Raiden expands phase 2 drill program at Vuzel Gold Project
Released
Released
Announcement PDF
ASX RELEASE | 03 June 2025
RAIDEN EXPANDS PHASE 2 DRILL PROGRAM
AT VUZEL GOLD PROJECT
•
•
•
•
ASX Code: RDN
DAX Code: YM4
HIGHLIGHTS
•
QUICK STATS
The current Phase 2 drill campaign at the Vuzel Gold Project will be
expanded, with an additional 2,000m of diamond drilling planned,
bringing the total budgeted program to 4,000m.
The expanded program builds on consistent exploration success
across both the maiden1 and ongoing Phase 2 drilling campaigns,
with every hole drilled and reported to date returning nearsurface gold mineralisation.2
The expanded program aims to extend the mineralised footprint
along strike and test further high-priority targets within the
broader 3–4km anomalous corridor.
Ongoing drilling is focused on refining structural controls to
improve targeting of potential high-grade feeder zones.
The decision to expand the drilling program follows Raiden
successfully meeting the investment criteria for a 75% ownership in
the Vuzel Project, and retains a pathway to 90% ownership
through the definition of a JORC resource.3
BOARD &
MANAGEMENT
Non- Executive Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non- Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
•
Drilling remains ongoing with further results anticipated in the
coming weeks.
•
Engage directly with us by commenting on our latest announcements via InvestorHub. You can
view and comment on this announcement here.
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to advise that,
following encouraging results from the ongoing Phase 2 campaign,2 the Company has decided to
P 08 6158 9990
Suite 7, 63 Shepperton Road, Victoria Park, WA 6100
ABN 68 009 161 522
Page 1 of 5
ASX RELEASE | 03 June 2025
expand its current drilling activities at the Vuzel Gold Project (“Vuzel”) in south-eastern Bulgaria by a
further 2,000m of diamond drilling.
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“Our decision to expand the Phase 2 drilling program by a further 2,000m of diamond drilling is in
direct response to the highly encouraging results reported to date. Every hole reported from the Vuzel
project has returned gold mineralisation, including numerous high-grade intercepts.
Based on the results and our geological understanding to date, the mineralised system appears
extensive, near surface and horizontal to sub-horizontal. These characteristics present an opportunity
to rapidly and cost-effectively advance exploration, in alignment with our corporate strategy. The
expanded drilling will allow us to better define the geometry of the system and test strike extensions
across the broader 3-4km anomalous corridor, with an emphasis on targeting potential high-grade
feeder zones.
While drilling remains ongoing and our understanding of Vuzel’s potential continues to evolve, we see
strong potential to progress towards a maiden JORC resource in time, which, if successful, would allow
us to achieve 90% ownership. I look forward to keeping shareholders updated as further results become
available.”
EXPANDED DRILLING PROGRAM
Raiden’s decision to expand the Phase 2 drill campaign at Vuzel by a further 2,000m of diamond
drilling now brings the total budgeted program to 4,000m. The expanded program follows the
ongoing success achieved to date, which has confirmed consistent mineralisation across near-surface
and broad intercepts, with results including2:
•
•
•
•
•
•
VZ2517: 24.8m @ 1.96g/t Au from 0.0m
o Including 13.3m @ 3.40g/t Au from 0.0m
VZ2514: 56.0m @ 1.09g/t Au from 0.0m
o Including 8.0m @ 1.50g/t Au from 7.0m
o Including 8.3m @ 4.94g/t Au from 47.7m
VZ2412: 47.5m @ 0.53g/t Au from 2.5m
VZ2515: 22.0m @ 0.36g/t Au from 0.0m and 23.2m @ 0.57g/t Au from 71m
o Including 6.5m @ 1.44g/t Au from 81.0m
VZ2516: 21.4m @ 0.40g/t Au from 2.1m
VZ2518: 14.5m @ 0.45g/t Au from 0.0m and 25.6m @ 0.67g/t Au from 60m
o Including 4.5m @ 1.04g/t Au from 4.5m
o Including 10.9m @ 1.23g/t Au from 74.7m
These results, combined with those from the maiden drill program results1, support Raiden’s view
that Vuzel hosts a potentially large-scale, near-surface epithermal gold system, hosted within subhorizontal sedimentary units and vertical to sub-vertical feeder structures. The shallow nature and
Page 2 of 5
ASX RELEASE | 03 June 2025
geometry of the mineralisation at Vuzel makes it ideal for ongoing cost-effective drilling and
exploration. Several high priority targets exist across the 3-4km corridor of anomalous gold (Figure
1). This expanded scope aims to refine structural interpretation, identify potential high-grade feeder
zones, as well as the extent of the mineralised envelope of the system.
Figure 1: Vuzel Exploration permit, structures, geology and exploration targets
STRATEGIC VALUE OF THE VUZEL GOLD PROJECT
Raiden has recently met the investment criteria to increase its ownership of Vuzel to 75% and retains
a clear pathway to 90% ownership by defining a JORC gold resource.3 Located less than 20km4 from
established third-party gold processing infrastructure and within proximity to recent regional M&A
activity (such as the Rozino transaction, valued at US$59m)5, Raiden believes Vuzel is rapidly
emerging as a valuable and strategic asset within its portfolio.
Page 3 of 5
ASX RELEASE | 03 June 2025
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
We value your feedback and questions.
Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced in this release
1
ASX:RDN 6 July 2022 Gold Discovery at Raiden’s Vuzel Project in Bulgaria
2
ASX:RDN 19 May 2025 Drilling Confirms Potential significant shallow Au System
3
ASX:RDN 22 May 2025 Raiden meets investment criteria to earn 75% at Vuzel Gold
The information in the referenced announcements 1-2 footnoted above that relate to Exploration Results have previously
been released to the ASX. The Company confirms that it is not aware of any information or data that materially affects the
information included in the market announcements, and that all material assumptions and technical parameters
underpinning the announcements continue to apply. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
Other announcements and material referenced in this release
4
https://velocityminerals.com/projects/overview/
5
CVE:VLC 1 October 2024 Velocity Minerals Velocity Agrees to Sell All Bulgarian Assets for USD $59.0 Million
Page 4 of 5
ASX RELEASE | 03 June 2025
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”, “believe(s)”,
“will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forward-looking statements.
These statements include, but are not limited to statements regarding future production, resources or reserves and
exploration results. All of such statements are subject to certain risks and uncertainties, many of which are difficult to
predict and generally beyond the control of the Company, that could cause actual results to differ materially from those
expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties
include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of
mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade,
planned mining dilution and ore loss, or recovery rates and changes in project parametres as plans continue to be refined,
(iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks
related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing
on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects,
properties and business strategy. Investors are cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and the Company does not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the
occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed base metal & gold exploration Company focused on
identifying and discovering significant and economically attractive mineral deposits. Driven by a passion for unlocking
discoveries that create shareholder value and the support of a strong corporate treasury, Raiden is committed to achieving
exploration success.
The Company’s portfolio of projects includes the Andover South lithium project. The Company also holds the rights to
the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region of Western Australia.
In addition, the Company holds the rights to multiple projects in the emerging and prolific Western Tethyan metallogenic
belt in Eastern Europe, where it has established a significant exploration footprint in Bulgaria.
Page 5 of 5
Share your feedback
Discover