Infill sampling confirms high priority lithium anomalies
Released
Released
Announcement PDF
ASX RELEASE | 22nd March 2024
INFILL SOIL SAMPLING CONFIRMS HIGH
PRIORITY LITHIUM ANOMALIES AT MT
SHOLL PROJECT
Highlights
•
ASX CODE: RDN
Infill soil sampling program has confirmed previously defined
lithium anomalies on Mt Sholl project1
•
Program has delineated two high value Lithium targets, further
constraining initial anomalies and with a peak soil value of 188
ppm Lithium (405 ppm Li2O)
•
The lithium in soil trends cover a strike length of 3.5km in Northcentral part of tenement and 2.5km in the South-eastern section1
•
The results will allow for a more focused follow up campaign, to
define potential targets
•
Further mapping and sampling will be undertaken over all the
defined anomalies
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the
Company”) is pleased to announce the results of an infill soil sampling
program undertaken over previously defined anomalies at the Mt Sholl
North Project.
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Warrick Clent
ASSET PORTFOLIO
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
AUSTRALIA
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
Li, Au, Cu, Ni & PGE
“This infill sampling program has delivered substantial results for the
Company. The following action for Raiden will be to undertake a follow
up program with the objective to delineate further pegmatite targets on
the Mt Sholl project. The infill sampling program has significantly
constrained the mineralised trends, allowing for a more focused mapping program to define
potential pegmatite targets.”
Page 1 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 22nd March 2024
Soil Sampling Overview
The objective of the infill soil sampling program, was to follow up and define in further detail
previously identified anomalies generated during the 20231 sampling campaign. The infill
sampling grids were executed on a 50 metre by 100 metre grid and a 50 metre by 200 metre
grid over the anomalies, infilling the original survey line spacing.
As a result, the lithium anomalies are currently further constrained within distinct geometries,
with peak values of up to 188ppm Li (405 ppm Li2O) in soils. The geometry of the defined
anomalies appears to broadly reflect the geometry of the mapped pegmatites in the southeast zone of the tenement, and the pegmatite trends on GreenTech’s (ASX: GRE) Osbourne
project2 to the east of the Mt Sholl project. To obtain further information additional mapping
and evaluation of these trends is being considered as next steps with the objective of
defining further potential drill targets.
Figure 1: Mt Sholl Project with the results of Raiden’s lithium infill soil sampling program, in relation
to GreenTech Metals Ltd.’s Osbourne JV results1,2
Page 2 of 14
ASX RELEASE | 22nd March 2024
Figure 2: Raiden’s Mt Sholl lithium project in relation to Raiden’s Pilbara portfolio of projects,
infrastructure and key discoveries in the district
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
Page 3 of 14
ASX RELEASE | 22nd March 2024
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South, Mt Sholl and Arrow lithium projects. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region
of Western Australia. In addition, the Company holds the rights, as well as the emerging and prolific Western
Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration footprint in
Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 4 of 14
ASX RELEASE | 22nd March 2024
ASX Announcements referenced to directly in this release
1
ASX:RDN 05 December 2023 Multiple lithium soil anomalies defined at Mt Sholl project
2
ASX:GRE 29 November 2023 Maiden diamond Hole completed Osborne Joint Venture
Competent Person's Statement and Previously Reported Information
The information in this announcement that relates to exploration results is based on and fairly represents
information and supporting documentation, and has been reviewed and approved by Mr Warrick Clent, a
competent person who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Warrick
Clent is employed by Raiden Resources Limited. Mr Warrick Clent has sufficient experience that is relevant to the
style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 edition of the JORC Code. Mr Warrick Clent has provided his prior
written consent as to the form and context in which the exploration results and the supporting information are
presented in this announcement.
The information in the referenced announcement 1 footnoted above that relate to Exploration Results has
previously been released to the ASX. The Company confirms that it is not aware of any information or data that
materially affects the information included in the market announcements, and that all material assumptions and
technical parameters underpinning the announcements continue to apply. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.
Appendix 1
Table 1: Soil Sampling Significant Results Sorted Highest to Lowest
Significant Assays Li ppm >=50 ppm
Site ID
Easting
GDA94 Z50
Northing
GDA94 Z50
Li
ppm
Site ID
Easting
GDA94 Z50
Northing
GDA94 Z50
Li
ppm
MSS0449
491268
7690113
187.5
MSS1381
490970
7689664
99.5
MSS0671
488270
7690910
138.5
MSS1489
491470
7690014
93.6
MSS1607
492670
7690614
134
MSS1444
491170
7690014
93
MSS0665
488270
7691210
132
MSS1616
492770
7690614
92.6
MSS1333
490770
7690114
132
MSS1341
490770
7689764
91.3
MSS0670
488270
7690960
125.5
MSS1285
490570
7689714
90.6
MSS1448
491170
7689814
123
MSS0574
492468
7690663
89.1
MSS1621
492770
7689964
121.5
MSS1261
490570
7691614
87.9
MSS1432
491170
7690564
117
MSS0668
488270
7691060
87.8
MSS0450
491268
7690163
114.5
MSS1469
491370
7689964
86
MSS1340
490770
7689814
113.5
MSS1486
491470
7690164
85.9
MSS0585
492868
7689913
108
MSS1540
491870
7690114
85
MSS1507
491570
7690014
104.5
MSS0379
490868
7689713
84.2
MSS1334
490770
7690064
103.5
MSS1615
492770
7690664
84
MSS0666
488270
7691160
100.5
MSS1460
491370
7690364
83.8
Page 5 of 14
ASX RELEASE | 22nd March 2024
Site ID
Easting
GDA94 Z50
Northing
GDA94 Z50
Li
ppm
Site ID
Easting
GDA94 Z50
Northing
GDA94 Z50
Li
ppm
MSS1597
492570
7690714
83.6
MSS1307
490670
7689714
68.1
MSS1522
491770
7690114
83
MSS1530
491870
7690614
66.9
MSS0584
492868
7689863
82.8
MSS0389
490868
7690213
66
MSS0065
488468
7690963
82.6
MSS1467
491370
7690064
66
MSS1320
490770
7691514
81.9
MSS1533
491870
7690464
65.2
MSS1496
491570
7690514
81.5
MSS1386
491070
7690664
64.6
MSS1468
491370
7690014
81
MSS0549
492068
7690713
64.1
MSS0392
490868
7690363
80.1
MSS1606
492670
7690664
63.8
MSS1343
490770
7689664
80
MSS1445
491170
7689964
63.7
MSS1508
491570
7689964
79.5
MSS0513
491668
7690213
63.5
MSS1598
492570
7690664
79.4
MSS0586
492868
7689963
63.4
MSS0561
492468
7690013
78.9
MSS1490
491470
7689964
63.4
MSS1559
491970
7690064
78
MSS1532
491870
7690514
63.3
MSS1617
492770
7690564
77.3
MSS1339
490770
7689864
63.2
MSS0667
488270
7691110
76.9
MSS1503
491570
7690164
63.2
MSS0669
488270
7691010
76.4
MSS1529
491870
7690664
63.2
MSS0515
491668
7690313
75.7
MSS1558
491970
7690114
63
MSS1380
490970
7689714
75.3
MSS0662
488270
7691360
62.8
MSS1335
490770
7690014
74.8
MSS0356
490468
7691663
62.6
MSS0600
492868
7690663
74.5
MSS0417
490868
7691613
62.6
MSS0391
490868
7690313
74.3
MSS0443
491268
7689813
62.4
MSS0643
492770
7689910
74.3
MSS1405
491070
7689764
62.3
MSS0672
488270
7690860
73.7
MSS1587
492370
7690614
61.9
MSS0510
491668
7690063
73.6
MSS0061
488468
7690763
61.8
MSS1506
491570
7690064
72.6
MSS0448
491268
7690063
61.7
MSS1600
492570
7690564
72.4
MSS0067
488468
7691063
60.8
MSS1566
492170
7690514
72.2
MSS1608
492670
7690564
60.8
MSS0317
490468
7689713
72
MSS1501
491570
7690264
60.6
MSS1319
490770
7691564
71.7
MSS1401
491070
7689964
60
MSS1453
491370
7690714
71.6
MSS0114
488868
7690863
59.6
MSS1264
490570
7691464
71.4
MSS0673
488270
7690810
59.5
MSS1321
490770
7691464
71
MSS1449
491170
7689764
59.5
MSS1332
490770
7690164
70.9
MSS0073
488468
7691363
59.3
MSS0601
492868
7690713
70.3
MSS1270
490570
7690414
59.3
MSS1318
490770
7691614
70.2
MSS1178
489968
7691513
59.2
MSS1502
491570
7690214
69.8
MSS1542
491870
7690014
59.1
MSS1458
491370
7690464
69.7
MSS0599
492868
7690613
59
MSS1488
491470
7690064
69.4
MSS1456
491370
7690564
59
MSS1523
491770
7690064
69.4
MSS0416
490868
7691563
58.9
MSS0445
491268
7689913
68.4
MSS1265
490570
7691414
58.9
MSS1528
491870
7690714
68.2
MSS0457
491268
7690513
58.8
Page 6 of 14
ASX RELEASE | 22nd March 2024
Site ID
Easting
GDA94 Z50
Northing
GDA94 Z50
Li
ppm
Site ID
Easting
GDA94 Z50
Northing
GDA94 Z50
Li
ppm
MSS0459
491268
7690613
58.7
MSS0664
488270
7691260
53.6
MSS1461
491370
7690314
58.6
MSS1379
490970
7689764
53.6
MSS0545
492068
7690513
58.3
MSS0710
488670
7690910
53.4
MSS1204
490170
7691414
58.3
MSS0004
488068
7690363
53.3
MSS1322
490770
7691414
57.5
MSS1620
492770
7690014
53.1
MSS0537
492068
7690113
57.3
MSS1551
491970
7690464
53
MSS1350
490970
7691664
57.3
MSS0069
488468
7691163
52.9
MSS0511
491668
7690113
57.2
MSS0659
488270
7691510
52.9
MSS1515
491770
7690464
57.2
MSS1577
492270
7690564
52.8
MSS0064
488468
7690913
57.1
MSS1520
491770
7690214
52.6
MSS1342
490770
7689714
57
MSS0355
490468
7691613
52.5
MSS1541
491870
7690064
56.9
MSS0508
491668
7689963
52.4
MSS1463
491370
7690264
56.8
MSS0514
491668
7690263
52.4
MSS0390
490868
7690263
56.6
MSS1152
489770
7691464
52.3
MSS0024
488068
7691363
56.2
MSS0509
491668
7690013
52.2
MSS0115
488868
7690913
56
MSS1130
489568
7691463
52
MSS1131
489568
7691413
55.9
MSS1605
492670
7690714
52
MSS1262
490570
7691564
55.9
MSS1182
489970
7691314
51.8
MSS0177
489268
7691313
55.8
MSS1402
491070
7689914
51.7
MSS1470
491370
7689914
55.7
MSS1281
490570
7689914
51.6
MSS1428
491170
7690764
55.4
MSS1457
491370
7690514
51.6
MSS0663
488270
7691310
55.1
MSS1474
491470
7690714
51.4
MSS1466
491370
7690114
55.1
MSS1500
491570
7690314
51.4
MSS1526
491770
7689964
54.9
MSS0481
491268
7691713
51.3
MSS1595
492370
7690014
54.7
MSS0292
490068
7691463
51.1
MSS1614
492770
7690714
54.5
MSS0640
492670
7689810
51
MSS1275
490570
7690214
54.4
MSS1353
490970
7691514
50.9
MSS0066
488468
7691013
54.3
MSS0388
490868
7690163
50.8
MSS0463
491268
7690813
54.3
MSS0707
488670
7691060
50.8
MSS1328
490770
7690364
54.2
MSS0573
492468
7690613
50.7
MSS1433
491170
7690514
54.2
MSS0117
488868
7691013
50.6
MSS1455
491370
7690614
54.1
MSS1499
491570
7690364
50.4
MSS1303
490670
7689914
54
MSS0706
488670
7691110
50.3
MSS1404
491070
7689814
54
MSS1317
490770
7691664
50.2
MSS1579
492270
7690464
54
MSS0808
491070
7691560
50.1
MSS0547
492068
7690613
53.7
Page 7 of 14
ASX RELEASE | 22nd March 2024
Table 2: Tenement Schedule
Tenement
E47/3468
E47/4309
E47/3339
P47/1762
P47/1787
P47/1788
P47/1789
P47/1790
P47/1791
P47/1792
P47/1793
P47/1794
P47/1795
E47/3181
P47/2024
Page 8 of 14
Holder
Grant Date
Expiry
Area
Pilbara Gold
Corporation
Pty Ltd
(Raiden
Resources
Ltd.’s 100%
owned
subsidiary)
12/09/2017
24/07/2020
14/09/2016
01/09/2016
24/01/2017
24/01/2017
24/01/2017
30/11/2018
02/08/2018
02/08/2018
30/11/2018
30/11/2018
30/11/2018
13/08/2015
08/12/2023
11/09/2022
23/07/2025
13/09/2026
31/08/2024
23/01/2025
23/01/2025
23/01/2025
29/11/2022
01/08/2022
01/08/2022
29/11/2022
29/11/2022
29/11/2022
12/08/2025
07/12/2027
1Bl
2Bl
1Bl
139 Ha.
188 Ha.
200 Ha.
148 Ha.
197 Ha.
177 Ha.
193 Ha.
197 Ha.
157 Ha.
146 Ha.
5Bl
5 Ha.
RDN Equity
%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Comment
Covered
by NAC
Heritage
Agreement
ASX RELEASE | 22nd March 2024
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries and results
assessed.
• Measures taken to maximise sample recovery and ensure representative nature
of the samples.
• Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
•
Drilling
techniques
Drill sample
recovery
Logging
Page 9 of 14
•
Soil samples was collected at 50m intervals along northsouth lines spaced 100-200m apart from a consistent depth
of 15-20cm with approximately 200g collected and placed
into individually labelled paper Geochem packets.
Samples were dispatched to ALS Global Laboratories in
Perth for analysis.
•
In relation to this announcement no drilling by Raiden has
been conducted as yet and no assays are being reported
•
In relation to this announcement no drill sampling by
Raiden has been conducted as yet and no assays are being
reported
•
In relation to this announcement no drilling by Raiden has
been conducted as yet.
ASX RELEASE | 22nd March 2024
Criteria
Sub-sampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
JORC Code explanation
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
Commentary
•
•
•
•
•
•
•
•
•
Verification
of sampling
and assaying
Page 10 of 14
• The verification of significant intersections by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
•
ALS Global have followed standard procedures for sample
preparation to produce sub-samples for analysis
The laboratory reported the use of standards and blanks as
part of the analyses for QA/QC for determination of mineral
content.
Standards, blanks, and field duplicates were submitted by
the company at a ratio of 1:20 samples.
All QAQC samples submitted by the company returned
results within acceptable levels of accuracy.
Laboratory procedures and assaying are considered
appropriate by the CP for the type of sample.
Assaying of the soil samples was conducted by ALS Global
Laboratories in Perth using their ME_ICP89 & ME_MS61
analysis technique.
The laboratory reported the use of standards and blanks
as part of the analyses for QA/QC.
Standards, blanks, and field duplicates were submitted by
the company at a ratio of 1:20 samples.
All QAQC samples submitted by the company returned
results within acceptable levels of accuracy
All significant assay results have been verified against the
results reported by ALS Global Perth by two experienced
company personnel.
All primary data has been uploaded into the company’s
data storage with standard data entry protocols checked
and verified by two experienced company personnel.
ASX RELEASE | 22nd March 2024
Criteria
JORC Code explanation
Commentary
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
•
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
•
Not applicable
Sample
security
• The measures taken to ensure sample security.
•
For the current sampling program the sample chain of
custody is managed by Raiden. All samples were collected
in the field at the project site in number-coded calico
bags/secure labelled polyweave sacks by Raiden’s
geological and field personnel. All samples were delivered
directly to the associated carrier, RGR Road Haulage, by
Raiden personnel before being transported to the ALS
laboratory in Perth WA for final analysis.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
•
No review of the sampling techniques has been
undertaken.
Data spacing
and
distribution
Page 11 of 14
•
•
Sample points were determined by hand held GPS which is
considered appropriate for the reconnaissance nature of
the sampling.
Co-ordinates are provided in the Geocentric Datum of
Australia (GDA94) Zone 50.
Data spacing of these results is a mixture of 50 x 100m and
50 x 200m spacing as required to infill anomalous soil
sampling results from a soil sampling survey, at 50 x 200m
spacing, conducted in October 2023.
Not applicable due to the reconnaissance nature of the
sampling with regard to Mineral Resource classification.
ASX RELEASE | 22nd March 2024
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness
or national park and environmental settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
•
Exploration done by
other parties
• Acknowledgment and appraisal of exploration by other
parties.
•
•
A full search and compilation of historic exploration has been completed.
Work included stream sediment, soil and rock sampling, geological
mapping, geophysical surveys, drilling, resource estimation and mining
studies.
Geology
• Deposit type, geological setting and style of
mineralisation.
•
Potential for lithium-caesium-tantalum bearing pegmatite
mineralisation.
Potential for VMS style mineralisation in the northern section of the
project area.
The project area is underlain by the Archean Pilbara Craton, specifically
the West Pilbara Superterrane (WPST) of Hickman (2016). The 3280-3070
Ma WPST comprises numerous tectonostratigraphic packages (Sholl,
Regal and Karratha Terranes and the Whundo and Nickol River Basins)
and igneous complexes that have been variously affected by several
tectonic events. The easterly to east-north easterly trending Sholl Shear
Zone (SSZ) is a boundary for the regional rock packages. Metamorphic
grade is higher to the north of the SSZ, suggesting the present-day
surface shows a slightly deeper crustal level on the north side.
•
•
•
•
•
Drill hole
Information
Page 12 of 14
• A summary of all information material to the
understanding of the exploration results including a
•
Raiden Resources Ltd tenements are located in the City of Karratha, within
the Pilbara region of Western Australia.
The tenements are held by Raiden Resources Ltd 100%, (see Appendix 1:
Tenement Schedule for further detail).
Tenements are located on the Mt Welcome pastoral lease.
Raiden is not aware of any existing impediments nor of any potential
impediments which may impact ongoing exploration and development
activities at the project site.
Not applicable
ASX RELEASE | 22nd March 2024
Criteria
JORC Code explanation
Commentary
tabulation of the following information for all Material
drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why
this is the case.
Data aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
•
Not applicable
Relationship between
mineralisation
widths and intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
•
Not applicable
Page 13 of 14
ASX RELEASE | 22nd March 2024
Criteria
JORC Code explanation
Commentary
Diagrams
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
•
Balanced reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• All reported results from other companies are as they have been released
to the ASX and are referenced within this announcement.
• This announcement discusses the findings of recent reconnaissance
sampling and associated assays.
•
All the meaningful exploration data has been included in the body of
this announcement.
• The nature and scale of planned further work (eg tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
•
Raiden is currently planning further mapping programs to assess the
potential for lithium-bearing pegmatites over the distinct anomalies
defined .
Other substantive
exploration data
Further work
Page 14 of 14
Maps are included in the body of the announcement.
Share your feedback