ASX RELEASE | 29 January 2025
RAIDEN QUARTERLY ACTIVITIES REPORT
FOR PERIOD ENDED 31 DECEMBER 2024
Highlights
Andover South Project
•
•
The Company undertook the maiden drilling program over the
Andover South project area (7,041m completed in the quarter1)
Company reported a significant intercept (>250m wide) zone of
pegmatites on Target Area 7, as well as Li2O mineralised
pegmatite intercepts across target Areas 1 and 23,4
Mt Sholl Ni-Cu-PGE Project
All regulatory approvals for commencement of drilling on the Mt
Sholl Cu-Ni-PGE project were received and drill access
preparations commenced5
•
Drilling program of 10 RC holes for 2,467m was completed with
First Quantum Minerals6 financing all activities on the project
•
Arrow Gold Project
•
•
Following receipt of all necessary regulatory approvals and
heritage survey approvals, aircore drilling on the Arrow Project7
commenced
The program, for a total of 79 drill holes and 3,007m, was
completed by the middle of November 20248, financed by the
Company’s earn-in JV partner Mallina Co Pty Ltd
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
SERBIA
Cu & Au
BULGARIA
Cu, Au & Ag
Corporate
•
Company completed a raising of $10 million (before fees), from
sophisticated, professional and institutional investors9
(~$16.38M cash on hand at end of quarter)
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to
provide its report on activities and progress made during the December 2024 Quarter.
Page 1 of 13
ASX RELEASE | 29 January 2025
Exploration Activities in Western Australia
Andover Project (Lithium)
During the quarter the Company initiated the maiden drilling program over the Andover
South lithium-bearing pegmatite targets at the Andover South Project area (E47/4061 &
E47/4062)1. The program was executed by multiple diamond drill rigs and >7,000 metres
of diamond drilling was completed by the end of the quarter.
The program focused on the highest priority targets, which were defined on the basis of
field work executed over the previous year. The initial key targets were Target Areas 1 and
2, which are characterised by outcropping, highly fractionated pegmatites and that
yielded high-grade Li2O rock samples over a multi kilometre trend.
The Company further expanded the drilling program to drill test Target Area 3 with a
single drill hole, as well as Target Area 7, where 4 drill holes were completed by the end
of the quarter.
Figure 1: Raiden’s Andover South Project and adjacent SH Mining Pty Ltd’s (previously Azure
Minerals Ltd) Andover Lithium project10
Page 2 of 13
ASX RELEASE | 29 January 2025
Figure 2: Andover South Project – zones of interest based on fractionation analysis of pegmatites,
with recently defined zone 7 highlighted in red11
During the quarter, the Company provided updates in regard to ongoing drilling progress
on the project and available results.
Target Area 7
The first diamond drillhole completed in Area 7, ASDD0233, intersected a broad zone of
what are interpreted to be a multi-phase pegmatite, hosted by biotite-altered porphyritic
dykes and intrusions. Individual pegmatite intersections within the zone are up to 57m
thickA. Management’s current interpretation, is that these pegmatites are hosted within a
significant structural corridor, which has accommodated significant pegmatitic intrusions.
A
Downhole width is not equivalent to true thickness. Structural measurement and
analysis of drill core is ongoing to establish the true orientation of the pegmatite.
Page 3 of 13
ASX RELEASE | 29 January 2025
Figure 3: Interpreted cross-section of drill hole ASDD023A,3
A
Downhole width is not equivalent to true thickness. Structural measurement and analysis
of drill core is ongoing to establish the true orientation of the pegmatite.
The second hole drilled in Target Area 7, ASDD0254, is located approximately 315m along
strike to the southeast of ASDD023. ASDD025 has intersected a swarm of pegmatites
extending across 250 metresA downhole. The Company believes that this swarm of
pegmatites may represent the strike extension of the pegmatite zone intercepted in
ASD0023.
Page 4 of 13
ASX RELEASE | 29 January 2025
Target Area 1 and 2
During the quarter assays received for the first 12 holes of maiden drill program at
Andover South, where Initial drilling concentrated in the centre of tenement E47/4062 in
Target Area 1 and 2. Widest intersection reported was 15.3 metresA @ 0.53% Li2O and
highest individual grade assays above 2% Li2O3.
Initial interpretation indicates that the pegmatite system in this area dips at a very shallow
angle to the north and is hosted within massive and structurally undisturbed gabbro. This
low-angle dip deviated from field observations to date, where steeply dipping pegmatites
(that dip to the north and to the south) have been observed. Further pegmatite
intersections at greater depths point to a potential stacked system with the potential for
repetitions at depth.
On the basis of these observations and the intercept of a major pegmatite-bearing zone
within Target Area 7, management believe that the drilling to date conducted at Andover
South Target Area 1 and 2 has only tested the upper parts of the system and the main
structural targets remain untested and potentially located further south from limits of
current drilling.
Mt Sholl Project (Ni-Cu-PGE)
During the quarter, the Company announced receipt of the final heritage report for the
Mt Sholl Project from the Ngarluma Aboriginal Corporation (NAC), which indicated that
no areas of cultural heritage would impact on the planned drilling program5. Furthermore,
the PoW for the planned program was approved. First Quantum Minerals commenced the
drilling program on the Mt Sholl project, with 2,467 metres of Reverse Circulation drilling
completed in 10 holes by the end of the working season in December. The program was
designed to test new targets defined by First Quantum Minerals, as well as direct
extensions of the mineral resource and the JORC Exploration Target previously defined by
the Company. The program was managed and financed by First Quantum Minerals under
the MOU in place relating to the Mt Sholl project6. The results are expected in February
2025.
Page 5 of 13
ASX RELEASE | 29 January 2025
Figure 4: : Mt Sholl project area with JORC (2012) mineral resource of 23.4Mt @ 0.60% Ni_Eq or
1.54%Cu_Eq2 and pit (0.35% Ni_Eq cut-off) locations12
Arrow Project (Gold)
During the quarter, the Company announced that it had received all necessary regulatory
approvals and heritage survey approvals for the Arrow gold project and that the Joint
Venture partner (Mallina Co Pty Ltd)13 had commenced with an aircore (“AC”) drilling
campaign on the Arrow Gold Project.
The objective of the AC drilling program was to evaluate Hemi-style orogenic gold targets
previously identified by Raiden on tenement E47/3476. These targets are associated with
felsic magnetic intrusive bodies, shear zones and hydrothermal alteration14.
Page 6 of 13
ASX RELEASE | 29 January 2025
The drilling program, was completed during the quarter8 and comprised of 79 drill holes
for 3,007m, targeting six areas considered prospective for this style of mineralisation,
which were previously based on soil sampling programs and magnetic data evaluations.
The samples have been dispatched to the laboratory for analysis. The Company will
provide an update to the market once the results are available, expected February 2025.
Figure 5: Arrow Gold Project Location in relation to nearby gold prospects15
Other Australian Projects
Management continued to engage with potential partners regarding the divestment and
partnerships regarding non-core assets in Australia.
Page 7 of 13
ASX RELEASE | 29 January 2025
Exploration Activities in Bulgaria and Serbia
Vuzel (Gold/Silver)
During the quarter, the Company undertook no further field activities on the project. The
Company continued planning activities in regard to a drilling program scheduled to
commence in Q1’2025. The Company has expanded the planned drilling program on the
project for up to 3,000 metres from the initial 1,000 metres planned.
Other Bulgarian Projects
No further activities were undertaken during the quarter.
Donje Nevlje (Copper/Gold)
No activities were undertaken on the project during the quarter.
Corporate
Performance Rights
As at 31 December 2024, the Company had 1,500,000 Performance Rights (issued in 2023).
Options Exercised
During the quarter the Company raised approximately $5.1m from exercise of 341,002,319
listed RDNOA options at exercise price of $0.015 with an expiry date of 30 November
2024.
Capital Raising
On the 18th of October, the Company announced9 that it raised a total of $10M through
the issue of 312,500,000 fully paid ordinary shares (Shares) at an issue price of 3.2c per
share (Placement).
Page 8 of 13
ASX RELEASE | 29 January 2025
Summary of Expenditure
Of the total expenditure of the Company during the Quarter, $2.66m of the Company’s
expenditure was on activities related to the exploration of the current projects as detailed
in the Cashflow Report (5B) appended to this report. The Company did not incur any
expenditure related to mining, production and development activities during the Quarter.
In accordance with ASX Listing Rule 5.3.5 payments totalling approximately $170k were
made to related parties of the Company, comprising $133k for Managing Director and
Non-Executive Director fees and $37k for accounting and company secretarial fees
(section 6.1 of the accompanying 5B).
Tenement Table: ASX Listing Rule 5.3.3
Mining tenement interests held at the end of the quarter and their location:
Location
Tenement reference
Status
Inter
est
Direct
Renewal pending
100%
Direct
Renewal pending
100%
Direct
Renewal pending
100%
Donje Nevlje 310-021547/2015-02
Zapadni Majdanpek
310-02-1096/2016-02
Zlatusha (Bulgaria) –
Licence No. 486
BG1 (Bulgaria) –
Permit No. 527
Mt Sholl (E47/4309)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3468)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/2024)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3181)
Western Australia
Direct
Granted
100%
Western Australia
Direct
Granted
100%
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1787)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1788)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1789)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1790)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1791)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1792)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1793)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1794)
Western Australia
Direct
Granted
100%
Mt Sholl (P47/1795)
Western Australia
Direct
Granted
100%
Mt Sholl (E47/3339)
Mt Sholl (P47/1762)
(b)
Serbia
Nature
Serbia
Bulgaria
Bulgaria
Direct
Pending
100%
Page 9 of 13
ASX RELEASE | 29 January 2025
Location
Yandicoogina(M45/115)
Western Australia
Direct
Granted
Inter
est
100%
Yandicoogina (M45/987)
Western Australia
Direct
Granted
100%
Arrow (E47/3476)
Western Australia
Direct
Granted
100%
Arrow (E47/3478)
Western Australia
Direct
100%
Pyramid (E47/4300)
Western Australia
Direct
Granted – currently subject to
Forfeiture after a recent Wardens
Court decision rejecting Raiden’s
Expenditure Exemption
application. Raiden are currently
following due process to resolve
this issue
Granted
Andover (P47/2028)
Western Australia
Direct
Granted
80%
Andover (E47/3849)
Western Australia
Direct
Granted
80%
Andover (E47/4061)
Western Australia
Direct
Granted
80%
Andover (E47/4062)
Western Australia
Direct
Granted
80%
Andover (E47/4063)
Western Australia
Direct
Granted
80%
Tenement reference
Nature
Status
100%
Mining tenement interests relinquished during the quarter and their location:
Nil
Mining tenement interests acquired during the quarter and their location:
Nil
Mining tenement interests under application during the quarter and their location:
Tenement reference
Majdanpek Pojas - 310-02-1999
/2020-02
Tabba Tabba (E45/6701)
Location
Nature
Status
Interest
Serbia
Direct
Application - pending
100%
Western Australia
Direct
Application - pending
100%
Pyramid (E47/4307)
Western Australia
Direct
Application - pending
100%
Andover (E47/4603)
Western Australia
Direct
Application - pending
100%
Western Australia
Direct
Application - pending
100%
Western Australia
Direct
Application – pending
100%
Andover (E47/5038)
Mt Sholl (M47/1651)
(b)
Beneficial percentage interests held in farm-in or farm-out agreements at the end
of the quarter:
Page 10 of 13
ASX RELEASE | 29 January 2025
Tenement reference
Vuzela (Bulgaria) – Licence No. 522
Location
Nature
Status
Interest
Bulgaria
Joint Venture
Granted
51%
a The Company has an agreement to earn-in up to 90% position within the project. At the end of the quarter the
Company held 51% interest in Vuzel Minerals EOOD, which holds the Vuzel licence.
(b) The Company holds 100% in tenement P47/1762 which is being converted into M47/1651, application pending.
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly, or in the commentary of, this quarterly activities release
ASX:RDN 06 December 2024 Andover South and Capital Structure Update
1
ASX:RDN 14 October 2024 $10m institution led raise to accelerate and expand drilling
2
ASX:RDN 26 November 2024 Significant pegmatite system intercepted at Andover South
3
ASX:RDN 29 November 2024 Pegmatite extensions confirmed & visible spodumene in core
4
ASX:RDN 28 October 2024 Mt Sholl Cu-Ni-PGE Drilling Program Gets the Green Light
5
ASX:RDN 13 December 2023 Raiden enters strategic partnership with FQM at Mt Sholl
6
ASX:RDN 05 November 2024 Arrow gold project drilling program commences
7
ASX:RDN 18 November 2024 Arrow gold project drilling update
8
ASX:RDN 18 October 2024 $10 million institution led placement completed
9
ASX:RDN 27 September 2024 Andover South preliminary structural interpretation
10
ASX:RDN 23 September 2024 Mapping confirms new high-priority target zone at Andover
11
ASX:RDN 03 April 2023 Maiden Mineral Resource Estimate & JORC Exploration Target
12
Page 11 of 13
ASX RELEASE | 29 January 2025
ASX:RDN 09 May 2024 Raiden enters into option agreement over Arrow Gold Project
13
ASX:RDN 16 March 2022 Drilling results from Arrow Project and Company Update
14
ASX:DEG 21 November 2023 Hemi Gold Project Resource Update – November 2023
15
Competent Person's and Compliance Statement
The information in the referenced announcements 3,4,5,7,8,10,11,12 and 14 footnoted above that relate to
Exploration Results have previously been released to the ASX. The Company confirms that it is not aware of
any information or data that materially affects the information included in the market announcements, and
that all material assumptions and technical parameters underpinning the announcements continue to apply.
The Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original market announcements.
Mineral Resources
The Company confirms it is not aware of any new information or data that materially affects the information
included in the 3 April 2023 (Maiden Mineral Resource Estimate and JORC Exploration Target) Mineral
Resource estimate and all material assumptions and technical parameters underpinning the estimate
continue to apply and have not materially changed when referring to its resource announcement made on
3 April 2023. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcements
Mt Sholl Mineral Resource Estimate by classification reported above a 0.35% Ni_Eq cut-off for open pit
resources and at 0.5% Ni_Eq for underground resources as reported on 3 April 2023.
Mineral Resources Estimate (as at 30 March 2023)
Tonnes
Mt
Ni
%
Cu
%
Co
ppm
3E1
g/t
Ni Metal
kt
Cu Metal
kt
3E
(Pd, Pt,
Au)
oz
Indicated
10.5
0.39
0.45
134
0.32
41.0
47.3
108,031
Inferred
9.8
0.29
0.32
78
0.32
28.4
31.3
100,715
Total
20.3
0.34
0.39
107
0.32
69.34
78.6
208,745
3.1
0.48
0.47
57
0.25
14.9
14.6
24,898
Classification
Open Pit
Underground
Inferred
Notes:
•
Mineral Resources are reported in accordance with the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (The Joint Ore Reserves Committee Code
–JORC 2012 Edition).
•
Data is reported to significant figures and differences may occur due to rounding.
•
Mineral Resources have been reported above a cut-off grade of 0.35 % Nickel equivalent for open
pit resources and above 0.5% Nickel equivalent for underground resources.
Page 12 of 13
ASX RELEASE | 29 January 2025
•
Bulk densities in the Basal unit are 3.06 and in Zone2 are 2.91. These figures represent averages of
the values collected in the respective domains from the 2022 drill program.
•
The Ni_Eq calculation represents total metal value for each metal summed and expressed in
equivalent nickel grade and tonnes.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All of such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned
mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be
refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility
studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to
failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining
governmental approvals or in the completion of development or construction activities, and (vi) other risks
and uncertainties related to the Company’s prospects, properties and business strategy. Investors are
cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and the Company does not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or nonoccurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed transition energy-metal—gold exploration
Company focused on exploring and developing the Andover Lithium project, the Mt Sholl Lithium project
and the Mt Sholl Ni-Cu-Co-PGE deposit in the Pilbara region of Western Australia. The Company also has a
significant portfolio of exploration projects in WA, including the Arrow Lithium and Gold projects, which
gold project is located 30km along strike from the Hemi discovery. In the emerging and prolific Western
Tethyan metallogenic belt in Eastern Europe, the Company has established a significant exploration
footprint in Serbia and Bulgaria. The Directors believe that the Company is well positioned to unlock value
from this exploration portfolio and deliver a significant mineral discovery.
Page 13 of 13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity:
RAIDEN RESOURCES LIMITED (RDN)
ABN
Quarter ended (“current quarter”)
68 009 161 522
31 December 2024
Current quarter
$A’000
Year to date
(6 months)
$A’000
(2,661)
(3,599)
(b) development
-
-
(c) production
-
-
(d) staff and board remuneration
(68)
(130)
(e) administration and corporate costs
(457)
(766)
-
-
79
125
Consolidated statement of cash flows
1.0
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for:
(a) exploration & evaluation
1.3
Dividends received
1.4
Interest and other items of a similar nature received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other - Loan Repayment from Balkan Mineral
Development
-
-
1.8
Other - FQM
-
151
1.9
Net cash from / (used in) operating activities
(3,107)
(4,219)
2.0
Cash flows from investing activities
2.1
Payments to acquire:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration if capitalised
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date
(6 months)
$A’000
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received
-
-
2.5
Other
-
-
2.6
Net cash from / (used in) investing activities
-
-
3.0
Cash flows from financing activities
3.1
Proceeds from issues of equity securities (excluding
convertible debt securities)
10,000
10,000
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
3.2
Proceeds from issue of convertible notes
-
-
3.3
Proceeds from exercise of share options
5,104
5,544
3.4
Transaction costs related to issues of shares,
convertible notes or options
(663)
(665)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (proceeds from unissued shares)
-
11
3.1
0
Net cash from / (used in) financing activities
14,441
14,890
4.0
Net increase / (decrease) in cash and cash
equivalents for the period
11,334
10,671
4.1
Cash at beginning of quarter/year to date
5,044
5,710
4.2
Net cash from / (used in) operating activities (item 1.9
above)
(3,107)
(4,219)
4.3
Net cash from / (used in) investing activities (item 2.6
above)
-
-
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
14,441
14,890
4.5
Effect of movement in exchange rates on cash held
2
(1)
4.6
Cash and cash equivalents at end of period
16,380
16,380
*Refer additional information provided at 8.2.2 below
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
5.0
Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the related
items in the accounts
Current quarter
$A’000
Previous
quarter
$A’000
16,380
5,044
5.1
Bank balances
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
16,380
5,044
*Refer additional information provided at 8.2.2 below
6.0
Payments to related parties of the entity and
their associates
6.1
Aggregate amount of payments to the parties in
item 1.2
6.2
Current quarter
$A'000
170
-
Aggregate amount of cash flow from loans to these
parties included in item 2.3
-
-
6.3
Include below any explanation necessary to
understand the transactions included in items 6.1 and
6.2
-
-
6.4
Payment for executive salary and non executive
director fees and payments to Onyx Corporate Pty
Ltd for accounting and company secretarial fees.
170
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Payment of executive salary and non-executive director fees ($133,332), and payments to related parties for accounting and
company secretarial services ($37,000).
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.0
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the sources of
finance available to the entity.
Total facility
amount at
quarter end
$A’000
Amount
drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Include below a description of each facility above,
including the lender, interest rate and whether it is
secured or unsecured. If any additional facilities have
been entered into or are proposed to be entered into
after quarter end, include details of those facilities as
well.
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing facilities
have been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
-
N/A
8.0
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(3,107)
8.2
Capitalised exploration & evaluation (Item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(3,107)
8.4
Cash and cash equivalents at quarter end (item 4.6)
16,380
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by item 8.3)
-
16,380
5.27
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date: 29 January 2025
Authorised by: the Board of Raiden Resources Limited
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been aut
Share your feedback
Discover