Andover South Drilling Update
Released
Released
Announcement PDF
ASX RELEASE 7 November 2024
ANDOVER SOUTH DRILLING UPDATE
Highlights
Andover South Project
•
Maiden diamond program ongoing with 2 drill rigs on targets 1
and 2 - program expanded to test further target areas1
•
To date ∼3,500 metres of diamond drilling has been completed
on Andover South lithium project
•
Initial batch of samples from the first 12 drill holes (2240.4 metres
drilled) have been dispatched to the laboratory in Perth for
analysis
•
First assay results are anticipated during November and results
will be made public as soon as they are received, quality
controlled and analysed
•
Access preparations are ongoing on target areas 3,4 and 7 for
maiden drill testing in conjunction with target areas 1 and 21.
Raiden Resources Limited (ASX: RDN DAX: YM4) (“Raiden” or “the
Company”) is pleased to provide an operational update in regard to
the Andover South lithium drilling program.
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
Mr Dale Ginn
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“The drilling productivity on the Andover South Lithium project has been
expedited with the arrival of the second drill rig. Operations are
proceeding on schedule and budget. The first batch of samples have been
dispatched to the laboratory for assay analysis. Based on the anticipated
timetable the Company expects results to be on track for release within
November.”
Page 1 of 4
SERBIA
Cu & Au
ASX RELEASE 7 November 2024
Figure 1: Andover South lithium project location in relation to associated infrastructure and portfolio
projects
Andover South Lithium Project Drilling Program
Approximately 3,500 metres have been completed to date and the drilling is ongoing across
target areas 1 and 2 (refer to figure 2)1. The drilling program has been expanded to include
testing of targets on target areas 3, 4 and 71 and access preparations are underway. An initial
batch of core has been submitted to the laboratory in Perth for assay analysis and comprises
of samples from the initial 12 drill holes, totalling 2240.4 metres of drilling. As soon as the
results are received and analysed, they will be released to the market. Management will
continue to dispatch samples from the program on an ongoing basis, in order to provide
guidance to the technical team leading the program.
Page 2 of 4
ASX RELEASE 7 November 2024
Figure 2: Arrow South project target areas1
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
info@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
1
ASX:RDN 23 September 2024 Mapping confirms new high-priority target zone at Andover
Page 3 of 4
ASX RELEASE 7 November 2024
Competent Person's Statement and Compliance Statement
The information referenced in announcements footnoted as 1 above that relates to Exploration Results has
previously been released to the ASX. The Company confirms that it is not aware of any information or data
that materially affects the information included in the market announcements, and that all material
assumptions and technical parameters underpinning the announcements continue to apply. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed lithium, base metal—gold exploration
Company focused on the Andover North-South, Mt Sholl and Arrow lithium projects. The Company also holds
the rights to the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region
of Western Australia. In addition, the Company holds the rights to multiple projects in the emerging and prolific
Western Tethyan metallogenic belt in Eastern Europe, where it has established a significant exploration
footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 4 of 4
Share your feedback
Discover