORC
Exploration Target) and that information that relates to the Mt Sholl Mineral Resource estimate and all
material assumptions and technical parameters underpinning the estimate continue to apply and have not
materially changed when referring to its resource announcement made on 03 April 2023. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Page 16 of 17
ASX RELEASE | 24th July 2023
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or construction activities, and (vi) other risks
and uncertainties related to the Company’s prospects, properties and business strategy. Investors are
cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and the Company does not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or nonoccurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed transition energy-metal—gold exploration
Company focused on exploring and developing the Mt Sholl Ni-Cu-Co-PGE deposit in the Pilbara region of
Western Australia. The Company also has a significant portfolio of gold projects in WA, including the Arrow