IP Survey Defines Second Significant Copper/Gold Target on the Stara
Planina Project
Raiden Resources Limited (ASX: RDN) (‘Raiden’ or the ‘Company’) is pleased to provide an
update on the successful exploration activities at the Stara Planina Project.
Preliminary results from the Induced Polarisation (‘IP’) survey have been received from the
Gradiste anomaly, which is located on the western side of the Stara Planina Project.
These results highlight that the anomaly extends over an approximate strike of 900 meters
and remains open to the north. Drill testing will commence in the current quarter of 2018 in
conjunction with drill testing of the Aldinac target area as previously outlined in the
Company’s announcement on the 19th June 2018.
To date the Company has defined two large IP anomalies, both of which are supported by
coincident high copper, molybdenum and gold soil and trench samples.
HIGHLIGHTS
Second significant target defined on the Stara Planina project
Gradiste IP survey defines a large chargeability anomaly, 900 meters in strike
length
IP anomaly is correlated with high Cu, Mo and Au values defined in the historical
soil survey
IP survey indicates that the chargeability anomaly is open to the North
The company has identified outcropping mineralisation in proximity of the IP
anomaly, confirming the geochemical signature
Historical trenching and rock chip sampling on the Gradiste target has defined
significant results
Maiden drill program on schedule to commence in the current quarter 2018 at
both the Gradiste and Aldinac targets
Dusko Ljubojevic, Managing Director of Raiden, commented: "the Company has defined a
second significant drill target on the Star Planina project. The IP data suggests that, as with
Aldinac, at Gradiste we are looking at another large and robust drill target, which we consider
to host the potential for copper and gold intrusion-related mineralisation. The IP target at
Gradiste is supported by historical soil anomalies; high grade trenching results; rock samples
and is located adjacent to a historical underground mine. The latest results confirm the
Company’s belief that the Stara Planina project is a significant target that warrants immediate
follow-up exploration. Our Serbian team is expediting all preparations in order to commence
with the drilling activities as soon as possible.”
RAIDEN RESOURCES LIMITED A.C.N 009 161 522
Gradiste Target
Gradiste is a 3km x 1km copper-molybdenum-gold soil anomaly, defined by values
exceeding 1000ppm Cu; 5ppm Molybdenum and isolated samples with elevated gold of up
to 8ppm Gold.
The geochemical anomaly is associated with outcropping copper mineralisation, consisting
of chalcopyrite and malachite in silicified and brecciated gabbro, and is located over and
adjacent to a younger granodiorite intrusion.
Continuous rock chip sampling and trenching reported by Reservoir Minerals (previous
explorer) during their campaign including:
Continuous chip sampling over 8 meters at an average of 0.77% copper (four 2meter samples, maximum 1.63% copper)
Rock-chip outcrops northeast of Gradiste village yielded 50.4 g/t gold and 1.62%
copper, and 28.2 g/t gold and 1.7% copper
Trench results of 4.5m @ 6.4 g/t Au and 0.16% Cu, including an interval of 0.5 meters
@ 101.5 grams per tonne (g/t) gold
Trench results of a continuous 8m interval with results of 2m @ 10.55g/t Au and 6m
@ 7.37 g/t Au
The historic drilling intersected variably gold – copper – arsenic anomalous zones,
which were associated with quartz-sulphide veinlets and minor stock work zones
o The holes were drilled near the abandoned Alin Do mine and do not test key
targets defined by Raiden
The copper soil anomaly is also characterised by coincident zones of anomalous Mo, Bi, W,
Sn, Te and W. The geochemical signature of this soil anomaly and its association with known
outcrops of granodiorite, make it comparable to other intrusion related copper-gold
deposits (‘IRGD’). Within the context of IRGD deposits, mineralisation is related with the
fluids which are associated with the intrusive event, while the intrusive is often not
mineralized. Due to the distribution of anomalous geochemistry, in relation to the mapped
granodiorite intrusives on the Gradiste anomaly, the Company postulates the observed
mineralisation may represent an IRGD model.
2
Figure 1- Gradiste Copper in Soil anomaly; interpreted structures and location of 2017 IP survey. The location of the drill
holes are shown as blue dots on the northern extremity of the anomaly. Historical drilling was focused on the Alin Do mine
which is located adjacent to the main target as defined by the geochemistry and geophysics during Raiden’s’ program.
Gradiste Geophysics
The company engaged Terratec, a German based geophysical service provider, to follow up
on the IP anomaly which was defined in the 2017 IP survey. A total of six, approximately
1,800m long lines were completed to determine the strike extent of the Gradiste target. The
data from the 2017 survey was reinterpreted in conjunction with the data from latest survey.
The interpretation of the latest survey data indicates that the anomaly extends from the
surface to the maximum survey depths (approx. 400m) and possibly remains open at depth.
The current survey has defined a 900-meter strike extent (chargeability anomaly), between
survey lines E and line H (refer to figure 2)
3
Figure 2 - location of the 2017 and 2018 IP survey lines with relation to geochemical anomaly, structure and geological
setting.
The IP data indicates that the chargeability anomaly on line E (Figure 3) is located between
two sub-vertical structural features. The anomaly outcrops and extends to an approximate
maximum depth of 300 meters and has a width of approximately 1,100 meters.
Line F (Figure 4) has defined the most intense chargeability anomaly, which extend across
600 meters and has a 400-meter vertical extent. The Chargeability anomaly is flanked by a
resistive anomaly on the eastern side.
Line G-2017 (Figure 5) represents a reinterpreted model, from the data which was derived
from the 2017 survey. The chargeability model is approximately 1,000 meters wide and has
an approximate 300m vertical extent.
Lines G-2018 and H (Figure 6 and 7), still define chargeability highs, but suggest that the
anomaly may persist at depth, beyond the survey detection capacity.
4
The Gradiste IP survey data and interpretation has delineated a significant anomaly which
extends over almost 1,000 meters along strike and is open to the north. The Company plans
to follow up on the high Cu in soil anomalies south of line J.
Figure 3 – Gradiste survey line E (2018 survey).
5
Figure 4 - Gradiste line F survey line (2018 Survey)
Figure 5 - Gradiste survey line G 2017 (2017 survey, reinterpreted in 2018)
6
Figure 6 - Gradiste survey line G2018 (2018 Survey)
Figure 7 - Gradiste survey line H (2018 survey)
7
Reconnaissance Mapping
The Companies’ geologists have also been conducting reconnaissance mapping and
sampling over the Gradiste target. A number of mineralised outcrops have been noted near
the targeted areas. These outcrops comprise of highly silicified gabbro, impregnated with
silicification and mineralisation (pyrite, chalcopyrite and malachite).
Figure 8 - Malachite copper mineralisation from highly altered gabbro samples located on the Gradiste target
Figure 9 - Massive sulphide mineralisation from historical dumps at the Alin Do Mine, which is located adjacent to the main
Gradiste target.
8
Stara Planina Geology and Background
The Stara Planina Exploration Permit is located approximately 30km south of the Timok
District, a world class copper-gold district, within the Tethyan belt in Serbia. The Project
covers an inlier of Palaeozoic gabbro intruded by Permo-Carboniferous granodiorite and is
located about 60 Km south of the globally significant Bor copper-gold mining complex and
smelter. The permit contains known vein-type bismuth-copper- gold-antimony
mineralisation in the Gradiste area, including the Alin Do mine, which ceased operation in
the late 1940’s.
The geology of the Permit area consists of an early Palaeozoic gabbro that is intruded by
Permo-Carboniferous granodiorite and associated quartz veining. To the north-east the
gabbro borders a major NNW-SSE trending fault, with basement gneiss, greenschist and
marble. There is a strong NW-SE structural grain that controls the distribution of the
granodiorite intrusives, and the observed mineralisation, as well as the trend of the surface
geochemical anomaly.
Throughout the permit area, mineralisation is controlled by the NW-SE trending structures
and is invariably associated with ductile deformation of the gabbro. The main target style
within the permit area is bulk-mineable, intrusion-related gold-copper mineralisation.
The geology and geochemistry are characteristic of Intrusion Related Gold - Copper style of
mineralisation. The company is also assessing the potential for further high-grade Cu-Au
mineralisation, which characterises the Alin Do deposit.
Figure 10 - Stara Planina permit geology and location of target Areas
9
Planned exploration activities
The Company continues to advance its exploration activities on the Aldinac target and the
Gradiste target with the maiden drill program on schedule for the current quarter 2018. As
part of the expedition of the drilling program, the Company is prioritising:
Mapping and rock chip sampling of the Aldinac and Gradiste target areas,
Negotiations with private and state landholders are ongoing to obtain access rights
for the drilling program,
Engaging with contractors to commence with the construction of access roads and
drill pads, and
Negotiations with drilling service provider to finalise the drilling contract
Further detailed information on the JV Licences and Raiden’s other projects can be found in
the Prospectus, which includes an Independent Geologists Report pertaining to the
Company’s Serbian projects.
-
ENDS -
Competent Person's Statement
The information in this announcement that relates to exploration targets and exploration results is based on information compiled by Mr Martin
Pawlitschek, a competent person who is a member of the AIG (Australian Institute of Geoscientists).. An AIG membership requires the member
to adhere to standards for the reporting of mineral exploration results and resources under JORC. Mr Martin Pawlitschek is employed by Raiden
Resources Limited. Mr Martin Pawlitschek has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the JORC Code. Mr Martin
Pawlitschek consents to the inclusion in this announcement of the matters based on her work in the form and context in which it appears.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as
“expect(s)”, “feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar
expressions are intended to identify forward-looking statements. These statements include, but
are not limited to statements regarding future production, resources or reserves and exploration
results. All of such statements are subject to certain risks and uncertainties, many of which are
difficult to predict and generally beyond the control of the Company, that could cause actual
results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of
mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes
in project parameters as plans continue to be refined, (iii) the potential for delays in exploration
or development activities or the completion of feasibility studies, (iv) risks related to commodity
price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate
financing on a timely basis and on acceptable terms or delays in obtaining governmental
approvals or in the completion of development or construction activities, and (vi) other risks and
uncertainties related to the Company’s prospects, properties and business strategy. Our
audience is cautioned not to place undue reliance on these forward-looking statements that
speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date
hereof, or to reflect the occurrence of or non-occurrence of any events.
10
For further information please contact:
Dusko Ljubojevic (Managing Director)
Email address: dusko@raidenresources.com.au
About Raiden Resources
Raiden Resources Limited (ASX:RDN) is an ASX listed copper—gold focused exploration company
targeting the emerging prolific Tethyan metallogenic belt in eastern Europe, primarily in Serbia. The
Company has recently formed an unincorporated Joint Venture Agreement with Rio Tinto in respect
to three of its six projects, whereby Rio Tinto can earn a 75% project-level position in the properties
via a staged exploration commitment totalling USD$31.5 million in three stages at Rio Tinto’s
election.
Raiden also retains a 100% in the applications for Pirot, Bor and Zupa (transfer in progress) projects
and an executed earn in agreement on the Stara Planina Project, where it has the option to earn into
100% of the project. The Company considers its project portfolio prospective for intrusion-related
mineralisation styles including gold, copper and other base metals.
JORC CODE, 2012 EDITION Table 1. This table applies to both exploration targets at
Stara Planina, namely Aldinac and Gradiste.
CRITERIA
Sampling techniques
COMMENTARY
Soil sample results maps, data base and reports by Reservoir
Capital were digitised by Raiden. The data is available in
summary maps and excel sheets but lacks detailed information of
sampling techniques deployed.
No information is available on the collection techniques of the soil
samples, rock chip samples or trench samples collected by
Reservoir Capital. Any information from such samples is
qualitative and is only used to define target areas for further work.
Induced polarisation surveys carried out along two lines by Raiden
in 2017 was completed by an established, Belgrade Based,
Geophysical Contractor – Geofizika ING.
Comments on Reservoirs Capital’s historic Sampling, Assaying
and Quality Control Program reported in Reservoir Capitals
December 6, 2007 News Release: Reservoirs 2007 soil and rock
geochemical samples were reported to have been collected in
accordance with accepted industry standards. The historic soil
samples were submitted to the ALS Chemex laboratories in
Vancouver (ISO 17025 accredited) for analysis: gold was analysed
by fire assay with an AAS finish, and multi-element analyses were
determined by ICP MS/AAS techniques. Reservoir reports to have
conducted routine QA/QC analysis on all assay results, including
the systematic utilization of certified reference materials, blanks,
field duplicates, and umpire laboratory check assays. All work was
supervised and authorized by Reservoir’s qualified person under
the National Instrument (NI) 41-101 guidelines of the Canadian
Institute of Mining (CIM).
11
CRITERIA
COMMENTARY
Mr. Martin Pawlitschek is the Competent Person, as far as this
announcement (and this JORC Table 1) is concerned. Mr
Pawlitschek, judges these historic soil sampling results to be
sufficiently reliable for the purpose of defining the main zones of
interest at Stara Planina. The results will only be used to guide the
initial phases of Raiden’s work program and drill testing, and do
not form part of any resource estimate.
It is Mr Pawlitschek’s view that any historic grade information
reported is indicative only of the presence and absence of
mineralisation and does not provide a reliable indicator of any
future results to be expected to be encountered by Raiden’s
current or future work.
Drilling techniques
Drill sample recovery
Not Applicable, while a number of diamond holes were drilled by
Reservoir Capital, drilling was conducted peripheral of Raiden’s
current key area of interests and no drilling results are reported
here.
Not Applicable
Logging
A number of diamond holes were drilled by Reservoir Capital,
drilling was conducted peripheral of Raiden’s area of interests and
no drilling results are reported here.
Sub-sampling techniques
and sample preparation
No details are available regarding the sub-sampling for the 2007
soil sampling results by Reservoir Capital. However, as these were
reported under National Instrument (NI) 43-101 and authorised by
a competent person (CP) under these guidelines, Raiden’s CP
judges these historic soil sampling results to be sufficiently
reliable for the purpose of defining the main zones of interest at
Stara Planina. The results will only be used to guide the initial
phases of Raiden’s work program and drill testing, and do not
form part of any resource estimate.
It is Mr Pawlitschek’s view that certified laboratories will have
suitable sub-sampling protocols in place that allow a
representative portion of the sample to be analysed. While the
details in this case are not available to the CP, the risk is
considered insignificant for the purpose of defining broad zones
of interest. It is the CP’s view that the result from the historic soil
sampling grids are indicative enough to guide Raiden’s follow up
work of IP, mapping and rock chip sampling. The company will
have enough of its own verifiable data at hand prior to designing a
maiden drill testing program.
Quality of assay data and
laboratory tests
The historic 2007 soil samples by Reservoir Capital were reported
to have been submitted to the ALS Chemex laboratories in
Vancouver (ISO 17025 accredited) for analysis: gold was analysed
by fire assay with an AAS finish, and multi-element analyses were
determined by ICP MS/AAS techniques. Reservoir reports to have
conducted routine QA/QC analysis on all assay results, including
the systematic utilization of certified reference materials, blanks,
field duplicates, and umpire laboratory check assays. All work was
supervised and authorised by a person qualified under the
12
CRITERIA
COMMENTARY
National Instrument (NI) 41-101 guidelines of the Canadian
Institute of Mining (CIM).
Raiden’s CP is confident that these analytical and assay
techniques and QA/QC protocols selected by Reservoir’s team
were appropriate and adequate for the purposes of defining zones
of interest in the area. These sample media and techniques and
assays were not part of a resource estimate.
Verification of sampling and
assaying
No drilling or mineralisation reported here.
No drilling or twinning of holes reported here.
No detailed, primary documentation of historic results available in
regard to the 2007 soil sample results by Reservoir Capital.
No adjustments were made to the assay data.
Location of data points
Not applicable as there is not Mineral Resource
Soil samples:
Grid System: Projected coordinate system MGI 1901 / Balkans
zone 7
EPSG number 3909
Soil sampling locations were determined by a hand-held GPS.
Topographic accuracy is estimated t be within 30-50 meters.
Topographic control is not considered relevant, as it does not
relate to Mineral Resources
IP:
Grid System: Projected coordinate system MGI 1901 / Balkans
zone 7
EPSG number 3909
Soil sampling locations were determined by a hand-held GPS.
Topographic accuracy is estimated to be within 30-50 meters.
Topographic control is not considered relevant, as it does not
relate to Mineral Resources
Data spacing and
distribution
The historic soil sample grid at Gradiste is at a spacing of 200m x
200m with a small area in the south infilled to nominally 50m x
100m
At Aldinac historic soil samples were on collected on a 200m x
200m grid.
During 2017 a single IP line was completed by Raiden across each
of the anomalies at Gradiste and Aldinac.
Raiden commissioned Belgrade based Geofizika-ing to complete
the IP surveys in 2017. The Induced Polarisation survey was carried
out by simultaneously applying of electrical methods:
13
CRITERIA
COMMENTARY
method of induced polarisation and resistivity method, in the
dipole-dipole modification
of electrodes layout. The four-electrode C1C2-P1P2 was applied,
with the transmitting by dipoles (C1C2) and receiving by dipoles
(P1P2), lit. 1 and 2. The dimensions of the
transmitter and receiver dipole were 200 m, while the
measurement step was 100 m.
Measurements were carried out along 7 dipole lines, from N = 1 to
N = 7, i.e. with the
distance of the transmitting and receiving dipoles’ middles of 400
m (N = 1), 600 m (N =
2), 800 m (N = 3) 1,000 m (N = 4), 1,200 m (N = 5), 1,400 m (N = 6)
and 1,600 m (N =
7), graphic attachments: 3a, 3b, 4a and 4b.
The explorations covered the traces of two (2) cross-sections
marked by G and A, 1,000
m in length for the interpretation. The Client located the crosssection trace G about 600
m southeast of the village of Gradište, and it crosses the terrain in
the direction
southwest-northeast, under the azimuth of 55°/235°.
Details of the 2018 IP Surveys by Terratec:
The surveys were completed with a pole dipole array due to its
higher depth penetration compared to dipole-dipole.
Survey design – A modified TDIP pole-dipole array with is selected
to detect the resistivity and chargeability distribution on depth
sections to support the detailed geological interpretation. It
consists of a current transmitter which is spatially separated from
a receiver spread. The transmitter injection points are prepared
with offsets of approx. 100 m and TX spacing’s of 100 m parallel to
the receiver lines. The separation allows the use of an external
powerful transmitter providing the high currents necessary in
order to achieve data of a satisfying signal-to-noise ratio to depth
of more than 400 m (central part of the line). The receiver cable
has a length of 1600 m with take-outs every 100 m monitored by 2
FULLWAVE GDD receivers allowing advanced post processing if
necessary for noise reduction. The pole dipole data were be
measured forward and reverse.
Survey Parameters:
Parameters pole-dipole array:
RX spacing a = 100 m and multiples
(200m, 400m, 800 m )
Current injection spacing TX_Spacing = 100 m
Receiver cable length = 1600 m (max. 1700m)
Max. theoretical investigation depth = approx. 400 m
TX-RX offset = 100 m
Settings:
FULLWAVE records of the signal at RX pos.
Time domain cycle T = 2 sec
Number of cycles (depending on data quality) = approx. 10 – 20
14
CRITERIA
COMMENTARY
Extracted from time series as data with:
Delay time M_D = 240 ms
Width of partial window T_M1-T_M20 = 80 ms
Equipment Used:
VIP 4000 4 KW Transmitter (3600V) or VIP 10000 10 KW
Transmitter (3600V) by Iris Instruments
Two 16 channel IP full Wave receivers GDDX16
Non polarisable pots
All geophysical accessories
Trimble Differential GPS
radios etc., notebook computer, software,
Software Zond Res2D, Geosoft,
- GPS-data taken with Trimble DGPS of receiver and transmitter
positions; remote pole position
Processing steps:
GPS data:
- differential GPS correction
- optional linking of DEM elevation to the electrode position
Processing of the IP data by Terratec:
- filtering of data
- Data processing, using real electrode x,y,z positions from DGPS,
2D- inversion model of resistivity and chargeability sections
including topography, and geophysical target generation
- Recalculation of the geometric factor considering the offset of
100 m between the receiver line and the transmitter line and the
relative position of the remote pole
- inversion of the data together with the topography
- model results exported as ascii files
- Geosoft depth sections of model resistivity and chargeability
- the results will be presented as resistivity and chargeability
sections in Geosoft format (other formats have to be agreed with
the client if they can be produced with the Geosoft software);
The survey was conducted and supervised by suitably qualified,
trained and experienced geophysicists and technicians from
Terratec.
Mr. Martin Pawlitschek considers that the sample/data spacing
and distribution which deployed in the 2017 and 2018 IP survey
sto be sufficient and adequate for orientation purposes.
No mineral resource or ore reserve is being reported.
Sample composite was not employed.
Historic sample lines were oriented at right angles to the
dominant structural trend at both Gradiste and Aldinac, along
15
CRITERIA
Orientation of data in
relation to geological
structure
COMMENTARY
appropriate sampling relative to the expected structural controls.
Mr Martin Pawlitschek is satisfied that the orientation of the
survey carried out by Raiden resources and by the historical soil
sampling gird, is suitable to the structures which are being
investigated.
Not applicable as no drilling is reported by the company.
Historic drilling is not reported here, as it has been limited to
areas outside of Raiden’s zones of main interest.
Sample security
Raiden nor the CP have information as to the sample security and
chain of custody relating to the historic soil, trench or rock
samples. The CP judges the risk of systematic tampering and
contamination of the historic soil samples to be low, given that
the work was reported by a qualified person under the Canadian
reporting guidelines of NI 43-101.
Audits or reviews
No audits have been undertaken
CRITERIA
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
COMMENTARY
Mineral tenement and land
tenure status
Exploration done by other
parties
Skarnore Resources DOO, a 100% owned subsidiary of Raiden
Resources LTD, has an interest in the Stara Planina Licence under an
earn-in and joint venture agreement with the registered holder of
the Stara Planina Licence, Geo Consulting Studio doo
('GeoConsulting Joint Venture Agreement'). Under the
GeoConsulting Joint Venture Agreement Skarnore has a right to
earn in up to a 90% interest, and an option to acquire a 100% interest
in respect of the Stara Planina Licence. The Stara Planina mountain
range within the Knjazevac municipality was proclaimed a
conservation area in 1997 due to the diverse flora and fauna. The
Stara Planina licence area is partially located on Stara Planina
conservation area, the Company does not anticipate that the
Company will be prohibited from exploring in the Company’s licence
area. The Company is aware that application for permission to mine
will subsequently be required, as with any other mining application
in Serbia, should exploration be successful. Notably, Companies’
target areas are located, either outside of the boundaries of the
nature park, or in areas within the park, where the relevant laws
allow for mining and development, but with imposed conditions.
The nature of these conditions is not known to the Company at this
time and the Company plans to make further inquiries if the
exploration efforts are successful.
At time of reporting the company license is in good standing and the
company plans to comply with all provisions relating to the Serbian
mining law and apply for an extension of the permit for a further 3
year exploration time frame.
The project area has been explored by a number of parties in the
past. Prior to the mining during World War II, exploration or mineral
16
CRITERIA
COMMENTARY
exploitation activities are unknown. After World War II and the
termination of mining, the Stara Planina area was reportedly
explored for uranium by former-Yugoslav state agencies which
undertook limited exploration.
Geology
Drill hole Information
Data aggregation methods
In the period 2003-2004 previous explorers performed minor copper
exploration in the area. Although limited, this exploration activity
was the first to document porphyry style potential of the area, on
the Gradiste anomaly. Further work was also performed by
Reservoir Capital Corp (‘Reservoir”). Raiden has purchased the data
sets of the work executed by Reservoir, and the data which is
relevant to the target areas, as defined by Raiden are presented in
this release.
The CP judges, from the data which is available at time of this
announcement, that the mineralisation style may be related to an
Intrusion Related Copper Gold Deposit type.
Not relevant as no historical drilling results are being presented and
no drilling was undertaken by Raiden
•
•
•
Relationship between
mineralisation widths and
intercept lengths
•
•
•
Any grade and width information reported in this release is
considered useful, qualitative information by the CP. The data is
suitable for planning of additional work that will lead to a drill
decision. The data available is insufficient to be included in a
mineral resource. Any weighting averaging techniques which
were applied by Reservoir Capital and reported here are not
known to the CP.
The historical results, as presented by Reservoir include trench
and ‘continuous chip sampling’ results, but the methods and
calculations which were used by Reservoir are not known.
No metal equivalent formulas were used in reporting of any
historical intercepts, or results
Mineralisation widths and grades reported here are only
indicative and are not incorporated into a resource.
Mineralisation geometry at this stage is unknown.
Drill hole orientations will be finalised only when results of the
current IP surveys, field mapp