Amended ASX Release - Roebourne Lithium Project Review
Released
Released
Announcement PDF
ASX RELEASE | 20th June 2023
AMENDED ASX ANNOUNCEMENT
The Board of Raiden Resources Limited (ASX: RDN “Raiden” or “the Company”) provides the
following as an amendment to the Announcement released on Monday 19 June 2023.
The announcement has been amended to include a JORC Table 1 and related information.
This announcement has been authorised for release by the Board of Raiden Resources Limited.
Kyla Garic
Non-Executive Director & Company Secretary
E: info@raidenresources.com.au
Page 1 of 14
P 08 6158 9990 F 08 6268 4926
Suite 7, 63 Shepperton Road, Victoria Park, 6100
Australia
ASX RELEASE | 20th June 2023
ROEBOURNE LITHIUM PROJECT
REVIEW CONFIRMS HIGH PROSPECTIVITY
Highlights
•
•
Review and compilation of available geophysical data highlights
Li-bearing pegmatite potential of the Roebourne Project
completed
Geophysical interpretation of intrusive body confirms presence of
Andover Complex, host to lithium bearing pegmatites at Azure’s
(ASX: AZS) Andover Project located adjacent to Roebourne
ASX CODE: RDN
DAX CODE: YM4
BOARD &
MANAGEMENT
Non-Executive
Chairman
Mr Michael Davy
Managing Director
Mr Dusko Ljubojevic
o Azure drilling only 3km south of Raiden’s Roebourne Project
Non-Executive Director
Mr Dale Ginn
•
Shallow transported material over Raiden’s Roebourne Project
obscures underlying geology
Non-Executive Director
& Company Secretary
Ms Kyla Garic
•
Raiden to commence field reconnaissance planning work for
evaluation of potential host geology within its project areas,
including the Mt Sholl Project area, which is within 1.7km’s of
GreenTech’s (ASX: GRE) recent Ruth Well Project high-grade Li
pegmatite discoveries
Chief Operating Officer
Mr Warrick Clent
ASSET PORTFOLIO
SERBIA
Cu & Au (~150km2)
Raiden Resources Limited (ASX: RDN) (“Raiden” or “the
Company”) is pleased to announce that it has completed its review of
the available historical and geophysical data for its Roebourne Lithium
Project (E47/4603) located in the Pilbara region of Western Australia.
BULGARIA
Cu, Au & Ag (~409km2)
AUSTRALIA
Au, Cu, Ni & PGE
(~840km2)
Mr Dusko Ljubojevic, Managing Director of Raiden commented:
“We are excited by this recent analysis of the Roebourne Project, showing
potential for lithium bearing pegmatite mineralisation. Our initial focus on Roebourne was for
nickel-copper mineralisation, which we believe is viable and will add to the overall Ni-Cu-PGE
potential within the scope of the Mt Sholl project. The analysis of the available geophysical
data sets strongly indicates that the project hosts the right rocks and is prospective for
Page 2 of 14
ASX RELEASE | 20th June 2023
pegmatite hosted lithium mineralisation, as has been demonstrated by Azure Minerals
immediately to the south of Roebourne.”
Raiden considers that based on interpretation of the historical, and more recent available
datasets, that there exists a high prospectivity for pegmatites on its Roebourne Lithium
Project.
This is based on the understanding that the rocks underlying Raiden’s tenure, obscured by
shallow transported cover, exhibit a consistent magnetic signature which shows the Andover
Complex to be of a larger area than previously mapped (see Figure 1).
As can be seen in recent drilling results at Azure Minerals Ltd (ASX: AZS) Andover Lithium
Project1, on adjacent tenements, the rocks of the Andover complex are a suitable geological
host for high-grade lithium-bearing pegmatites.
Figure 1: Roebourne Project Location – lithology over open file 40m RTP TMI 1VD Magnetics
Page 3 of 14
ASX RELEASE | 20th June 2023
It should be noted that in addition to the known lithium prospectivity of the Andover
complex, as shown by recent Azure Mineral Ltd drill results, that the potential for lithiumbearing pegmatites has also been shown in related geological units within the district. None
more so than at GreenTech Metals Ltd (ASX: GRE) recent discovery of high-grade lithiumbearing pegmatites2, in analogous rocks, at their Ruth Well Project 30km west of Roebourne.
Raiden is now in the process of planning field reconnaissance work on potential host geology
within its project areas, including the Mt Sholl Project area adjacent to GreenTech’s Ruth
Well Project (see Figure 2). Updates on this work will be provided to the market as they come
to hand.
Figure 2: Mt Sholl Project Location with GreenTech’s Ruth Well Project tenements3
Page 4 of 14
ASX RELEASE | 20th June 2023
This ASX announcement has been authorised for release by the Board of Raiden
Resources Limited.
FOR FURTHER INFORMATION PLEASE CONTACT
DUSKO LJUBOJEVIC
Managing Director
RAIDEN RESOURCES LIMITED
dusko@raidenresources.com.au
www.raidenresources.com.au
ASX Announcements referenced to directly in this release
1
ASX:AZS 13 June 2023 Exceptional Lithium Drill Intersections from Andover
2
ASX:GRE 15 June 2023 High-grade Lithium Discovered at Ruth Well Project
3
ASX:RDN 3 April 2023 Maiden Mineral Resource Estimate & JORC Exploration Target
Competent Person's Statement
The information in this announcement from the 3 April 2023 that relates to exploration results, including the
Mineral Resources contained within the Production Target (and forecast financial information derived from the
production targets) at the Mt Sholl Project has previously been released to the ASX. The Company confirms that
it is not aware of any information or data that materially affects the information included in the market
announcement, and that all material assumptions and technical parameters underpinning the announcement
continue to apply. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
The information in this announcement that relates to exploration results (Including JORC Tables) is based on and
fairly represents information and supporting documentation prepared, reviewed and approved by Mr Warrick
Clent, a competent person who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr
Warrick Clent is employed by Raiden Resources Limited. Mr Warrick Clent has sufficient experience that is relevant
to the style of mineralisation and type of deposits under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 edition of the JORC Code. Mr Warrick Clent has provided
his prior written consent as to the form and context in which the exploration results and the supporting
information are presented in this announcement.
Mineral Resources
The Company confirms it is not aware of any new information or data that materially affects the information
included in the announcement released on 3 April 2023 footnoted at 3 above and all material assumptions and
technical parameters underpinning the estimate continue to apply and have not materially changed when
referring to its resource announcement. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Page 5 of 14
ASX RELEASE | 20th June 2023
Mineral Resources Estimate
The Mineral Resource statement as reported on the 3 April 2023 is as follows:
Mt Sholl Mineral Resource Estimate by classification reported above a 0.35% Ni_Eq cut-off for open pit
resources and at 0.5% Ni_Eq for underground resources
Tonnes
Mt
Ni
%
Cu
%
Co
ppm
3E1
g/t
Ni Metal
kt
Cu Metal
kt
3E
(Pd, Pt, Au)
oz
Indicated
10.5
0.39
0.45
134
0.32
41.0
47.3
108,031
Inferred
9.8
0.29
0.32
78
0.32
28.4
31.3
100,715
Total
20.3
0.34
0.39
107
0.32
69.34
78.6
208,745
3.1
0.48
0.47
57
0.25
14.9
14.6
24,898
Classification
Open Pit
Underground
Inferred
Notes:
•
•
•
•
•
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code –JORC 2012 Edition).
Data is reported to significant figures and differences may occur due to rounding.
Mineral Resources have been reported above a cut-off grade of 0.35 % Nickel equivalent for open pit resources and above
0.5% Nickel equivalent for underground resources.
Bulk densities in the Basal unit are 3.06 and in Zone2 are 2.91. These figures represent averages of the values collected in
the respective domains from the 2022 drill program.
The Ni_Eq calculation represents total metal value for each metal summed and expressed in equivalent nickel grade and
tonnes. Commodity prices assumed in the calculation are noted below as is the formula used to calculate Ni_Eq.
Page 6 of 14
ASX RELEASE | 20th June 2023
Disclaimer:
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)”, “potential(s)”and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future production,
resources or reserves and exploration results. All of such statements are subject to certain risks and
uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that
could cause actual results to differ materially from those expressed in, or implied or projected by, the forwardlooking information and statements. These risks and uncertainties include, but are not limited to: (i) those
relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and
conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining
dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii)
the potential for delays in exploration or development activities or the completion of feasibility studies, (iv)
risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain
adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals
or in the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Investors are cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and the Company does not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
About Raiden Resources
Raiden Resources Limited . (ASX:RDN / DAX:YM4) is a dual listed base metal—gold exploration Company
focused on the Mt Sholl nickel-copper-cobalt- PGE project in the Pilbara region of Western Australia project.
In addition, the company holds other highly prospective gold projects within the Pilbara region, as well as the
emerging and prolific Western Tethyan metallogenic belt in Eastern Europe, where it has established a
significant exploration footprint in Serbia and Bulgaria.
The Directors believe the Company is well positioned to unlock value from this exploration portfolio and deliver
a significant mineral discovery.
Page 7 of 14
ASX RELEASE | 20th June 2023
JORC Code, 2012 Edition. Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative nature
of the samples.
• Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
• In relation to this announcement no sampling
has been conducted as yet and no assays are
being reported
Drilling
techniques
Drill sample
recovery
Logging
Page 8 of 14
• In relation to this announcement no drilling
has been conducted as yet and no assays are
being reported
• In relation to this announcement no sampling
has been conducted as yet and no assays are
being reported
• In relation to this announcement no drilling
has been conducted as yet.
ASX RELEASE | 20th June 2023
Criteria
Subsampling
techniques
and sample
preparation
JORC Code explanation
Commentary
mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core taken.
•
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
Not applicable
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and laboratory
•
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
Verification
of sampling
and
assaying
• The verification of significant intersections by either independent or alternative • Not applicable
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Page 9 of 14
Not applicable
ASX RELEASE | 20th June 2023
Criteria
JORC Code explanation
Commentary
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Co-ordinates are provided in the Geocentric
Datum of Australia (GDA94) Zone 50.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Not applicable
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Not applicable
Sample
security
• The measures taken to ensure sample security.
• Not applicable.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
• Not applicable
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
• Raiden Resources Ltd tenements are located in the City of
Karratha, within the Pilbara region of Western Australia.
• The tenements are held by either by Raiden Resources Ltd 100%,
Page 10 of 14
ASX RELEASE | 20th June 2023
Criteria
JORC Code explanation
Commentary
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
or Raiden Resources Ltd 80%/Welcome Exploration Pty Ltd 20%.
• All tenements other than E47/4603, which is in the application
stage, are granted tenure
• Tenements are located on the Mt Welcome pastoral lease.
• Raiden is not aware of any existing impediments nor of any
potential impediments which may impact ongoing exploration and
development activities at the project sites.
Exploration done by
other parties
• Acknowledgment and appraisal of exploration by
other parties.
• A search and compilation of historic exploration has been
completed.
• Work included stream sediment, soil and rock sampling,
geological mapping, and geophysical surveys.
Geology
• Deposit type, geological setting and style of
mineralisation.
• Potential for lithium-caesium-tantalum bearing pegmatite
mineralisation.
• Mt Sholl Project geological setting - paleoarchean greenstone
rocks intruded by Mesoarchean mafic-ultramafic intrusive
complex associated with widespread disseminated to matrix and
stringer pyrrhotite-pentlandite-chalcopyrite mineralisation.
Mesoarchean mylonite in the Sholl Shear Zone north of the
property, with lode gold mineralisation in related subsidiary
structures.
• Roebourne Project geological setting – previous explorers
considered the area to be part of the Ruth Well Formation (Mafic
and ultramafic volcanic and intrusive rocks; minor chert;
metamorphosed), however this new interpretation shows that the
rocks of the Andover Intrusion/Complex (Archean-age maficultramafic intrusion) extend under cover further to the north than
previously suggested.
• It is further interpretated that the source of mineralising fluids for
the lithium pegmatites are sourced from nearby felsic intrusive
Page 11 of 14
ASX RELEASE | 20th June 2023
Criteria
JORC Code explanation
Commentary
bodies, these being the Black Hill Well Monzogranite for the
Roebourne Project, and the Cleland Supersuite rocks for the Mt
Sholl Project area.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data aggregation
methods
• Not applicable
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
Page 12 of 14
• Not applicable
ASX RELEASE | 20th June 2023
Criteria
JORC Code explanation
Commentary
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
known’).
Diagrams
• Maps are included in the body of the announcement.
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Balanced reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
• All historic results are reported as they have been released to the
ASX by the previous companies.
• In relation to this announcement no sampling has been conducted
as yet and no assays are being reported
Other substantive
exploration data
• Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
• The underlying aeromagnetic data that forms the basis for
reinterpretation of the Andover Complex rocks, as described in the
body of the announcement, was sourced from open file GSWA
data available through the MAGIX system at:
Page 13 of 14
• Not applicable
https://geodownloads.dmp.wa.gov.au/downloads/geophysics/7220
4/WA_Magnetics_40m/
ASX RELEASE | 20th June 2023
Criteria
JORC Code explanation
Commentary
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Further work
Page 14 of 14
• The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
• Raiden are currently planning a field reconnaissance program to
further assess the potential for lithium-bearing pegmatites over its
Roebourne and Mt Sholl Projects.
Share your feedback
Discover