Potential epithermal feeder zone intersected at Vuzel
Released
Released
Announcement PDF
ASX RELEASE | 19 June 2025
POTENTIAL EPITHERMAL FEEDER ZONE
INTERSECTED AT VUZEL
QUICK STATS
HIGHLIGHTS
•
•
•
•
ASX Code: RDN
A visually distinct zone has been intersected in drilling, which is
currently interpreted as a potential epithermal feeder structure.
Assays are pending to confirm the nature and grade of mineralisation.
The intersection of a potential epithermal feeder structure,
combined with persistent drilling success, validates Raiden’s
exploration model at Vuzel and supports the view Vuzel hosts an
extensive, near-surface gold system with the potential of a highgrade component.
Assay results from a further 5 holes have been received from the
ongoing Phase 2 drilling program, with all holes drilled and
reported to date continuing to intersect near surface gold
mineralisation. Significant intersections includeA:
o VZ2520: 19.6m @ 0.54g/t Au from 0.0m
▪ Including 2.0m @ 2.61g/t Au from 12.0m
o VZ2523: 4.1m @ 1.25g/t Au from 78.6m
▪ Including 1.2m @ 3.60g/t Au from 80.3m
Latest drilling has intercepted gold mineralisation ~600m east of the
last reported drill holes on the project significantly expanding the
known footprint of mineralisation.
DAX Code: YM4
BOARD &
MANAGEMENT
Non-Executive Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
• The Phase 2 drilling program has recently been expanded from 2,000m to 4,000m6, which is
expected to refine targeting of further epithermal feeder structures.
• The near surface, shallow dipping to sub-horizontal nature of the mineralisation will allow for
rapid, cost-effective follow up drilling to explore the full extent of the mineralised system.
The Phase 2 program is focused on 3-4km of strike of the target area (Figure 1).
• Vuzel is located <20km from Gorubso-Kardzhali A.D.’s (a private Bulgarian Mining company)
gold processing facility3, whom is also a 30% partner of TSX-V Velocity Minerals, whose
Bulgarian assets, including the Rozino deposit (573Koz @ 0.8g/t Au) was recently subject of
P 08 6158 9990
Suite 7, 63 Shepperton Road, Victoria Park, WA 6100
ABN 68 009 161 522
Page 1 of 19
ASX RELEASE | 19 June 2025
US$59M4 acquisition by Türker Mining, a subsidiary of Turkish conglomerate Türkerler
Holding.
• Engage directly with us by commenting on our latest announcements via InvestorHub. You can
view and comment on this announcement here.
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to report further
assay results received from the ongoing 2025 Phase 2 diamond drilling program on the Vuzel Gold
Project (“Vuzel”) in south-eastern Bulgaria.
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“While it’s still early to draw firm conclusions, the intersection of a visually distinct brecciated zone
interpreted as a potential feeder structure, combined with consistent gold mineralisation in all holes
across the maiden and Phase 2 drilling campaigns, is highly encouraging. These results not only support
our view that Vuzel may host an extensive near-surface gold system with a potential for a high-grade
component, but also further validates our exploration model.
With the Phase 2 drilling program recently expanded from 2,000m to 4,000m, we aim to further refine
targeting of potential epithermal feeder structures, and I look forward to keeping shareholders updated
as the program advances.”
Vuzel Phase 2 drilling program update
The Phase 2 drilling campaign has subsequently been expanded to 4,000m 6, with the aim of
extending the mineralised footprint along strike and testing further targets within the 3-4km
mineralised corridor. This follows Raiden successfully meeting the investment criteria for a 75%
ownership in the Vuzel Project7. Raiden retains a pathway to 90% ownership through the definition
of a JORC resource.
This is the second drill campaign and extends over several kilometres and is characterised by near
surface gold mineralisation, including high-grade sections defined drilling completed by Raiden.
The latest set of assay results has significantly expanded the footprint of mineralisation, with drill
holes VZ2522/23/24 intercepting similar styles of mineralisation intercepted and reported in the
previous release8. The aforementioned drill holes stepped out approximately 600 metres east of the
previously reported drill holes, which are located in the central area of the prospective zone. These
results reaffirm that the gold system at Vuzel extends over a significant strike length.
Significant intersections from the latest batch of assay results of from the Phase 2 drilling program
include:
Page 2 of 19
ASX RELEASE | 19 June 2025
o VZ2520: 19.6m @ 0.54g/t Au from 0.0m
▪ Including 2.0m @ 2.61g/t Au from 12.0m
o VZ2523: 4.1m @ 1.25g/t Au from 78.6m
▪ Including 1.2m @ 3.60g/t Au from 80.3m
Drilling is ongoing with the expanded 4,000m program. In addition to the completed holes with
reported results, samples from further drill holes have assays pending.
Furthermore, drilling has intercepted a distinct silicified and brecciated zone, which is interpreted to
be a potential epithermal feeder zone, which may be a source of the mineralisation on the Vuzel
project. While no assay results are currently available for this intercept, management is encouraged
that it may be vectoring into one of these zones. Understanding the orientations of these zones is
one of the key objectives of the current drilling program. The team is currently relogging all drill core
with the objective of identifying these trends and associations with the high-grade drill intercepts
encountered to date. Ongoing work is aimed at determining if multiple feeder zones are present
within the system.
Figure 1: Drill core from VZ2527 (52- 55.6m). The drill core is characterised by a silica altered breccia. There
is no evidence yet that the feeder zone is mineralised and no mineralisation has been observed in it.
Page 3 of 19
ASX RELEASE | 19 June 2025
Figure 2: Vuzel Exploration permit, structures, geology and exploration targets.
Page 4 of 19
ASX RELEASE | 19 June 2025
Figure 3: Vuzel Central Zone Drill plan and drillhole locations over 1.5km strike.
Gold mineralisation at Vuzel is associated with zones of oxidised, silicified conglomerates and
sandstones with quartz-mica-pyrite and silica-clay-pyrite alteration assemblages. Certain portions of
the system are characterized by higher gold grade intercepts, up to 24g/t Au over 1.5m in certain
intervals, while the more peripheral zones, showing sericite-clay-chlorite and mica-clay assemblages,
tend to be characterized by lower grades of up to 1-2 g/t Au.
Page 5 of 19
ASX RELEASE | 19 June 2025
Figure 4: Long section indicating the interpreted breccia zone, which may be the epithermal feeder structure
and a potential pathway for mineralised fluids.
Page 6 of 19
ASX RELEASE | 19 June 2025
Figure 5: Cross section and interpreted mineralisation with intercepts at the Vuzel Gold Project.
From the relatively limited drilling to date, the current interpretation is for mineralisation to be
preferentially developed along the sub-horizontal conglomerate units, in the vicinity of the
intersections with steep dipping faults. In this scenario the faults represent feeder structures for the
mineralising hydrothermal fluids, which then allow fluids to flow into the permeable conglomerate
units, where changes in chemistry pressure or other physical and chemical conditions allow the gold
and associated minerals to drop out of solution.
Vuzel Next Steps
The Company will continue to roll out the expanded Phase 2 drilling program, which is aimed at
defining the extent of the mineralisation across the deposit area within the broader 3-4km anomalous
corridor. The targeting of potential high-grade feeder structures is also being prioritised. The results
of this expanded 4,000m program will guide any further potential future drill planning, which may
also provide further guidance on the orientation and targeting of the feeder structures within the
sedimentary package, which may host higher gold grades.
Page 7 of 19
ASX RELEASE | 19 June 2025
Should exploration ultimately confirm a viable mineral resource, Raiden believes that the project's
proximity to third-party processing infrastructure and other deposits may provide potential synergies,
subject to further technical and economic assessments.
The type of geology and setting at Vuzel is similar to that of the epithermal low sulphidation Ada
Tepe deposit, which is currently being mined by Dundee Precious Metals only 30km south-east of
Vuzel (see Figure 6) (TSX: DPM). Vuzel is located <20km from Gorubso-Kardzhali A.D. (a Bulgarian
Mining company) gold processing facility3, whom is also a 30% partner of TSX-V Velocity Minerals
whose Bulgarian portfolio, including the Rozino deposit (573Koz@0.8g/t Au) was recently subject of
a US$59M4 acquisition by Türker Mining, a subsidiary of the Turkish conglomerate Türkerler Holding.
Raiden believes that targeted follow-up exploration and the strategically planned Phase 2 drill
campaign at Vuzel present a compelling exploration opportunity. Raiden looks forward to providing
further updates as the program progresses.
Figure 6 - Location of Vuzel project in Southern Bulgaria in relation to other operating and historical mine
and prospects.
Page 8 of 19
ASX RELEASE | 19 June 2025
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
We value your feedback and questions.
Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
Page 9 of 19
ASX RELEASE | 19 June 2025
ASX Announcements referenced in this release
ASX:RDN 27 March 2025 Raiden Commences Phase 2 Drilling at Vuzel Gold Project
1
ASX:RDN 06 July 2022 Gold Discovery at Raiden’s Vuzel Project in Bulgaria
2
ASX:RDN 12 June 2019 Raiden Reports on Historical Drill and Trench Data on Vuzel Project in Bulgaria
5
ASX:RDN 03 June 2025 Raiden Expands Phase 2 Drill Program at Vuzel Gold Project
6
7
ASX:RDN 22 May 2025 Raiden Meets Investment Criteria to Earn 75% at Strategic Vuzel Gold Project
8
ASX:RDN 19 May 2025 Drilling Confirms Potential significant shallow Au System
Other releases and material referenced in this release
https://velocityminerals.com/projects/overview/
3
TSXV: VLC 28 February 2025 Velocity Enters into Definitive Agreement to Sell All Bulgarian Assets
4
Competent Person's and Compliance Statement
The information previously released to the ASX and referenced in footnotes 1,2, 5 and 8 above relate to exploration results
that have previously been released on the ASX. The Company confirms that it is not aware of any information or data that
materially affects the information included in the market announcements, and that all material assumptions and technical
parameters underpinning the announcements continue to apply. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market announcements.
The information in this announcement that relates to exploration results (including JORC tables) is based on and fairly
represents information and supporting documentation prepared, reviewed and approved by Mr Sean Halpin, a competent
person who is a member of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin is employed by Raiden Resources
Limited. Mr Sean Halpin has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
JORC Code. Mr Sean Halpin has provided his prior written consent as to the form and context in which the exploration results
and the supporting information are presented in this announcement.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”, “believe(s)”,
“will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forward-looking statements.
These statements include, but are not limited to statements regarding future production, resources or reserves and
exploration results. All of such statements are subject to certain risks and uncertainties, many of which are difficult to
predict and generally beyond the control of the Company, that could cause actual results to differ materially from those
expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties
include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of
mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade,
planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined,
(iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks
related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing
on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects,
properties and business strategy. Investors are cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and the Company does not undertake any obligation to revise and
Page 10 of 19
ASX RELEASE | 19 June 2025
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the
occurrence of or non-occurrence of any events
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed base metal & gold exploration Company focused on
identifying and discovering significant and economically attractive mineral deposits. Driven by a passion for unlocking
discoveries that create shareholder value and the support of a strong corporate treasury, Raiden is committed to achieving
exploration success.
The Company’s portfolio of projects includes the Andover South lithium project. The Company also holds the rights to
the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region of Western Australia.
In addition, the Company holds the rights to multiple projects in the emerging and prolific Western Tethyan metallogenic
belt in Eastern Europe, where it has established a significant exploration footprint in Bulgaria.
Table 1: List of drilled holes and intercepts completed at the Vuzel Project as part of this announcement
WGS/UTM
Hole ID
WGS/UTM
RL
Azimuth
Dip
516
320
-50
VZ2520
366881
Z35N
NORTH
4619220
VZ2521
366880
4619218
516
50
-50
VZ2522
367424
4619069
529
110
-50
VZ2523
367319
4618854
517
255
-50
VZ2524
367318
4618858
515
159
-50
VZ2525
VZ2526
VZ2527
VZ2528
366503
366502
366477
366485
4619279
4619283
4619345
4619047
518
525
517
522
140
90
90
130
-45
-50
-50
-50
Z35N EAST
Total
Depth
(m)
150
including
and
including
100
including
and
including
150
including
and
100
including
and
including
150
including
200
150
150
150
From
(m)
Length
(m)
0.0
12.0
64.3
69.7
4.7
6.8
46.0
58.7
0.0
0.0
8.9
10.7
15.7
78.6
80.3
8.0
30.0
19.6
0.54
2.0
2.61
29.2
0.40
4.8
0.96
12.0
0.33
3.5
0.69
16.0
0.31
3.3
0.67
5.0
0.35
3.0
0.51
19.1
0.16
9.9
0.20
1.0
0.55
4.1
1.25
1.2
3.60
28.6
0.19
4.0
0.42
Assays pending
Assays pending
Assays pending
Assays pending
Au ppm
Notes:
•
All collar locations are reported as WGS / UTM Zone 35 N.
•
Reported intercepts are estimated above a 0.1 ppm cut-off grade (COG).
•
Maximum internal dilution below the applied COG included in the reported intercepts is 3.8m.
Page 11 of 19
ASX RELEASE | 19 June 2025
Table 2: JORC Code, 2012 Edition. Section 1.
Criteria
JORC Code explanation
Commentary
• Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling
• Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used
• Aspects of the determination of
mineralisation that are Material to the
Public Report
• In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc)
• Sampling comprises only wireline diamond
drilling core in PQ and HQ diameter sizes
• Core was drilled through the full expected
mineralisation intersection, as normal to the
strike as possible, in accordance with the
initial interpretation of the expected
mineralisation
• Half core HQ or quarter core PQ core, cut
along the core axis, has been used for
sampling, comprising the full downhole
length
• If the core is strongly fractured, the material
is sampled with a trowel
• All geological breaks, including lithology,
alteration, oxidation, etc., are considered in
the process of sample length selection
• The average down-hole sample length is
between 1m and 3m. In relatively rare
cases the length is below or above the
minimum and maximum, depending on the
geology and mineralization potential of the
interval
• Individual sample weights are between 4-6
kg
• All sampling practices meet industry
standards
• Drilling
techniques
• A total of 15 drill holes with a total length of
1,900m have been completed to date in
2025-year drilling campaign
• A total of 4,000m are planned to be drilled
for 2025.
• The drilling campaigns are targeting zones
of gold mineralization, initially outlined by
earlier exploration activities including
mapping, soil sampling, trenching and
historical drilling
• In order to enhance the drilling efficiency
and core recovery, a triple tube and drilling
fluid additives such as polymer and
bentonite, were used
• All of the drilling is inclined, predominantly
dipping at 50 degrees. The drill hole collars
were designed in accordance with the initial
interpretation of the mineralization zone,
aiming to intercept it as close to true
thickness as possible
• Each hole has a down-hole survey, made
approximately at 25m intervals using a
Page 12 of 19
ASX RELEASE | 19 June 2025
Criteria
JORC Code explanation
Commentary
digital down-hole survey tool (“DeviShot”)
• The used drilling equipment is in good
condition, provided and operated by local
drilling subcontractor, with wide experience
in SE Europe (“Geops”)
• Drill sample
recovery
• Method of recording and assessing
core and chip sample recoveries and
results assessed
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material
• Core recovery is logged as percent of the
core recovery length versus drill run length,
and it is logged directly in the core boxes,
immediately after the core is transported to
the field core shed
• Through the drilling process, to maximize
the core recovery, triple core tube and
additive drilling muds and polymers were
used
• Overall diamond core recovery is above
90%
• There doesn’t appear to be a relationship
bias between grade and length, or sample
weight and recovery
• Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the
relevant intersections logged
• Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
• Core logging by competent trained
geologists includes lithology, hydrothermal
alteration, mineralization, oxidation stage,
core recovery, RQD and degree of
fracturing, structural logging
• 100% of the core is photographed
• 100% of the drilled core has been logged
• Each day the drill core is transported to the
company’s core storage facility in the
village of Stremci, located approximately
5km from the field, for logging and sampling
• The core trays are plastic, including plastic
covers to protect the core from damage
during transport
• After drilling the hole, the collar was capped
and labeled
• Core logging is done on laptops, using MS
Excel spread sheets, and the data is then
incorporated into the company’s database
• Photo documentation is done on wet trays,
and the data is also incorporated in the
database
• Logging procedures meet industry
standards, and are appropriate for further
Mineral Resource Estimation and studies
• All of the current drilled core is sampled.
• All intact core samples are cut along the
long axis, using a core saw, half core HQ
(or quarter PQ) is packed in a labeled bag,
weighed, and further transported to
laboratory for sample processing and
assaying. In case of intensively fractured
zones, samples are taken with a trowel
• Rock density measurements were not
completed, although intervals, with length of
Page 13 of 19
ASX RELEASE | 19 June 2025
Criteria
• Quality of
assay data
and laboratory
tests
JORC Code explanation
Commentary
representivity of samples
• Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling
• Whether sample sizes are appropriate
to the grain size of the material being
sampled
10cm, in a step of between 5 and 10m were
selected in the process of core logging for
density measurement
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times, calibrations
factors applied and their derivation,
etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and
precision have been established
• All samples are transported to ALS
Romania - Rosia Montana, where they are
pre-processed and assayed
• Through the sample preparation process,
the entire sample is crushed to passing
70% at < 2mm and then pulverize up to
250g with 85% passing 75 um. The pulp is
analyzed with Fire Assay-Atomic
Absorption Ore Grade Method: Au-AA25
• The lower detection limit of the laboratory is
0.01 ppm Au
• The Quality Assurance and Quality Control
scheme (QA/QC) comprises approximately
20 % from the total assays (each 5-th
sample is QAQC), including blanks,
reference material standards (CRMs) and
field duplicates
• The received results of the CRMs (Geostat
PTY and OREAS), a quarter field duplicate
sample), and the blank material collected
from barren industrial sediments are
meeting the standards and confirming the
representativeness of the data
• Pulp and coerce rejects from the laboratory
are and will be stored in the core
company’s storage facility in Stremci
• The QA/QC design and results are
adequate to support estimation of Mineral
Resources
• Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel
• The use of twinned holes
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols
• Discuss any adjustment to assay data
• No twin holes have been completed as the
drilling at Vuzel is still in the early stages
• All the assay results were received
electronically as an Excel spreadsheet,
along with the corresponding quality
certificates from the laboratory
• All data was incorporated in the database
by the database manager
• The access to the database is limited to
authorised employees
• The only adjustment of the assay data is
the replacement of the lower detection limit
of 0.01 ppm to the half of it – 0.005ppm Au
• All data is received and stored securely in
digital format in the Company's database
• Final data is rigorously interpreted by
Page 14 of 19
ASX RELEASE | 19 June 2025
Criteria
JORC Code explanation
Commentary
Raiden’s geoscientific personnel
• Location of
data points
• Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation
• Specification of the grid system used
• Quality and adequacy of topographic
control
• Raiden’s collars surveyed by handheld
GPS with an accuracy of +/- 5m
• Co-ordinates are provided in WGS / UTM
Zone 35 N
• In the time of writing this report a detailed
(cm accuracy) survey of the hole collars
has been completed, but the report is still
not available, hence the data is not
incorporated herein.
• The holes have a downhole survey, taken
at 25 m intervals using Devico survey tool
• 4 degrees positive magnetic declination
was considered in the process of rig
alignment
• Data spacing
and
distribution
• Data spacing for reporting of
Exploration Results
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied
• Whether sample compositing has
been applied
• The drilling grid of the current exploration
holes is aiming to advance the initial
interpretation of the mineralization strike
extent. Several further target areas of
drilling are planned, with approximately drill
spacing of between 50 and 100m
• The hole collars and the sampling spacing
in the completed drilling is sufficient to
confirm continuation of the mineralization
• Sample compositing for metallurgical
testing has not been completed, but is
planned for the second half of 2025
• Orientation of
data in relation
to geological
structure
• All the exploration holes were designed to
intercept the expected dip of the
mineralisation as perpendicular as possible
in order to provide approximate true width
intercepts, and to avoid any sampling
biases
• Sample
security
• Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material
• The measures taken to ensure sample
security
• Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data
• No reviews or audits have been undertaken
• The sample chain of custody is managed
by Raiden
• The core storage is located in the village of
Stremci, and the transportation to the ALS
Romania - Rosia Montana laboratory was
done by courier company – TNT Bulgaria,
part of FedEx Express
• All samples were delivered directly to the
associated carrier by Raiden contractor
personnel before being transported to the
laboratory in Rosa Montana, Romania for
final analysis
Page 15 of 19
ASX RELEASE | 19 June 2025
Table 3: JORC Code, 2012 Edition. Section 2. (Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
• Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area
• Raiden Resources has an interest in the
Vuzel project, which is in Eastern Rhodope,
Bulgaria, under an earn-in and option to
purchase agreement with the holder of the
Vuzel project, Ridge Consultants EOOD.
Under the Agreement Raiden has a right to
earn in up to a 90% interest, and an option
to acquire a 100% interest in respect of the
Vuzel License
• The Vuzel Project does not fall within
Share your feedback
Discover