POW Approval Unlocks Drilling at Andover Lithium Project
Released
Released
Announcement PDF
ASX RELEASE | 16 September 2024
APPROVED PROGRAM OF WORK (“POW’)
UNLOCKS DRILLING AT ANDOVER SOUTH
LITHIUM PROJECT
Highlights
•
Program of Work has been approved for tenements E47/4061
& E47/4062 for the Andover South Drilling campaign
•
Approved PoW’s were the final requirement in order to
commence with drilling over the Andover South project area
•
Management anticipate awarding of drilling and earthmoving
contractors imminently
•
Drilling operations anticipated to commence within two
weeks – allowing for mobilisation of drill rigs and completion of
access preparations
Raiden Resources Limited (ASX: RDN DAX: YM4) (“Raiden” or “the
Company”) is pleased to announce that it has received approvals for
the PoW on tenement E47/4061 & E47/4062, which is the final approval
required for commencement of drilling at the Andover South Lithium
Project (E47/4061 & E47/4062).
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
ASSET PORTFOLIO
Mr Dusko Ljubojevic, Managing Director of Raiden commented: “With
the administrative matters now completed, the entire Raiden team is
eager to mobilise the drill rigs to Andover South as quickly as possible.
We have made excellent progress in setting up the logistics and technical
planning over the past months, which will allow the team to move into
an aggressive drill testing campaign of these very exciting, high-grade
pegmatite targets. We will be announcing the award of drilling and earth
moving contracts shortly and will follow with the commencement of site
preparations.”
Page 1 of 4
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
AUSTRALIA
Li, Au, Cu, Ni & PGE
ASX RELEASE | 16 September 2024
Final Approval and Planning
The Company has received the approval for the PoW’s in regard to the planned activities on
the E47/4061 & E47/4062 tenements. With this approval, there are no further
administrative tasks outstanding and the Company can proceed with the drilling program
over the Andover South project area (E47/4061 & E47/4062). The approved PoW’s allow
management to initiate a comprehensive drill campaign over the entire Andover South
project, where high-grade pegmatites have been mapped out over a >4km strike extent2.
Management are conducting final reviews and negotiations with drilling and earth-moving
contractors, and anticipate to announce the award of these contracts imminently. Site access
and drilling operations are anticipated to commence within two weeks.
Figure 1: Raiden’s Andover South Project and adjacent Azure Minerals Ltd.’s Andover Lithium
project1,2
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
Page 2 of 4
ASX RELEASE | 16 September 2024
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
1
ASX:AZS 13 February 2024 More Very Impressive Lithium Intersections from Andover
2
ASX:RDN 22 December 2023 Independent analysis confirms five new zones at Andover
Competent Person's Statement and Previously Reported Information
The information in the referenced announcements 2 footnoted above that relate to Exploration Results has
previously been released to the ASX. The Company confirms that it is not aware of any information or data that
materially affects the information included in the market announcements, and that all material assumptions and
technical parameters underpinning the announcements continue to apply. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcements.
Appendix
Table 1: Tenement Schedule
Tenement
E47/4061
E47/4062
E47/4063
E47/3849
P47/2028
E47/4603
Holder
Pilbara Gold Corporation
Pty Ltd
(Raiden Resources Ltd.’s
100% owned subsidiary)
Grant Date
Expiry
06/08/2019 05/08/2029
30/08/2024 29/08/2029
04/04/2019 03/04/2029
16/07/2018 15/07/2028
Application
Application
Area
1Bl
2Bl
2Bl
1Bl
23.5 Ha.
7Bl
RDN
%
80%
80%
80%
80%
80%
100%
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
Page 3 of 4
ASX RELEASE | 16 September 2024
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South, Mt Sholl and Arrow lithium projects. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region
of Western Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and
deliver a significant mineral discovery.
Page 4 of 4
Share your feedback
Discover