Drilling Confirms Potential significant shallow Au System
Released
Released
Announcement PDF
ASX RELEASE | 19 May 2025
VUZEL DRILLING CONFIRMS POTENTIAL FOR
SIGNIFICANT, SHALLOW GOLD SYSTEM
QUICK STATS
HIGHLIGHTS
•
•
•
ASX Code: RDN
All eight Phase 2 holes at Vuzel1 hit near-surface gold, including
high-grade intercepts in a number of intervals–to date every Phase
12&2 drillhole has intercepted gold mineralisation with peak
value/interval 24g/t Au over 1.5m
Results indicate that Vuzel may host an extensive, near-surface
mineralised gold system with a high-grade component
Significant intersectionsA include:
• VZ2517: 24.8m @ 1.96g/t Au from 0.0m
▪ Including 13.3m @ 3.40g/t Au from 0.0m
• VZ2514: 56.0m @ 1.09g/t Au from 0.0m
▪ Including 8.0m @ 1.50g/t Au from 7.0m
▪ Including 8.3m @ 4.94g/t Au from 47.7m
• VZ2412: 47.5m @ 0.53g/t Au from 2.5m
• VZ2515: 22.0m @ 0.36g/t Au from 0.0m
and 23.2m @ 0.57g/t Au from 71m
▪ Including 6.5m @ 1.44g/t Au from 81.0m
• VZ2516: 21.4m @ 0.40g/t Au from 2.1m
• VZ2518: 14.5m @ 0.45g/t Au from 0.0m
and 25.6m @ 0.67g/t Au from 60m
▪ Including 4.5m @ 1.04g/t Au from 4.5m
▪ Including 10.9m @ 1.23g/t Au from 74.7m
DAX Code: YM4
BOARD &
MANAGEMENT
Non-Executive Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
Non-Executive Director
& Company Secretary
Ms Kyla Garic
Chief Operating Officer
Mr Sean Halpin
ASSET PORTFOLIO
AUSTRALIA
Li, Au, Cu, Ni & PGE
BULGARIA
Cu, Au & Ag
•
The near surface, shallow dipping to sub-horizontal nature of the mineralisation will allow for
rapid, cost-effective follow up drilling to explore the full extent of the mineralised system
•
Initial program is focused on 1.5km (Figure 1&2) of strike within the 4km target area (Figure
1). Assays for further holes are pending, and drilling is ongoing
•
Vuzel is located <20km from Gorubso-Kardzhali A.D.’s (a private Bulgarian Mining company)
gold processing facility3, whom is also a 30% partner of TSX-V Velocity Minerals, whose
Bulgarian assets, including the Rozino deposit (573Koz@0.8g/t Au) was recently subject of
US$59M4 acquisition by Türker Mining, a subsidiary of Turkish conglomerate Türkerler Holding
P 08 6158 9990
Suite 7, 63 Shepperton Road, Victoria Park, WA 6100
ABN 68 009 161 522
Page 1 of 20
ASX RELEASE | 19 May 2025
•
Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the Company”) is pleased to report initial
assay results received from the ongoing 2025 Phase 2 diamond drilling program on the Vuzel Gold
Project (“Vuzel”) in south-eastern Bulgaria.
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“I am pleased to report that all assay results received to date from the second phase of the Vuzel drilling
campaign have confirmed significant gold mineralisation, extending over a meaningful strike length
and width. These results build on the strong foundation of our maiden drilling program, which also
intersected gold mineralisation in every hole. Importantly, this phase has delivered high-grade
intercepts and has significantly improved our understanding of the controlling structures that acted as
conduits for fluid emplacement. This growing geological insight is expected to enable more precise
targeting of high-grade zones in future drilling.
The results continue to validate our exploration model and reinforce our geological understanding of
the Vuzel Gold Project, strengthening our view that it represents a strategically significant asset within
the Company’s portfolio. Furthermore, we believe that recent transactions in the region support
management’s view that discoveries in the district hold the potential for significant value generation for
shareholders.
With drilling ongoing and further assays pending, I look forward to providing additional updates as
results become available.”
Vuzel Phase 2 drilling program
A 2,000-metre diamond drilling program commenced in March 20251 as part of the Phase 2 campaign
at the Vuzel Gold Project. This program is designed to deepen Raiden’s understanding of the
mineralised system and refine future exploration and resource development strategies. Initial drilling
focused on areas in proximity to historical drillholes, providing valuable insights into the geological
controls on the gold mineralisation. Drilling then progressed into previously untested zones to the
east and west along strike, targeting extensions to known mineralisation and aiming to significantly
expand the project’s scale (see Figure 1 and 2).
This is the second drill campaign conducted by Raiden at Vuzel, which extends over several kilometres
and is characterised by broad gold mineralisation, including high grade sections defined through
historical channel/rock chip sampling and the initial drilling program completed by Raiden in 20222,5.
To date, twelve drillholes have been completed as part of Phase 2 drilling program at the Vuzel Gold
Project. The first eight holes, designed to target infill and extension of mineralisation identified in the
Page 2 of 20
ASX RELEASE | 19 May 2025
2022 drilling program, have all intersected shallow mineralisation near-surface in the central western
target area of the deposit. The zone remains open along strike both east and west and to the north
and south. Within the broader package of mineralised sediments, drilling has also confirmed high
grade mineralisation, which is associated with steeply dipping fault structures interpreted to have
acted as conduits for the mineralised fluids.
Significant intersections from the initial assay results of from the Phase 2 drilling program include:
•
•
•
•
•
•
VZ2517: 24.8m @ 1.96g/t Au from 0.0m
▪ Including 13.3m @ 3.40g/t Au from 0.0m
VZ2514: 56.0m @ 1.09g/t Au from 0.0m
▪ Including 8.0m @ 1.50g/t Au from 7.0m
▪ Including 8.3m @ 4.94g/t Au from 47.7m
VZ2412: 47.5m @ 0.53g/t Au from 2.5m
VZ2515: 22.0m @ 0.36g/t Au from 0.0m
and 23.2m @ 0.57g/t Au from 71m
▪ Including 6.5m @ 1.44g/t Au from 81.0m
VZ2516: 21.4m @ 0.40g/t Au from 2.1m
VZ2518: 14.5m @ 0.45g/t Au from 0.0m
and 25.6m @ 0.67g/t Au from 60m
▪ Including 4.5m @ 1.04g/t Au from 4.5m
▪ Including 10.9m @ 1.23g/t Au from 74.7m
Drilling is ongoing with the initial 2,000-metre program expected to be conclude in June 2025. In
addition to the eight completed holes with reported results, samples from four further drill holes have
assays pending. These four holes are located to the east of the initial eight holes along strike (refer
to Figure 2). The Phase 2 program may be expanded based on the outcomes of this initial drilling.
Page 3 of 20
ASX RELEASE | 19 May 2025
Figure 1: Vuzel Exploration permit, structures, geology and exploration targets
Page 4 of 20
ASX RELEASE | 19 May 2025
Figure 2: Vuzel Central Zone Drill plan and drillhole locations over 1.5km strike
Gold mineralisation at Vuzel is associated with zones of oxidised, silicified conglomerates and
sandstones with quartz-mica-pyrite and silica-clay-pyrite alteration assemblages. This alteration zone
tends to produce the higher gold grade intercepts, up to 24g/t Au over 1.5m in certain intervals, while
the more peripheral zones, showing sericite-clay-chlorite and mica-clay assemblages, tend to be
characterised by lower grades of up to 1-2 g/t Au.
Page 5 of 20
ASX RELEASE | 19 May 2025
Figure 2: Vuzel Central Zone Interpreted Cross-section
Page 6 of 20
ASX RELEASE | 19 May 2025
Figure 3: Cross section and interpreted mineralisation with intercepts at the Vuzel Gold Project
Page 7 of 20
ASX RELEASE | 19 May 2025
Figure 4: Long section indicating the interpreted sub parallel nature of mineralisation at Vuzel Gold Project
From the limited drilling to date the current interpretation is for mineralisation to be preferentially
developed along the sub-horizontal conglomerate units, in the vicinity of the intersections with steep
dipping faults. In this scenario the faults represent feeder structures for the mineralising hydrothermal
fluids, which then allow fluids to flow into the permeable conglomerate units where changes in
chemistry, pressure or other physical and chemical conditions allow the gold and associated minerals
to drop out of solution.
Vuzel Next Steps
The Company will complete the initial program, which is aimed at defining the extent of the
mineralisation across the deposit area within the initial central 1.5km zone. The results of this program
will guide future drill planning, which may also potentially provide further guidance on orientations
and targeting of the high-grade feeder structures within the sedimentary package. In parallel, the
Page 8 of 20
ASX RELEASE | 19 May 2025
Company plans to investigate and undertake targeting across the entire 3-4km prospective strike
which is defined by anomalous gold.
Should exploration ultimately confirm a viable mineral resource, Raiden believes that the project's
proximity to third-party processing infrastructure and other deposits may provide potential synergies,
subject to further technical and economic assessments.
The type of geology and setting at Vuzel is similar to that of the epithermal low sulphidation Ada
Tepe deposit, which is currently being mined by Dundee Precious Metals only 30km south-east of
Vuzel (see Figure 5) (TSX: DPM). Vuzel is located <20km from Gorubso-Kardzhali A.D. (a Bulgarian
Mining company) gold processing facility3, whom is also a 30% partner of TSX-V Velocity Minerals
whose Bulgarian portfolio, including the Rozino deposit (573Koz@0.8g/t Au) was recently subject of
a US$59M4 acquisition by Türker Mining, a subsidiary of the Turkish conglomerate Türkerler Holding.
Raiden believes that targeted follow-up exploration and the strategically planned Phase 2 drill
campaign at Vuzel present a compelling exploration opportunity. Raiden looks forward to providing
further updates as the program progresses.
Figure 5 - Location of Vuzel project in Southern Bulgaria in relation to other operating and historical mine
and prospects
Page 9 of 20
ASX RELEASE | 19 May 2025
This ASX announcement has been authorised for release by the Board of Raiden Resources
Limited.
We value your feedback and questions.
Engage directly with us by commenting on our latest announcements via InvestorHub.
You can view and comment on this announcement here.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
Page 10 of 20
ASX RELEASE | 19 May 2025
ASX Announcements referenced in this release
1
ASX:RDN 27 March 2025 Raiden Commences Phase 2 Drilling at Vuzel Gold Project
2
ASX:RDN 06 July 2022 Gold Discovery at Raiden’s Vuzel Project in Bulgaria
3
https://velocityminerals.com/projects/overview/
4
TSXV: VLC 28 February 2025 Velocity Enters into Definitive Agreement to Sell All Bulgarian Assets
5
ASX:RDN 12 June 2019 Raiden Reports on Historical Drill and Trench Data on Vuzel Project in Bulgaria
Competent Person's and Compliance Statement
The information previously released to the ASX and referenced in footnotes 1,2 & 5 above relate to exploration results that
have previously been released on the ASX. The Company confirms that it is not aware of any information or data that
materially affects the information included in the market announcements, and that all material assumptions and technical
parameters underpinning the announcements continue to apply. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market announcements.
The information in this announcement that relates to exploration results (including JORC tables) is based on and fairly
represents information and supporting documentation prepared, reviewed and approved by Mr Sean Halpin, a competent
person who is a member of the Australian Institute of Geoscientists (AIG). Mr Sean Halpin is employed by Raiden Resources
Limited. Mr Sean Halpin has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
JORC Code. Mr Sean Halpin has provided his prior written consent as to the form and context in which the exploration results
and the supporting information are presented in this announcement.
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”, “believe(s)”,
“will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forward-looking statements.
These statements include, but are not limited to statements regarding future production, resources or reserves and
exploration results. All of such statements are subject to certain risks and uncertainties, many of which are difficult to
predict and generally beyond the control of the Company, that could cause actual results to differ materially from those
expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties
include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of
mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade,
planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined,
(iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks
related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing
on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects,
properties and business strategy. Investors are cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and the Company does not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the
occurrence of or non-occurrence of any events.
Page 11 of 20
ASX RELEASE | 19 May 2025
About Raiden Resources
Raiden Resources Limited (ASX:RDN / DAX:YM4) is a dual listed base metal & gold exploration Company focused on
identifying and discovering significant and economically attractive mineral deposits. Driven by a passion for unlocking
discoveries that create shareholder value and the support of a strong corporate treasury, Raiden is committed to achieving
exploration success.
The Company’s portfolio of projects includes the Andover South lithium project. The Company also holds the rights to
the advanced Mt Sholl nickel-copper-cobalt-PGE and the Arrow gold projects in the Pilbara region of Western Australia.
In addition, the Company holds the rights to multiple projects in the emerging and prolific Western Tethyan metallogenic
belt in Eastern Europe, where it has established a significant exploration footprint in Bulgaria.
Table 1: List of drilled holes and intercepts completed at the Vuzel Project as part of the Phase 2 drilling
program
Hole ID
WGS/UTM
Z35N EAST
WGS/UTM
Z35N NORTH
RL
Azimuth
Dip
Total
Depth
(m)
From
(m)
Length
(m)
Au ppm
VZ2412
366780
4619351
472
050
-50
50
2.5
47.5
0.53
VZ2413
366797
4619237
490
230
-50
200
4.1
21.5
0.31
VZ2514
366774
4619344
472
360
-50
100
0.0
56.0
1.09
including
7.0
8.0
1.50
including
47.7
8.3
4.94
150
0.0
22.0
0.36
and
71.0
23.2
0.57
including
81.0
6.5
1.44
150
2.1
21.4
0.40
including
2.1
9.1
0.66
VZ2515
VZ2516
VZ2517
VZ2518
366796
366797
366833
366834
4619237
4619235
4619232
4619233
490
491
498
498
340
300
010
330
-50
-50
-50
-50
100
0.0
24.8
1.96
including
0.0
13.3
3.40
and
57.0
17.0
0.41
100
0.0
14.5
0.45
including
4.5
4.5
1.04
and
60.0
25.6
0.67
including
74.7
10.9
1.23
16.3
1.2
1.81
VZ2519
366821
4619122
504
230
-50
50
VZ2520
366881
4619220
516
320
-50
150
Assays pending
VZ2521
366880
4619218
516
050
-50
100
Assays pending
VZ2522
367424
4619069
529
110
-50
150
Assays pending
VZ2523
367319
4618854
517
255
-50
100
Assays pending
Notes:
• All collar locations are reported as WGS / UTM Zone 35 N.
• Reported intercepts are estimated above a 0.1 ppm cut-off grade (COG).
• Maximum internal dilution below the applied COG included in the reported intercepts is 3m.
Page 12 of 20
ASX RELEASE | 19 May 2025
Table 2: JORC Code, 2012 Edition. Section 1.
Criteria
JORC Code explanation
Commentary
• Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling
• Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used
• Aspects of the determination of
mineralisation that are Material to the
Public Report
• In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc)
• Sampling comprises only wireline diamond
drilling core in PQ and HQ diameter sizes
• Core was drilled through the full expected
mineralisation intersection, as normal to the
strike as possible, in accordance with the
initial interpretation of the expected
mineralisation
• Half core HQ or quarter core PQ core, cut
along the core axis, has been used for
sampling, comprising the full downhole
length
• If the core is strongly fractured, the material
is sampled with a trowel
• All geological breaks, including lithology,
alteration, oxidation, etc., are considered in
the process of sample length selection
• The average down-hole sample length is
between 1m and 3m. In relatively rare
cases the length is below or above the
minimum and maximum, depending on the
geology and mineralization potential of the
interval
• Individual sample weights are between 4-6
kg
• All sampling practices meet industry
standards
• Drilling
techniques
• A total of 12 drill holes with a total length of
1,400m have been completed to date in
2025-year drilling campaign
• Total planned meters for 2025 is 2,200m,
with potential to expand on the program
• The drilling campaigns are targeting zones
of gold mineralization, initially outlined by
earlier exploration activities including
mapping, soil sampling, trenching and
historical drilling
• In order to enhance the drilling efficiency
and core recovery, a triple tube and drilling
fluid additives such as polymer and
bentonite, were used
• All of the drilling is inclined, predominantly
dipping at 50 degrees. The drill hole collars
were designed in accordance with the initial
interpretation of the mineralization zone,
aiming to intercept it as close to true
thickness as possible
• Each hole has a down-hole survey, made
approximately at 25m intervals using a
digital down-hole survey tool (“DeviShot”)
• The used drilling equipment is in good
Page 13 of 20
ASX RELEASE | 19 May 2025
Criteria
JORC Code explanation
Commentary
condition, provided and operated by local
drilling subcontractor, with wide experience
in SE Europe (“Geops”)
• Drill sample
recovery
• Method of recording and assessing
core and chip sample recoveries and
results assessed
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material
• Core recovery is logged as percent of the
core recovery length versus drill run length,
and it is logged directly in the core boxes,
immediately after the core is transported to
the field core shed
• Through the drilling process, to maximize
the core recovery, triple core tube and
additive drilling muds and polymers were
used
• Overall diamond core recovery is above
90%
• There doesn’t appear to be a relationship
bias between grade and length, or sample
weight and recovery
• Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the
relevant intersections logged
• Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples
• Measures taken to ensure that the
• Core logging by competent trained
geologists includes lithology, hydrothermal
alteration, mineralization, oxidation stage,
core recovery, RQD and degree of
fracturing, structural logging
• 100% of the core is photographed
• 100% of the drilled core has been logged
• Each day the drill core is transported to the
company’s core storage facility in the
village of Stremci, located approximately
5km from the field, for logging and sampling
• The core trays are plastic, including plastic
covers to protect the core from damage
during transport
• After drilling the hole, the collar was capped
and labeled
• Core logging is done on laptops, using MS
Excel spread sheets, and the data is then
incorporated into the company’s database
• Photo documentation is done on wet trays,
and the data is also incorporated in the
database
• Logging procedures meet industry
standards, and are appropriate for further
Mineral Resource Estimation and studies
• All of the current drilled core is sampled.
• All intact core samples are cut along the
long axis, using a core saw, half core HQ
(or quarter PQ) is packed in a labeled bag,
weighed, and further transported to
laboratory for sample processing and
assaying. In case of intensively fractured
zones, samples are taken with a trowel
• Rock density measurements were not
completed, although intervals, with length of
10cm, in a step of between 5 and 10m were
selected in the process of core logging for
density measurement
Page 14 of 20
ASX RELEASE | 19 May 2025
Criteria
JORC Code explanation
Commentary
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling
• Whether sample sizes are appropriate
to the grain size of the material being
sampled
• Quality of
assay data
and laboratory
tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times, calibrations
factors applied and their derivation,
etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and
precision have been established
• All samples are transported to ALS
Romania - Rosia Montana, where they are
pre-processed and assayed
• Through the sample preparation process,
the entire sample is crushed to passing
70% at < 2mm and then pulverize up to
250g with 85% passing 75 um. The pulp is
analyzed with Fire Assay-Atomic
Absorption Ore Grade Method: Au-AA25
• The lower detection limit of the laboratory is
0.01 ppm Au
• The Quality Assurance and Quality Control
scheme (QA/QC) comprises approximately
20 % from the total assays (each 5-th
sample is QAQC), including blanks,
reference material standards (CRMs) and
field duplicates
• The received results of the CRMs (Geostat
PTY and OREAS), a quarter field duplicate
sample), and the blank material collected
from barren industrial sediments are
meeting the standards and confirming the
representativeness of the data
• Pulp and coerce rejects from the laboratory
are and will be stored in the core
company’s storage facility in Stremci
• The QA/QC design and results are
adequate to support estimation of Mineral
Resources
• Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel
• The use of twinned holes
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols
• Discuss any adjustment to assay data
• No twin holes have been completed as the
drilling at Vuzel is still in the early stages
• All the assay results were received
electronically as an Excel spreadsheet,
along with the corresponding quality
certificates from the laboratory
• All data was incorporated in the database
by the database manager
• The access to the database is limited to
authorised employees
• The only adjustment of the assay data is
the replacement of the lower detection limit
of 0.01 ppm to the half of it – 0.005ppm Au
• All data is received and stored securely in
digital format in the Company's database
• Final data is rigorously interpreted by
Raiden’s geoscientific personnel
• Location of
• Accuracy and quality of surveys used
• Raiden’s collars surveyed by handheld
Page 15 of 20
ASX RELEASE | 19 May 2025
Criteria
JORC Code explanation
Commentary
data points
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation
• Specification of the grid system used
• Quality and adequacy of topographic
control
GPS with an accuracy of +/- 5m
• Co-ordinates are provided in WGS / UTM
Zone 35 N
• In the time of writing this report a detailed
(cm accuracy) survey of the hole collars
has been completed, but the report is still
not available, hence the data is not
incorporated herein.
• The holes have a downhole survey, taken
at 25 m intervals using Devico survey tool
• 4 degrees positive magnetic declination
was considered in the process of rig
alignment
• Data spacing
and
distribution
• Data spacing for reporting of
Exploration Results
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied
• Whether sample compositing has
been applied
• The drilling grid of the current exploration
holes is aiming to advance the initial
interpretation of the mineralization strike
extent. Several further target areas of
drilling are planned, with approximately drill
spacing of between 50 and 100m
• The hole collars and the sampling spacing
in the completed drilling is sufficient to
confirm continuation of the mineralization
• Sample compositing for metallurgical
testing has not been completed, but is
planned for the second half of 2025
• Orientation of
data in relation
to geological
structure
• All the exploration holes were designed to
intercept the expected dip of the
mineralisation as perpendicular as possible
in order to provide approximate true width
intercepts, and to avoid any sampling
biases
• Sample
security
• Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material
• The measures taken to ensure sample
security
• Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data
• No reviews or audits have been undertaken
• The sample chain of custody is managed
by Raiden
• The core storage is located in the village of
Stremci, and the transportation to the ALS
Romania - Rosia Montana laboratory was
done by courier company – TNT Bulgaria,
part of FedEx Express
• All samples were delivered directly to the
associated carrier by Raiden contractor
personnel before being transported to the
laboratory in Rosa Montana, Romania for
final analysis
Page 16 of 20
ASX RELEASE | 19 May 2025
Table 3: JORC Code, 2012 Edition. Section 2. (Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
• Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a li
Share your feedback
Discover