Significant pegmatite system intercepted at Andover South
Released
Released
Announcement PDF
ASX RELEASE | 26 November 2024
SIGNIFICANT PEGMATITE SYSTEM INTERCEPTED
AT ANDOVER SOUTH LITHIUM PROJECT
Highlights
Drilling Update Target Area 7
First diamond drillhole (ASDD023) drilled in Target Area 7
intersected ∼250 metre pegmatite-bearing zone (from 309m to
558m – end of hole)A – Refer Figure 3 and Appendix Table 4
ASX CODE: RDN
•
Drill hole terminated within a 57m thickA pegmatite at 558 metres
(terminated due to drill rig mechanical issues) – hole will be redrilled
BOARD &
MANAGEMENT
•
Target Area 7 appears to represent a major structural corridor, which
is an ideal target for significant pegmatite emplacement
Non-Executive
Chairman
Mr Michael Davy
•
Drill testing of target ongoing along projected strike of ASDD023
Managing Director
Mr Dusko Ljubojevic
•
Drilling Update Target Area 1 and 2
DAX CODE: YM4
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
•
Assays received for the first 12 holes of maiden drill program at Andover
South - Initial drilling concentrated in centre of tenement E47/4062 in
Target Area 1 and 2 – Refer Appendix Table 1 and Table 2
•
Widest intersection includes 15.3 metresA @ 0.53 Li2O and highest
individual grade assays above 2% Li2O
•
Majority of pegmatites intersected dip at shallow angle to the north and
remain open along strike and down dip
ASSET PORTFOLIO
Planning for further drilling on target Areas 1 and 2 is ongoing - Main
target zone interpreted to remain untested
AUSTRALIA
Li, Au, Cu, Ni & PGE
•
Ongoing Activities and Planning
Chief Operating Officer
Mr Sean Halpin
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
•
Within the next week remaining holes sampled from Target Area 1 & 2,
as well as samples from holes drilled at Target Area 7, will be dispatched
to the laboratory for assaying – results expected 3-4 weeks thereafter
•
Drilling continues on Target Area 7 to test for pegmatite zone extensions
along strike, up dip and at depth
•
Initial drill testing of target area 3 and 4
•
On basis of Target Area 7 intercept, management undertaking re-evaluation of target areas 1,2,5,6
as well as further structural trends, with further drilling planned
Page 1 of 21
ASX RELEASE | 26 November 2024
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
provide an update on the maiden diamond drilling program at its Andover South Lithium
Project, located in the Pilbara region of Western Australia.
A
Downhole width is not equivalent to true thickness. Structural measurement and
analysis of drill core is ongoing to establish the true orientation of the pegmatite.
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “The recent drill
intercept on Target Area 7 has significant implications for our planning and targeting across
the entire project. ASDD023 has intersected a major structural trend, which comprises of
multiple, wide stacked pegmatites, as well as altered intrusives. This intercept will allow us
to now vector into this zone along strike and at depth.
Observations from this drill hole are also driving our strategy for exploration of other Targets
on the project, including Target Areas 1 and 2. Our initial observations suggest that drilling
to date on Targets 1 and 2 has tested the upper parts of the system whereby the main target,
or structure remains untested on the southern periphery of Target Area 1.
While we are drill testing the direct extensions of the ASDD023 drill intercept, we will be
modelling the extensions of this pegmatite trend for future drill testing on Target Areas 1
and 2.”
Page 2 of 21
ASX RELEASE | 26 November 2024
Figure 1: Andover South Project In relation to Andover Deposit1,2,3
Page 3 of 21
ASX RELEASE | 26 November 2024
Figure 2: Drilling Target Areas and locations1,2,3
Target Area 7 Drilling Update
Target Area 7 is located on the western side of tenement E47/4062 (Refer Figure 2),
where a pegmatite outcrops along an 800m north-west strike extent and (on the basis
of a single drill intercept), is interpreted to dip to the northeast. The pegmatites in
Target Area 7 are associated with similar, low fractionation rates to the pegmatites in
Target Area 1, indicating the potential for fractionation and potential for lithium
mineralisation. Unlike Target Areas 1 and 2, the pegmatites in Target Area 7 are hosted
within a foliated ultramafic rock and very coarse-grained biotite schist.
The first diamond drillhole completed in Area 7, ASDD023, has intersected a broad zone
of what are interpreted to be a multi-phase pegmatite, hosted by biotite-altered
porphyritic dykes and intrusions (refer to Appendix, Table 4, for geological log of
ASDD023). Individual pegmatite intersections within the zone are up to 57m thickA
(Refer Figure 3 Interpreted cross-section ASDD023). Management’s current
interpretation, is that these pegmatites are hosted within a significant structural corridor,
which has accommodated significant pegmatitic intrusions. Drill testing of the target
along strike is ongoing and will include the completion of the drill hole ASDD023 to
Page 4 of 21
ASX RELEASE | 26 November 2024
ensure that the true width of the system is defined.
The Company cautions that no samples have been assayed and that the company
has not conducted any mineralogical or petrological analysis of the drill core.
These will be conducted in due course, along with assay testing of the entire zone.
Figure 3: Interpreted cross-section of drill hole ASDD023B
A
Downhole width is not equivalent to true thickness. Structural measurement and
analysis of drill core is ongoing to establish the true orientation of the pegmatite.
Page 5 of 21
ASX RELEASE | 26 November 2024
Target Area 1 and 2 Drilling Update
The primary objective of the initial drill holes was to define the subsurface characteristics
of the pegmatite system, which outcrops on the Andover South project, including the
stratigraphic and structural disposition (dip angle and dip directions). Out of the 12 drill
holes assayed to date, all holes have intersected pegmatites, which range in thickness
from <1m to 15m. Initial interpretation indicates that the pegmatite system in this area
dips at a very shallow angle to the north and is hosted within massive and structurally
undisturbed gabbro. This low-angle dip deviates from field observations to date, where
steeply dipping pegmatites (that dip to the north and to the south) have been observed.
Further pegmatite intersections at greater depths point to a potential stacked system with
the potential for repetitions at depth (Refer Figure 4 Cross section A-B). On this basis,
management believe that the mineralisation at Andover South, Target Areas 1 and 2, is
hosted within a structural framework, which may host pegmatite mineralisation within
multiple strike and dip orientations. This interpretation requires a systematic approach to
the drilling program going forward.
On the basis of these observations and the recent intercept of a major pegmatite-bearing
zone within Target Area 7, management believe that the drilling to date conducted on at
Andover South Target Area 1 and 2, has only tested the upper parts of the system and
the main structural targets remain untested and potentially located further south from
limits of current drilling.
Page 6 of 21
ASX RELEASE | 26 November 2024
Figure 4: Cross section A-B
Page 7 of 21
ASX RELEASE | 26 November 2024
Figure 5: Drill core from ASDDO10 (high grade section - 90.56m to 90.96m interval - 2.1% Li2O)
Plans and Ongoing Activities
A second set of samples will be dispatched to the laboratory within the following week
and results are anticipated in the following 3-4 weeks thereafter.
Management plan to concentrate further drilling in Target Area 7 to test for pegmatite
extensions along strike to the southeast, up dip and at depth, as well as evaluate other
analogues to Target Area 7 on the project area.
Furthermore, a structural targeting model will be updated based on the Target Area 7
intercepts and extrapolated across the entire project area.
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
Page 8 of 21
ASX RELEASE | 26 November 2024
ASX Announcements referenced to directly in this release
ASX:RDN 23 September 2024 Mapping confirms new high-priority target zone at Andover
ASX:RDN 14 October 2024 $10m institution led raise to accelerate and expand drilling
3
ASX:AZS 18 September 2023 Andover Delivers More Outstanding Lithium Results
1
2
The information in the referenced announcements 1 - 2 footnoted above that relate to Exploration Results
have previously been released to the ASX. The Company confirms that it is not aware of any information or
data that materially affects the information included in the market announcements, and that all material
assumptions and technical parameters underpinning the announcements continue to apply. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Competent Person's Statement
The information in this announcement that relates to exploration results (Including JORC Tables) is based on
and fairly represents information and supporting documentation prepared, reviewed and approved by Mr Sean
Halpin, a competent person who is a member of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin
is employed by Raiden Resources Limited. Mr Sean Halpin has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as
a Competent Person as defined in the 2012 edition of the JORC Code. Mr Sean Halpin has provided his prior
written consent as to the form and context in which the exploration results and the supporting information
are presented in this announcement.
Appendix
Table 1: List of drilled holes at the Andover South Project referenced in this announcement
Hole ID
GDA2020_Z50 E
GDA2020_Z50 N
RL
Dip
Azimuth
Total
Depth
(m)
ASDD001
ASDD002
ASDD003
512300
512825
512823
7692130
7692208
7692210
43
30
30
-60
-60
-80
182
160
160
144.3
114.6
60
ASDD004
ASDD005
ASDD006
ASDD007
ASDD008
ASDD009
512825
512825
512889
512889
511914
511998
7692248
7692246
7692220
7692220
7692268
7692238
50
50
64
64
49
83
-80
-60
-80
-50
-60
-60
160
160
180
340
180
210
143.2
198
102
575.7
200
294
ASDD010
ASDD011
ASDD012
ASDD023
512872
511903
512873
511254
7692354
7692240
7692350
7692543
92
47
55
42
-60
-60
-80
-60
160
180
160
214
192.2
96.3
120.1
558*
Assaying
Status
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Pending
*Drill hole ASDD023 terminated due to drill rig mechanical issues, within a 57m thick pegmatite at 558 metres
Page 9 of 21
ASX RELEASE | 26 November 2024
Table 2: Reported drill interceptsB
Hole ID
ASDD002
ASDD004
ASDD004
ASDD005
ASDD005
ASDD005
ASDD005
ASDD006
Including
Including
ASDD006
ASDD007
Including
Including
ASDD007
ASDD007
ASDD007
ASDD007
ASDD007
ASDD007
ASDD008
Including
ASDD008
ASDD009
ASDD009
ASDD009
ASDD009
ASDD009
ASDD009
ASDD010
ASDD010
ASDD010
ASDD010
ASDD010
Including
Including
ASDD011
Including
ASDD012
ASDD012
ASDD012
ASDD012
ASDD012
Page 10 of 21
From (m)
11.2
17.05
26.35
11.7
14.75
19.67
23.7
0.7
5
12.81
24
9
9
16.4
24.6
29.97
290.8
318
471.6
521.89
35.3
37.75
74.19
11.1
104.85
157.85
165.55
228.3
243.75
61
66.8
74
77.18
88
90.56
93.06
85
86.75
57
62.9
76
79
89
To (m)
12
18.2
27
12.7
15.4
20.35
24.45
16
7
14
24.25
20.4
12.8
17.4
25.6
31.5
292.63
319
479.7
522.5
39
38
75.04
13
105.55
159.6
166.75
228.9
245.35
61.64
67.78
74.78
80.13
94.61
90.96
94.61
88.65
87.7
58.2
64.22
76.53
80.55
97.73
Interval (m)
0.8
1.15
0.65
1
0.65
0.68
0.75
15.3
2
1.19
0.25
11.4
2.8
1
1
1.53
1.83
1
8.1
0.61
3.7
0.25
0.85
1.9
0.7
1.75
1.2
0.6
1.6
0.64
0.98
0.78
2.95
6.61
0.4
1.55
3.65
0.95
1.2
1.32
0.53
1.55
8.73
Li2O %
0.11
0.12
0.11
0.11
0.15
0.14
0.12
0.53
1.26
1.29
0.13
0.65
1.42
1.23
0.98
0.14
0.11
0.18
0.12
0.11
0.5
1.2
0.12
0.22
0.38
0.94
0.66
0.12
0.16
0.18
0.13
0.12
0.14
0.65
2.1
1.7
0.46
1.16
0.11
0.12
0.13
0.12
0.34
ASX RELEASE | 26 November 2024
Hole ID
Including
ASDD012
From (m)
90.11
102
To (m)
90.61
102.49
Interval (m)
0.5
0.49
Li2O %
1.21
0.11
All pegmatite intersections are downhole measurements
B
All intersections are quoted above a 0.1% Li2O lower cutoff grade
Table 3: Tenement Schedule
Tenement
E47/4061
E47/4062
E47/4063
E47/3849
P47/2028
E47/4603
Holder
Grant Date
Pilbara Gold Corporation
Pty Ltd
(Raiden Resources Ltd.’s
100% owned subsidiary)
Expiry
06/08/2019
05/08/2029
30/08/2024
29/08/2029
04/04/2019
03/04/2029
16/07/2018
15/07/2028
Application
Application
Area
1Bl
2Bl
2Bl
1Bl
23.5 Ha.
7Bl
Table 4: Geological Log of Drillhole ASDD023
Page 11 of 21
Hole ID
From (m)
To (m)
ASDD023
ASDD023
ASDD023
ASDD023
0
0.3
7
7.6
0.3
7
7.6
43.6
Interval
(m)
0.3
6.7
0.6
36
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
43.6
65.7
69
76
77.8
82.15
65.7
69
76
77.8
82.15
82.35
22.1
3.3
7
1.8
4.35
0.2
Gabbro
Basalt
Ultramafic
Dolerite
Basalt
Pegmatite
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
82.35
88.2
88.7
94.95
95.5
106.35
88.2
88.7
94.95
95.5
106.35
106.9
5.85
0.5
6.25
0.55
10.85
0.55
Basalt
Shear Zone
Ultramafic
Pegmatite
Basalt
Pegmatite
ASDD023
ASDD023
ASDD023
ASDD023
106.9
139.3
139.8
143.75
139.3
139.8
143.75
144.45
32.4
0.5
3.95
0.7
Ultramafic
Pegmatite
Ultramafic
Pegmatite
Rock Type
Soil
Ultramafic
Vein
Ultramafic
RDN
%
80%
80%
80%
80%
80%
100%
ASX RELEASE | 26 November 2024
Page 12 of 21
Hole ID
From (m)
To (m)
ASDD023
ASDD023
144.45
146.1
146.1
147.3
Interval
(m)
1.65
1.2
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
147.3
147.7
148.4
157.9
162.55
204.6
147.7
148.4
157.9
162.55
204.6
207.5
0.4
0.7
9.5
4.65
42.05
2.9
Ultramafic
Gabbro
Ultramafic
Basalt
Ultramafic
Gabbro
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
207.5
215.4
234.4
236
239.65
241.6
215.4
234.4
236
239.65
241.6
244.2
7.9
19
1.6
3.65
1.95
2.6
Pegmatite
Ultramafic
Pegmatite
Ultramafic
Pegmatite
Shear zone
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
244.2
244.4
249.35
252.4
260.2
260.8
263.2
244.4
249.35
252.4
260.2
260.8
263.2
266.25
0.2
4.95
3.05
7.8
0.6
2.4
3.05
Pegmatite
Ultramafic
Pegmatite
Gabbro
Pegmatite
Dolerite
Pegmatite
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
266.25
286.6
287.55
289.6
291.5
306.15
286.6
287.55
289.6
291.5
306.15
308.4
20.35
0.95
2.05
1.9
14.65
2.25
Basalt
Pegmatite
Basalt
Pegmatite
Basalt
Ultramafic
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
308.4
348.65
350
362.8
364.4
366.5
348.65
350
362.8
364.4
366.5
373.3
40.25
1.35
12.8
1.6
2.1
6.8
Pegmatite
Qtz vein
Pegmatite
Altered intrusive
Pegmatite
Altered intrusive
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
373.3
374.1
374.75
376.65
380.6
389.1
374.1
374.75
376.65
380.6
389.1
389.4
0.8
0.65
1.9
3.95
8.5
0.3
Pegmatite
Ultramafic
Pegmatite
Ultramafic
Altered intrusive
Pegmatite
ASDD023
ASDD023
389.4
396
396
398.65
6.6
2.65
Altered intrusive
Pegmatite
Rock Type
Ultramafic
Pegmatite
ASX RELEASE | 26 November 2024
Page 13 of 21
400
402
Interval
(m)
1.35
2
Ultramafic
Altered intrusive
402
406.4
418.9
420
433.5
438.5
406.4
418.9
420
433.5
438.5
445.7
4.4
12.5
1.1
13.5
5
7.2
Pegmatite
Altered intrusive
Pegmatite
Altered intrusive
Pegmatite
Altered intrusive
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
445.7
450.3
452.81
456.77
472.24
472.63
450.3
452.81
456.77
472.24
472.63
501.19
4.6
2.51
3.96
15.47
0.39
28.56
Pegmatite
Altered intrusive
Pegmatite
Altered intrusive
Pegmatite
Altered intrusive
ASDD023
501.19
558
56.81
Pegmatite
Hole ID
From (m)
To (m)
ASDD023
ASDD023
398.65
400
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
ASDD023
Rock Type
ASX RELEASE | 26 November 2024
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or construction activities, and (vi) other risks
and uncertainties related to the Company’s prospects, properties and business strategy. Investors are
cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and the Company does not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or nonoccurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South Lithium Project. The Company also holds the rights to the
advanced Mt Sholl nickel-copper-PGE and the Arrow gold projects in the Pilbara region of Western
Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and
deliver a significant mineral discovery.
Page 14 of 21
ASX RELEASE | 26 November 2024
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
•
•
•
•
•
•
•
•
Drilling techniques
Page 15 of 21
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
•
Diamond drilling was used to obtain nominally 1m
downhole samples of core, although individual sample
lengths varied depending upon the observed geology,
with a minimum sample length of 0.5m and a maximum of
1.0m.
Core samples were selected based on lithology, with
sample interval boundaries corresponding to lithological
boundaries.
All pegmatite intersections were sampled, together with a
minimum of 10m of country rock either side of each
pegmatite, or more in cases were any alteration or stringer
mineralisation was noted in the country rock adjacent to
the pegmatite.
Core samples were cut in half using a diamond saw, with
half of the core placed in numbered sample bags for
assaying and the other half retained in sequence in the
core tray.
Half core samples were approximately 3.0-4.0kg in weight
with a minimum weight of 500grams.
Core was cut down the apex of the core and the same
downhole side of the core selected for assaying to reduce
potential sampling bias.
All sampling practices were industry standard.
Laboratory sample prep is included in the “Sub-sampling
techniques and sample preparation” section below.
Standard tube diamond drilling was used, with HQ core
drilled from surface through partially weathered rock and
then NQ core for the remainder of the hole in fresh rock.
ASX RELEASE | 26 November 2024
Criteria
JORC Code explanation
Commentary
•
•
•
Drill sample
recovery
Logging
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
•
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
•
•
•
•
•
•
Sub-sampling
techniques and
sample preparation
Page 16 of 21
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
•
The HQ portion of each hole varied from 10-25m in
downhole length.
All core was oriented to obtain structural measurements of
features in the core.
The core orientation was completed with an Axis Champ
orientation tool.
All holes had a downhole survey taken at 25m intervals
downhole using a Reflex north-seeking gyro survey tool.
Core recovery is logged as percent of the recovered core
length versus drill run length, and it is logged after the
core is transported to the field core shed
Overall core recovery was above 99% so sample
representivity was not a factor.
There is not a relationship bias between grade and
sample recovery as sample recovery was very high, or
between sample weight and recovery for the same
reason.
100% of core was geologically logged, conducted by
experienced geologists who were directly managed on site
by senior geologists with extensive experience of logging
the lithium geology of the area.
All core logging was qualitative in nature and was to an
appropriate level of detail for any future technical work that
may be performed on the Project.
All core was photographed wet and dry.
Core logging was performed on rugged laptops, either into
Excel spreadsheets or LogChief software.
Core samples were cut in half using a diamond saw, with
half of the core placed in numbered sample bags for
assaying and the other half retained in sequence in the core
tray.
ASX RELEASE | 26 November 2024
Criteria
Quality of assay
data and laboratory
tests
Verification of
sampling and
assaying
Page 17 of 21
JORC Code explanation
Commentary
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
•
•
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
•
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No twin holes have been drilled to date.
• Pegmatite intersections were verified by the logging
geologists and further reviewed by the COO by comparing
intercepts with core photographs and assay returns.
• All assay results were received electronically as an Excel
spreadsheet and sif files, along with the corresponding
quality certificates from the laboratory
• All data was incorporated into the database by the
database manager
• Access to the database is limited to authorised employees
only.
•
•
•
•
All samples were transported to ALS in Perth for analysis.
100% of each sample was first coarse crushed and then fine
crushed to 70%<2mm, followed by pulverising of a
750gram sample to 85% <75um, which is appropriate for
the sample type and analysis method and ensures that the
final sample is representative of the in-situ sample
collected.
Field duplicates of quarter core were submitted in each
assay batch at the rate of 2 in 100 of the total samples
submitted.
Analytical method was peroxide fusion followed by ICPAES and ICP-MS analysis. The technique is considered total.
Appropriate certified field standards and blanks were
submitted with each assay batch, supplied by OREAS Pty
Ltd, comprising approximately 8 in 100 of the total assays.
The lab also included their own industry standard QA/QC
procedures involving blanks, duplicates and standards.
Acceptable levels of accuracy were established.
ASX RELEASE | 26 November 2024
Criteria
JORC Code explanation
Commentary
• Final data was rigorously verified by Raiden’s geoscientific
personnel.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
•
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
•
•
All the exploration holes were designed to intercept the
expected dip of the mineralisation as perpendicular as
possible in order to provide approximate true width
intercepts, and to avoid any sampling biases.
Sample security
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
•
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
•
For the current sampling program the sample chain of
custody is managed by Raiden. All samples were collected
in the core yard at the project site in number-coded calico
bags/secure labelled polyweave sacks by Raiden’s
geological and field personnel. All samples were delivered
directly to the associated carrier, RGR Road Haulage, by
Raiden personnel before being transported to the ALS
laboratory in Perth WA for final analysis.
No review of the sampling techniques has been
undertaken.
Data spacing and
distribution
Orientation of data
in relation to
geological structure
Page 18 of 21
•
•
•
Sample points were determined by handheld GPS.
Co-ordinates are provided in the Geocentric Datum of
Australia (GDA94) Zone 50.
Topographic control is publicly-available 2m contour
intervals.
Drilling is not sufficient to establish the degrees of
geological and grade continuity appropriate for a Mineral
Resource Estimate.
The drilling is reconnaissance in nature and has not been
conducted on a regular grid spacing.
No samples have been composited.
ASX RELEASE | 26 November 2024
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships,
Share your feedback
Discover